i
AECOM
Filter interviews by
My minimum expectation is to be given clear goals and expectations, adequate resources and support, and opportunities for growth and development.
Clear goals and expectations set by leadership
Adequate resources and support provided by the organization
Opportunities for growth and development within the role
Regular feedback and communication from supervisors
A positive and inclusive work environment
I applied via Naukri.com and was interviewed in Feb 2023. There were 2 interview rounds.
Tolerance limits in various structure members, specifically piles.
Tolerance limits in pile diameter can range from +/- 5mm to +/- 25mm depending on the design specifications.
Tolerance limits in pile length can range from +/- 100mm to +/- 300mm depending on the design specifications.
Tolerance limits in pile verticality can range from +/- 1% to +/- 5% depending on the design specifications.
Tolerance limits in pile alignm...
The minimum distance between piles to permit the bore successively depends on various factors such as soil conditions, pile diameter, and construction method.
The minimum distance between piles should be determined based on the soil conditions. If the soil is weak or loose, a larger distance between piles may be required to ensure stability.
The diameter of the piles also plays a role in determining the minimum distance....
Permission to fix barricade boards can be obtained from the local government or relevant authorities.
Permission can be obtained from the local municipality or city council.
In some cases, permission may need to be sought from the transportation department or highway authority.
The process of obtaining permission may involve submitting an application, providing details of the location and purpose of the barricade board.
Pe...
The depth of socketing required in a pile depends on various factors such as soil conditions, load requirements, and design standards.
Socketing depth is determined based on the type and strength of the soil.
It is also influenced by the load-bearing capacity required for the structure.
Design standards and codes provide guidelines for determining the socketing depth.
For example, in cohesive soils, socketing depth may be ...
Yes, shutter vibrator is relevant for a circular pier.
Shutter vibrator is used to compact concrete and remove air voids.
Circular piers also require proper compaction of concrete.
Shutter vibrator helps in achieving uniform and dense concrete in circular piers.
It ensures better strength and durability of the pier.
Example: In the construction of a circular bridge pier, a shutter vibrator would be used to ensure proper com
Digital marketing involves promoting products or services through online channels to reach a target audience.
Utilizes various online platforms such as social media, search engines, email, and websites
Involves strategies like SEO, SEM, content marketing, social media marketing, email marketing, and influencer marketing
Focuses on reaching and engaging with potential customers online to drive conversions and sales
Allows f...
AECOM interview questions for popular designations
I applied via Walk-in and was interviewed in Nov 2023. There was 1 interview round.
Get interview-ready with Top AECOM Interview Questions
I applied via LinkedIn
I applied via LinkedIn and was interviewed in Feb 2023. There were 3 interview rounds.
Interviewer asked me to fill a form about my skill, goals, and values
I tend to get too focused on details and may overlook the bigger picture.
I have a tendency to get bogged down in technical details and may need to remind myself to step back and look at the overall project goals.
I sometimes struggle with presenting technical information in a way that is easily understandable to non-technical stakeholders.
I am always working to improve my knowledge and skills in areas where I may be wea...
What people are saying about AECOM
The duration of AECOM interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 91 interviews
Interview experience
based on 1.6k reviews
Rating in categories
Project Engineer
233
salaries
| ₹5.5 L/yr - ₹20 L/yr |
Senior Engineer
198
salaries
| ₹7.7 L/yr - ₹24.5 L/yr |
L2 Engineer
143
salaries
| ₹3.4 L/yr - ₹10.5 L/yr |
Associate Director
133
salaries
| ₹24 L/yr - ₹49 L/yr |
Architect
130
salaries
| ₹4.1 L/yr - ₹14.9 L/yr |
Shapoorji Pallonji Group
Alstom Transportation
Saint-Gobain
AtkinsRealis