I applied via Referral and was interviewed before May 2022. There were 2 interview rounds.
Transformers are sized based on load requirements and voltage levels.
Determine the load requirements of the system
Calculate the required kVA rating based on the load requirements
Determine the voltage levels of the system
Select a transformer with a kVA rating and voltage levels that meet the requirements
Consider factors such as efficiency, temperature rise, and impedance when selecting a transformer
DG sizing depends on load demand, backup requirements, fuel availability, and budget.
Calculate the total load demand of the system
Determine the backup requirements and duration
Consider the availability of fuel and its cost
Evaluate the budget for the project
Select a DG with appropriate capacity and efficiency
Perform a feasibility study and cost-benefit analysis
Consider environmental regulations and noise restrictions
Ens
IEC codes and standards are international standards for electrical engineering.
IEC stands for International Electrotechnical Commission
IEC codes and standards ensure safety, reliability, and compatibility of electrical systems and equipment
Examples of IEC standards include IEC 60601 for medical electrical equipment and IEC 61850 for communication networks and systems in substations
Voltage drop is the reduction in voltage that occurs as electricity flows through a circuit due to resistance.
Calculate the total resistance of the circuit
Determine the current flowing through the circuit
Multiply the current by the total resistance to get the voltage drop
Use Ohm's Law (V=IR) to calculate voltage drop across individual components
Consider using voltage drop calculators or tables for more complex circuits
Choose cable based on voltage, current, temperature, environment and application.
Determine voltage and current requirements
Consider temperature range and environmental conditions
Choose cable type based on application (e.g. power, data, signal)
Select appropriate conductor material (e.g. copper, aluminum)
Check for any regulatory requirements or standards (e.g. NEC, UL)
Examples: THHN for indoor power, Cat6 for data transm
I'm sorry, I don't have the available data to answer this question.
Starters are used to control the starting current of motors.
Starters are used to limit the inrush current during motor starting.
They protect the motor from damage due to high starting current.
Types of starters include direct-on-line, star-delta, and soft starters.
Starters are commonly used in industrial and commercial applications.
Examples of applications include pumps, fans, and conveyor belts.
Breakers are electrical switches that protect circuits from overloading and short circuits.
Circuit Breaker - protects circuits from overloading and short circuits
Ground Fault Circuit Interrupter (GFCI) - protects against electrical shock in wet areas
Arc Fault Circuit Interrupter (AFCI) - protects against electrical fires caused by arcing
Main Breaker - controls power to the entire electrical panel
Miniature Circuit Break...
Top trending discussions
posted on 12 Oct 2024
I applied via campus placement at PSG College of Technology, Coimbatore and was interviewed in Sep 2024. There were 3 interview rounds.
General knowlegde, Basic Aptitude, Domain Technical MCQ
Genx vs Genz, Altitude and comparsion
Components of a transformer include core, windings, and insulation.
Core: Provides a path for magnetic flux
Windings: Primary and secondary coils for inducing voltage
Insulation: Prevents short circuits and ensures safety
MCB is a miniature circuit breaker used for low voltage applications, while MCCB is a molded case circuit breaker used for higher currents and voltages.
MCB is designed for low voltage applications, typically up to 1000V, while MCCB is designed for higher currents and voltages, typically up to 2500V.
MCB is usually thermal-magnetic in operation, while MCCB can be thermal-magnetic or electronic trip units.
MCB is compact i...
Different types of breakers include circuit breakers, fuse breakers, and ground fault circuit interrupters.
Circuit breakers: Automatically switch off electrical circuits during abnormal conditions.
Fuse breakers: Use a fuse to interrupt the circuit when overloaded.
Ground fault circuit interrupters (GFCI): Detect imbalances in current flow to prevent electrical shocks.
Miniature circuit breakers (MCB): Provide protection ...
I applied via Recruitment Consulltant and was interviewed before Jan 2024. There was 1 interview round.
Online interview and shared my experience.
posted on 11 Oct 2024
I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.
posted on 10 Jul 2024
I applied via Company Website and was interviewed in Apr 2023. There were 2 interview rounds.
Ohm's law states that the current through a conductor between two points is directly proportional to the voltage across the two points.
Ohm's law is represented by the equation I = V/R, where I is the current, V is the voltage, and R is the resistance.
It is named after Georg Simon Ohm, a German physicist who first formulated this law.
This law is applicable to all types of circuits, including DC and AC circuits.
It is use...
I applied via Walk-in and was interviewed in Mar 2023. There were 4 interview rounds.
The Loto system stands for Lockout/Tagout, a safety procedure used to ensure that dangerous machines are properly shut off and not started up again during maintenance or servicing.
Loto system involves locking the energy-isolating devices with individual lockout devices to prevent the machine from being turned on
Tagout involves placing a tag on the locked device to indicate that it should not be operated
Employees workin...
posted on 16 Dec 2023
Interview experience
based on 1 review
Rating in categories
Project Engineer
256
salaries
| ₹5.5 L/yr - ₹22 L/yr |
Senior Engineer
204
salaries
| ₹7.5 L/yr - ₹28 L/yr |
L2 Engineer
147
salaries
| ₹3.4 L/yr - ₹10 L/yr |
Architect
132
salaries
| ₹4.1 L/yr - ₹14.9 L/yr |
Engineer
127
salaries
| ₹3.2 L/yr - ₹14.5 L/yr |
Jacobs Engineering Group
Fluor Corporation
Bechtel
Worley