What You know
What you mentioned in resume
posted on 24 Aug 2021
I applied via Campus Placement and was interviewed before Aug 2020. There were 4 interview rounds.
Grade M25 is a mix of concrete with a compressive strength of 25 megapascals after 28 days.
M25 is a standard mix of concrete used in construction.
It is made up of 1 part cement, 1 part sand, and 2 parts coarse aggregate.
It has a compressive strength of 25 MPa after 28 days of curing.
It is commonly used in the construction of buildings, bridges, and other structures.
M25 is suitable for moderate exposure conditions and c
posted on 15 Mar 2022
I applied via Campus Placement and was interviewed before Mar 2021. There were 2 interview rounds.
Height of instrument is the vertical distance between the instrument and a reference point on the ground.
It is used in surveying to determine the elevation of points on the ground.
It is measured using a leveling instrument such as a level or a theodolite.
The height of instrument is calculated by subtracting the height of the reference point from the height of the instrument.
It is important to maintain a consistent heig...
The size of spacer bar depends on the size of the conductor and the voltage rating of the line.
The size of the spacer bar should be such that it maintains the required distance between the conductors.
The size of the spacer bar should be selected based on the voltage rating of the line.
The size of the spacer bar should be selected based on the size of the conductor.
The size of the spacer bar should be such that it can w...
posted on 22 Jul 2021
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
The question is incomplete and does not make sense.
The question is missing important information.
It is unclear what the question is asking for.
There is no context provided for the question.
Without more information, it is impossible to answer the question.
The M-5 to M-25 ratio is a measure used in civil engineering to determine the strength of concrete mixtures.
The M-5 to M-25 ratio refers to the ratio of cement, sand, and aggregate in a concrete mixture.
The ratio indicates the compressive strength of the concrete after 28 days of curing.
For example, an M-20 concrete mix has a ratio of 1:1.5:3, which means 1 part cement, 1.5 parts sand, and 3 parts aggregate by volume.
T...
posted on 22 Feb 2023
I applied via Recruitment Consulltant and was interviewed before Feb 2022. There were 3 interview rounds.
Populations forcasting in detail
Tipcall question mostly available to in ner
posted on 27 Apr 2023
I applied via Walk-in and was interviewed in Mar 2023. There were 2 interview rounds.
Civil engineering is a branch of engineering that deals with the design, construction, and maintenance of the built environment.
Civil engineers design and oversee the construction of buildings, roads, bridges, and other infrastructure.
They use their knowledge of physics, mathematics, and materials science to ensure that structures are safe, efficient, and sustainable.
Civil engineers also play a key role in managing nat...
Highway engineering is a branch of civil engineering that deals with the design, construction, and maintenance of highways and roads.
It involves planning and designing highways and roads to ensure safe and efficient transportation.
Highway engineers consider factors such as traffic volume, speed, and safety when designing roads.
They also oversee the construction and maintenance of highways and roads to ensure they meet ...
posted on 6 Nov 2019
I applied via Naukri.com and was interviewed in Aug 2020. There were 3 interview rounds.
based on 5 reviews
Rating in categories
Assistant Engineer
174
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
109
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
79
salaries
| ₹0 L/yr - ₹0 L/yr |
Accountant
50
salaries
| ₹0 L/yr - ₹0 L/yr |
Accounts Officer
49
salaries
| ₹0 L/yr - ₹0 L/yr |
Ashoka Buildcon
IRB Infrastructure
Nagarjuna Construction Company
Simplex Infrastructures