Civil Section Engineer
Civil Section Engineer Interview Questions and Answers

Asked in AECOM

Q. Tolerance limit in various structure members Pile
Tolerance limits in various structure members, specifically piles.
Tolerance limits in pile diameter can range from +/- 5mm to +/- 25mm depending on the design specifications.
Tolerance limits in pile length can range from +/- 100mm to +/- 300mm depending on the design specifications.
Tolerance limits in pile verticality can range from +/- 1% to +/- 5% depending on the design specifications.
Tolerance limits in pile alignment can range from +/- 10mm to +/- 50mm depending on the d...read more

Asked in AECOM

Q. Where do we obtain permission to install barricades?
Permission to fix barricade boards can be obtained from the local government or relevant authorities.
Permission can be obtained from the local municipality or city council.
In some cases, permission may need to be sought from the transportation department or highway authority.
The process of obtaining permission may involve submitting an application, providing details of the location and purpose of the barricade board.
Permission may also require adherence to specific regulation...read more

Asked in AECOM

Q. What is the minimum distance required between piles to allow for successive boring?
The minimum distance between piles to permit the bore successively depends on various factors such as soil conditions, pile diameter, and construction method.
The minimum distance between piles should be determined based on the soil conditions. If the soil is weak or loose, a larger distance between piles may be required to ensure stability.
The diameter of the piles also plays a role in determining the minimum distance. Larger diameter piles may require more space between them...read more

Asked in AECOM

Q. How deep is the socketing required for a pile?
The depth of socketing required in a pile depends on various factors such as soil conditions, load requirements, and design standards.
Socketing depth is determined based on the type and strength of the soil.
It is also influenced by the load-bearing capacity required for the structure.
Design standards and codes provide guidelines for determining the socketing depth.
For example, in cohesive soils, socketing depth may be specified as a certain percentage of the pile length.
In gr...read more

Asked in AECOM

Q. Is a shutter vibrator relevant for a circular pier?
Yes, shutter vibrator is relevant for a circular pier.
Shutter vibrator is used to compact concrete and remove air voids.
Circular piers also require proper compaction of concrete.
Shutter vibrator helps in achieving uniform and dense concrete in circular piers.
It ensures better strength and durability of the pier.
Example: In the construction of a circular bridge pier, a shutter vibrator would be used to ensure proper compaction of concrete.
Interview Questions of Similar Designations

Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary


Reviews
Interviews
Salaries
Users

