The ratio of M25 concrete is 1:1:2 (cement:sand:aggregate)
The ratio of M25 concrete is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.
This ratio is commonly used in construction for medium strength concrete.
For example, to make 1 cubic meter of M25 concrete, you would need 1/4 cubic meters of cement, 1/4 cubic meters of sand, and 1/2 cubic meters of aggregate.
As an Assistant Engineer - Civil at my previous company, my responsibilities included assisting senior engineers in project planning, design, and construction.
Assisted senior engineers in project planning and design
Participated in site visits and inspections
Prepared project reports and documentation
Collaborated with team members and contractors
Ensured compliance with safety regulations and quality standards
Managed site operations, coordinated with contractors, ensured compliance with safety regulations.
Managed day-to-day site operations
Coordinated with contractors for timely completion of projects
Ensured compliance with safety regulations and quality standards
Prepared progress reports and communicated with stakeholders
Implemented cost-saving measures without compromising quality
The name of the client is XYZ Construction Company.
XYZ Construction Company is a well-known construction firm in the region.
They have completed several projects in the past, including the construction of a new office building in downtown.
The client has a reputation for high-quality work and timely project completion.
posted on 20 Jun 2024
Hydraulic refers to the study of fluids in motion and the engineering applications of fluid mechanics.
Hydraulic engineering involves the design and construction of structures that control the flow and pressure of liquids, such as dams, canals, and pipelines.
Hydraulic systems use fluid pressure to generate, control, and transmit power, commonly found in machinery like hydraulic lifts and brakes.
Hydraulic principles are ...
I applied via Recruitment Consulltant and was interviewed in Dec 2022. There were 3 interview rounds.
As per your cv details
I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.
posted on 22 Mar 2024
I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Nov 2020. There were 3 interview rounds.
I applied via Referral and was interviewed in Feb 2022. There were 2 interview rounds.
Answering questions related to projects, dynamic analysis, toughest project, pile foundations, and steel connection design.
Projects handled: Mention the types of projects, their scale, and your role in them.
Dynamic analysis methods: Explain different methods like time history analysis, response spectrum analysis, etc.
Modal combination methods: Discuss different methods like CQC, SRSS, ABS, etc., and their differences.
T...
OPC 43 and 53 cement differ in their compressive strength. Using 43 OPC instead of 53 OPC for M35 concrete may result in lower strength.
OPC 43 cement has a compressive strength of 43 MPa, while OPC 53 cement has a compressive strength of 53 MPa.
The higher compressive strength of OPC 53 cement makes it more suitable for structural applications.
Using OPC 43 cement instead of OPC 53 cement for M35 concrete may result in l...
based on 9 reviews
Rating in categories
Project Engineer
261
salaries
| ₹5.5 L/yr - ₹20 L/yr |
Senior Engineer
209
salaries
| ₹7.9 L/yr - ₹28 L/yr |
L2 Engineer
143
salaries
| ₹3.4 L/yr - ₹9.4 L/yr |
Architect
132
salaries
| ₹4.1 L/yr - ₹14.9 L/yr |
Engineer
127
salaries
| ₹3.2 L/yr - ₹14.5 L/yr |
Jacobs Engineering Group
Fluor Corporation
Bechtel
Worley