I applied via Approached by Company and was interviewed in Jul 2022. There was 1 interview round.
Launching/marine activities/piling/rcd/vendor management/credits/leadership/teamwork
I applied via Approached by Company and was interviewed before Oct 2022. There were 2 interview rounds.
Extra Dose bridge has additional support structures while cable stay bridge uses cables to support the bridge deck.
Extra Dose bridge has additional piers or columns for support.
Cable stay bridge uses cables attached to towers to support the bridge deck.
Extra Dose bridge is more common for shorter spans while cable stay bridge is used for longer spans.
Cable stay bridges have a more modern and sleek appearance compared t
Types of contracts include express, implied, unilateral, bilateral, and voidable contracts.
Express contract: Clearly stated terms and conditions, either written or verbal.
Implied contract: Terms inferred from the actions or conduct of the parties involved.
Unilateral contract: One party makes a promise in exchange for the performance of an act by the other party.
Bilateral contract: Both parties exchange promises to perf...
posted on 12 Jul 2023
I applied via Company Website and was interviewed before Jul 2022. There were 3 interview rounds.
Costing involves calculating the expenses associated with maintenance activities. Manpower handling involves managing and coordinating the workforce.
Costing in maintenance involves determining the costs of spare parts, equipment, labor, and other resources required for maintenance activities.
Manpower handling includes assigning tasks to technicians, scheduling shifts, providing training, and ensuring safety regulations...
I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.
Apco Infratech interview questions for popular designations
I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.
IS code for BBS is IS 1786:2008
IS 1786:2008 is the Indian Standard code for specifications of high strength deformed steel bars for concrete reinforcement
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars with their lengths and shapes required for construction
Following IS 1786:2008 ensures the quality and strength of the reinforcement bars used in construction projects
Get interview-ready with Top Apco Infratech Interview Questions
I applied via Company Website and was interviewed in Jul 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Aug 2021. There were 5 interview rounds.
Steel wastage can be controlled by proper planning, material handling, and inventory management.
Use accurate measurements and cutting techniques to minimize scrap
Ensure proper storage and handling of steel to prevent damage and corrosion
Implement inventory management systems to track usage and reduce over-ordering
Train workers on proper handling and cutting techniques to minimize errors
Reuse or recycle scrap steel when
The quantity of cement & fly ash in M40 grade concrete varies based on the mix design.
M40 grade concrete requires a minimum of 400 kg of cement per cubic meter of concrete.
Fly ash can be used as a partial replacement for cement in concrete.
The percentage of fly ash used in the mix design can range from 0-30%.
The exact quantity of cement and fly ash in M40 grade concrete depends on the specific mix design being used.
Deduction of steel for a 45 & 90 degree bend
For a 45 degree bend, deduct 1.5 times the diameter of the bar
For a 90 degree bend, deduct 2 times the diameter of the bar
This deduction is necessary to account for the length of the bend
The deduction varies based on the diameter of the bar being bent
The deduction is typically specified in the design drawings or codes
I have experience in managing operations, overseeing staff, and implementing strategic plans.
Managed day-to-day operations of a retail store, including inventory management and customer service
Oversaw a team of 20 employees, providing training and guidance to ensure productivity and efficiency
Implemented a new sales strategy that resulted in a 15% increase in revenue within the first quarter
The Assistant General Manager for the highway section is responsible for overseeing the operations and maintenance of the highway, ensuring safety and efficiency.
Oversee maintenance and operations of the highway section
Ensure safety and efficiency of the highway
Coordinate with various departments and stakeholders
Implement policies and procedures to improve highway performance
I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.
Top trending discussions
Some of the top questions asked at the Apco Infratech interview -
The duration of Apco Infratech interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 129 interviews
Interview experience
based on 1.1k reviews
Rating in categories
Mumbai
10-20 Yrs
â‚ą 9.23-15.5 LPA
Senior Engineer
135
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Assistant Manager
134
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Site Engineer
91
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Deputy Manager
76
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Store Officer
69
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Larsen & Toubro Limited
GMR Group
Reliance Infrastructure
IRB Infrastructure