i
AECOM
Filter interviews by
I applied via LinkedIn and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jul 2023. There was 1 interview round.
I have experience working with minor irrigation systems, including design, installation, and maintenance.
Designed irrigation systems for small-scale agricultural projects
Installed drip irrigation systems for gardens and landscaping
Performed routine maintenance on irrigation pumps and pipes
Troubleshooted and repaired irrigation system malfunctions
I applied via Approached by Company and was interviewed before Sep 2023. There were 2 interview rounds.
I have extensive experience in conducting social impact assessments for various projects.
Conducted social impact assessments for infrastructure projects to analyze potential effects on local communities
Utilized stakeholder engagement techniques to gather feedback and input from community members
Analyzed data and prepared reports outlining potential social impacts and proposed mitigation strategies
Worked closely with pr...
I was interviewed before Mar 2023.
Technical test with questions on arch and steuctural engineering.
The electrical layout of a substation includes distribution panels, transformers, switchgear, and cables to power different areas of the airport building.
The Distribution Panel (DP) yard is where power is received from the grid and distributed to different areas.
Transformers step down the voltage for use in the building.
Switchgear controls the flow of electricity and protects against overloads.
Cables run from the subst...
AECOM interview questions for popular designations
I applied via Company Website and was interviewed before Sep 2022. There were 3 interview rounds.
Get interview-ready with Top AECOM Interview Questions
I applied via Referral and was interviewed in Oct 2022. There were 2 interview rounds.
I applied via Job Portal and was interviewed before Aug 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed before May 2022. There were 2 interview rounds.
I have executed multiple projects in the last few years.
Developed a new website for a client using HTML, CSS, and JavaScript.
Created a mobile application for a startup using React Native.
Managed a team of developers to build a custom CRM system for a large corporation.
Implemented a data analytics solution for a healthcare organization using Python and SQL.
Designed and executed a social media marketing campaign for a no
I applied via Approached by Company and was interviewed before Jan 2023. There were 2 interview rounds.
The full scope of work is in accordance with the conditions of the contract.
The boom length of a tower crane varies depending on the model and manufacturer.
Tower crane boom length can range from 30 meters to over 100 meters.
The boom length determines the maximum height and reach of the crane.
Factors such as weight capacity and wind speed also affect the boom length.
Some popular tower crane models and their boom lengths include: Potain MDT 98 (55 meters), Liebherr 630 EC-H 40 (40 meters), and T
Top trending discussions
The duration of AECOM interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 90 interviews
Interview experience
based on 1.6k reviews
Rating in categories
Project Engineer
226
salaries
| ₹6 L/yr - ₹20 L/yr |
Senior Engineer
196
salaries
| ₹7 L/yr - ₹30 L/yr |
L2 Engineer
145
salaries
| ₹3.4 L/yr - ₹10.1 L/yr |
Architect
131
salaries
| ₹4.1 L/yr - ₹14.9 L/yr |
Engineer
126
salaries
| ₹3.5 L/yr - ₹14.5 L/yr |
Jacobs Engineering Group
Fluor Corporation
Bechtel
Worley