Filter interviews by
I applied via Company Website and was interviewed in Apr 2023. There were 2 interview rounds.
The company was founded in 1995 and specializes in data management services.
Founded in 1995
Specializes in data management services
Has a team of experienced data entry operators
Provides accurate and timely data entry services to clients
Has a proven track record of delivering high-quality work
Maintaining higher and lower cadre employees involves different strategies.
Higher cadre employees may require more challenging work and opportunities for growth and development.
Lower cadre employees may need more support and training to improve their skills and performance.
Regular performance evaluations and feedback can help both groups improve and stay motivated.
Creating a positive work culture and offering competiti...
Maintaining work involves ensuring accuracy, completeness, and timely completion of assigned tasks.
Regularly checking and updating data entries
Following established procedures and guidelines
Communicating with team members and supervisors
Identifying and resolving errors or discrepancies
Prioritizing tasks based on deadlines and importance
A motor is a device that converts electrical energy into mechanical energy to perform work.
Motors are commonly used in various applications such as electric vehicles, industrial machinery, and household appliances.
They come in different types such as AC motors, DC motors, and stepper motors.
Motor capacity refers to its power rating, typically measured in horsepower (HP) or kilowatts (kW).
Higher capacity motors can gene...
I applied via Walk-in and was interviewed in Jun 2023. There were 2 interview rounds.
The process of making a minor bridge involves planning, design, construction, and inspection.
1. Planning phase involves determining the location, size, and type of bridge needed.
2. Design phase includes creating detailed drawings and calculations for the bridge structure.
3. Construction phase involves building the foundation, supports, and deck of the bridge.
4. Inspection phase ensures the bridge meets safety and quali...
Piling point can be assured by conducting thorough soil investigation, using appropriate piling equipment, and monitoring the piling process.
Conduct soil investigation to determine soil conditions and suitability for piling.
Select appropriate piling equipment based on soil conditions and project requirements.
Monitor the piling process to ensure proper installation and alignment of piles.
Perform load tests on completed
I applied via Campus Placement and was interviewed in Nov 2023. There were 2 interview rounds.
Material received and issue
Basic computer knowledge ms excel,sapmm
Apco Infratech interview questions for popular designations
I applied via Naukri.com and was interviewed in May 2023. There were 2 interview rounds.
Get interview-ready with Top Apco Infratech Interview Questions
I applied via Recruitment Consulltant and was interviewed in Jul 2023. There were 4 interview rounds.
Details of my project, my native place, previous company working culture.
F2F through WhatsApp Vedio call.
I applied via Company Website and was interviewed before Jun 2023. There were 2 interview rounds.
The process of Water Treatment Plant (W.T.P) involves various stages to purify water for consumption.
1. Coagulation: Adding chemicals to water to make particles clump together.
2. Sedimentation: Allowing the clumped particles to settle at the bottom.
3. Filtration: Passing water through filters to remove remaining particles.
4. Disinfection: Adding chlorine or other chemicals to kill bacteria and viruses.
5. Distribution: ...
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
Fire is a chemical reaction that releases heat and light. It has four classifications.
Fire is a rapid oxidation process that produces heat and light.
The four classifications of fire are Class A, Class B, Class C, and Class D.
Class A fires involve ordinary combustibles like wood, paper, and cloth.
Class B fires involve flammable liquids and gases like gasoline and propane.
Class C fires involve electrical equipment like a...
Bridge construction involves several stages from planning to completion.
Planning and design
Site preparation and foundation work
Substructure construction
Superstructure construction
Finishing and maintenance
Examples of bridge types: suspension, cable-stayed, arch, beam, truss
Pilling is the formation of small balls of fibers on the surface of a fabric.
Pilling occurs due to friction and abrasion on the fabric surface.
It is more common in synthetic fabrics than natural ones.
Pilling can be prevented by using fabric softeners, washing clothes inside out, and avoiding high heat in the dryer.
Pilling can be removed using a fabric shaver or a lint roller.
Pilling is not a sign of poor quality fabric
Noise is classified as any sound above 85 decibels.
Noise levels above 85 decibels can cause hearing damage.
Examples of noise levels: normal conversation - 60 decibels, heavy traffic - 85 decibels, rock concert - 110 decibels.
It is important to wear hearing protection in noisy environments.
I was interviewed in Aug 2023.
Top trending discussions
Some of the top questions asked at the Apco Infratech interview -
The duration of Apco Infratech interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 129 interviews
Interview experience
based on 1.1k reviews
Rating in categories
Mumbai
10-20 Yrs
₹ 9.23-15.5 LPA
Senior Engineer
134
salaries
| ₹4.2 L/yr - ₹11.1 L/yr |
Assistant Manager
116
salaries
| ₹5.2 L/yr - ₹15.5 L/yr |
Site Engineer
91
salaries
| ₹3 L/yr - ₹7 L/yr |
Deputy Manager
76
salaries
| ₹5.8 L/yr - ₹18 L/yr |
Civil Site Engineer
69
salaries
| ₹1.8 L/yr - ₹7.2 L/yr |
Larsen & Toubro Limited
GMR Group
Reliance Infrastructure
IRB Infrastructure