S-Curve in Primavera is a graphical representation of project progress over time.
S-Curve shows the planned and actual progress of a project.
It helps in visualizing the project's performance and identifying any deviations from the plan.
The curve is shaped like an 'S' due to the gradual increase in progress at the beginning and end, with a steeper slope in the middle.
The x-axis represents time, and the y-axis represents ...
Rate your
company
🤫 100% anonymous
How was your last interview experience?
I applied via campus placement at National Institute of Construction Management and Research, Pune and was interviewed before Aug 2023. There were 2 interview rounds.
Prepare Aptitude Book, It is good.
Experienced Planning Engineer with a background in civil engineering and a strong track record of successfully managing projects.
Bachelor's degree in Civil Engineering
5+ years of experience in planning and managing construction projects
Proficient in project management software such as Primavera P6
Strong analytical and problem-solving skills
Excellent communication and teamwork abilities
Managed the planning and schedulin...
Critical path is the longest sequence of tasks in a project that must be completed on time to ensure the project finishes on schedule.
Critical path determines the shortest possible duration for a project.
It helps in identifying the tasks that are critical and cannot be delayed without delaying the entire project.
Activities on the critical path have zero float or slack.
Any delay in the critical path activities will dela...
I applied via Naukri.com and was interviewed before Jul 2022. There were 3 interview rounds.
General apparition questions. It also had technical mcq
IS standards refer to Indian Standards which are set by the Bureau of Indian Standards (BIS) for various products and services.
IS standards cover a wide range of industries including construction, electrical, mechanical, and chemical.
Compliance with IS standards is often mandatory for certain products to ensure safety, quality, and performance.
Examples of IS standards include IS 456 for concrete, IS 800 for steel struc...
L&T Construction interview questions for designations
I applied via Walk-in and was interviewed in Dec 2021. There were 2 interview rounds.
Concrete technology
Environmental engineering
Top trending discussions
posted on 20 Jan 2025
WBS stands for Work Breakdown Structure, which is a hierarchical decomposition of the total scope of work to be carried out by the project team.
WBS for a highway project would include major components like earthwork, pavement, drainage, signage, lighting, etc.
WBS for a structure project would include components like foundation, superstructure, finishes, MEP (mechanical, electrical, plumbing), etc.
Each major component i...
posted on 5 Feb 2025
I was interviewed before Feb 2024.
posted on 19 Jun 2023
I was interviewed in Jan 2023.
based on 4 interviews
Interview experience
Anonymously discuss salaries, work culture, and many more
Get Ambitionbox App
based on 43 reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹6 L/yr - ₹18.2 L/yr |
Senior Engineer
711
salaries
| ₹3 L/yr - ₹12 L/yr |
Assistant Construction Manager
498
salaries
| ₹5.4 L/yr - ₹17.5 L/yr |
Construction Management
332
salaries
| ₹8.2 L/yr - ₹35 L/yr |
Assistant Engineering Manager
321
salaries
| ₹6 L/yr - ₹17 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA