Baselines in Primavera are snapshots of the project schedule at a specific point in time, used for comparison and tracking progress.
Baselines capture the original project plan before any changes are made.
They are used as a reference point to compare actual progress against planned progress.
Baselines help in identifying deviations from the original plan and taking corrective actions.
In Primavera, baselines can be create...
To track a project in Primavera P6 on a daily basis, use the following steps.
Update progress for each activity daily
Review critical path activities regularly
Monitor resource allocation and availability
Compare planned vs. actual progress
Generate daily reports for stakeholders
I applied via Walk-in and was interviewed in Jan 2022. There were 2 interview rounds.
Top trending discussions
WBS stands for Work Breakdown Structure, which is a hierarchical decomposition of the total scope of work to be carried out by the project team.
WBS for a highway project would include major components like earthwork, pavement, drainage, signage, lighting, etc.
WBS for a structure project would include components like foundation, superstructure, finishes, MEP (mechanical, electrical, plumbing), etc.
Each major component i...
posted on 5 Feb 2025
I was interviewed before Feb 2024.
S-Curve in Primavera is a graphical representation of project progress over time.
S-Curve shows the planned and actual progress of a project.
It helps in visualizing the project's performance and identifying any deviations from the plan.
The curve is shaped like an 'S' due to the gradual increase in progress at the beginning and end, with a steeper slope in the middle.
The x-axis represents time, and the y-axis represents ...
I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.
Free float is the amount of time an activity can be delayed without delaying the project, while total float is the amount of time an activity can be delayed without delaying the successor activity.
Free float is specific to an activity, while total float is related to the entire project schedule.
Free float is calculated by subtracting the early start of the activity from the early start of the successor activity, while ...
Time limited projects have fixed deadlines while resource limited projects have fixed resources.
Time limited projects require completion by a specific deadline.
Resource limited projects have a fixed amount of resources available.
Balancing time and resources is crucial for project success.
Example: A construction project with a deadline to finish before winter (time limited) vs a project with a fixed budget (resource lim
posted on 9 Feb 2024
I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.
based on 1 interview
Interview experience
based on 13 reviews
Rating in categories
Awantipora
6-11 Yrs
Not Disclosed
Mumbai,
Pune
3-7 Yrs
₹ 3.4-7.55 LPA
Junior Engineer
878
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Assistant Engineer
791
salaries
| ₹3 L/yr - ₹9 L/yr |
Junior Engineer Civil
383
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Senior Engineer
294
salaries
| ₹4.3 L/yr - ₹11 L/yr |
Civil Site Engineer
258
salaries
| ₹1.9 L/yr - ₹7 L/yr |
Larsen & Toubro Limited
TCS
BHEL
Infosys