I applied via Naukri.com and was interviewed in Feb 2023. There were 2 interview rounds.
Tolerance limits in various structure members, specifically piles.
Tolerance limits in pile diameter can range from +/- 5mm to +/- 25mm depending on the design specifications.
Tolerance limits in pile length can range from +/- 100mm to +/- 300mm depending on the design specifications.
Tolerance limits in pile verticality can range from +/- 1% to +/- 5% depending on the design specifications.
Tolerance limits in pile alignm...
The minimum distance between piles to permit the bore successively depends on various factors such as soil conditions, pile diameter, and construction method.
The minimum distance between piles should be determined based on the soil conditions. If the soil is weak or loose, a larger distance between piles may be required to ensure stability.
The diameter of the piles also plays a role in determining the minimum distance....
Permission to fix barricade boards can be obtained from the local government or relevant authorities.
Permission can be obtained from the local municipality or city council.
In some cases, permission may need to be sought from the transportation department or highway authority.
The process of obtaining permission may involve submitting an application, providing details of the location and purpose of the barricade board.
Pe...
The depth of socketing required in a pile depends on various factors such as soil conditions, load requirements, and design standards.
Socketing depth is determined based on the type and strength of the soil.
It is also influenced by the load-bearing capacity required for the structure.
Design standards and codes provide guidelines for determining the socketing depth.
For example, in cohesive soils, socketing depth may be ...
Yes, shutter vibrator is relevant for a circular pier.
Shutter vibrator is used to compact concrete and remove air voids.
Circular piers also require proper compaction of concrete.
Shutter vibrator helps in achieving uniform and dense concrete in circular piers.
It ensures better strength and durability of the pier.
Example: In the construction of a circular bridge pier, a shutter vibrator would be used to ensure proper com
What people are saying about AECOM
I applied via Approached by Company and was interviewed before Dec 2021. There were 3 interview rounds.
n-tier architecture is a software design pattern that divides an application into logical layers.
It separates presentation, application processing, and data management functions.
Each layer can be developed and maintained independently.
Examples include 3-tier and 4-tier architectures.
It improves scalability, maintainability, and flexibility of the application.
I applied via Job Fair and was interviewed before May 2021. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Apr 2020. There were 3 interview rounds.
posted on 11 Jun 2022
I applied via Campus Placement and was interviewed before Jun 2021. There were 3 interview rounds.
Mathematics, English, Reasoning
An antenna is a device that converts electrical signals into electromagnetic waves and vice versa. Satcom is short for satellite communication.
Antennas are used for transmitting and receiving signals in various applications such as radio, television, and wireless communication.
Satcom refers to the use of satellites for communication purposes, including television broadcasting, internet access, and military communicatio...
Clean India
Corruption
posted on 14 Jul 2021
Name mangling is a technique used by compilers to give unique names to functions and variables to avoid naming conflicts.
Name mangling is used in C++ to support function overloading.
It is also used in Python to avoid naming conflicts in modules.
Name mangling can make it difficult to access variables and functions from outside the class in which they are defined.
In C++, name mangling can be seen by using the 'nm' comman
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 10 Sep 2017
I was interviewed before Sep 2016.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Project Engineer
226
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
189
salaries
| ₹0 L/yr - ₹0 L/yr |
L2 Engineer
146
salaries
| ₹0 L/yr - ₹0 L/yr |
Architect
131
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
126
salaries
| ₹0 L/yr - ₹0 L/yr |
Jacobs Engineering Group
Fluor Corporation
Bechtel
Worley