The boom length of a tower crane varies depending on the model and manufacturer.
Tower crane boom length can range from 30 meters to over 100 meters.
The boom length determines the maximum height and reach of the crane.
Factors such as weight capacity and wind speed also affect the boom length.
Some popular tower crane models and their boom lengths include: Potain MDT 98 (55 meters), Liebherr 630 EC-H 40 (40 meters), and T
I applied via Company Website
With wise president and Technical director
I applied via Company Website and was interviewed before Oct 2022. There were 3 interview rounds.
I am available for the project and can commit to the required time and effort.
I am currently not committed to any other projects
I have the necessary skills and experience to contribute effectively
I am willing to adjust my schedule if needed for the project
I am excited about the opportunity to work on this project
Components of bridges include abutments, piers, deck, superstructure, substructure, and foundation.
Abutments provide support at the ends of a bridge.
Piers support the bridge deck in the middle.
Deck is the surface that vehicles travel on.
Superstructure includes beams, girders, and trusses.
Substructure supports the superstructure and transfers loads to the foundation.
Foundation transfers the bridge loads to the ground.
Ex...
Bearings are structural components used to support and facilitate movement between two structural elements.
Types include roller bearings, ball bearings, plain bearings, and fluid bearings.
Roller bearings use cylindrical rollers to support heavy loads.
Ball bearings use balls to reduce friction between two surfaces.
Plain bearings have a sliding surface with no rolling elements.
Fluid bearings use a thin layer of liquid or
The major bridge I executed had a continuous span arrangement with multiple spans.
The major bridge had a continuous span arrangement with multiple spans
The span arrangement was designed to accommodate the required length and load capacity
The spans were connected seamlessly to ensure structural integrity and stability
I applied via Company Website and was interviewed before Jul 2023. There was 1 interview round.
AECOM interview questions for popular designations
Get interview-ready with Top AECOM Interview Questions
I applied via Company Website and was interviewed in May 2022. There were 4 interview rounds.
All technical and discuss and all typ. Of project discuss
I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Mar 2022. There was 1 interview round.
Sir casting yard area, bed alignment of survey department properly center shuttering palet panchang,and line perfect condition,
Precast segment- properly casting yard area bed alignment and survey department cordinate with checking proper center line, segment shuttering perfect ag pr drowning dimension, jig properly arrengement of bed area
What people are saying about AECOM
The duration of AECOM interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 91 interviews
Interview experience
based on 1.6k reviews
Rating in categories
Project Engineer
226
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
189
salaries
| ₹0 L/yr - ₹0 L/yr |
L2 Engineer
146
salaries
| ₹0 L/yr - ₹0 L/yr |
Architect
131
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
126
salaries
| ₹0 L/yr - ₹0 L/yr |
Jacobs Engineering Group
Fluor Corporation
Bechtel
Worley