Interview Questionnaire 

16 Questions

  • Q1. Working of UPS and their safety ?
  • Ans. 

    UPS ensures uninterrupted power supply during power outages and protects equipment from power surges.

    • UPS stands for Uninterruptible Power Supply

    • It provides backup power during power outages

    • UPS also protects equipment from power surges and voltage fluctuations

    • UPS can be of different types such as standby, line-interactive, and online

    • UPS batteries need to be replaced periodically for optimal performance

  • Answered by AI
  • Q2. Working of HVAC systems and their safety ?
  • Ans. 

    HVAC systems are responsible for heating, ventilation, and air conditioning in buildings, ensuring comfort and safety.

    • HVAC systems regulate temperature, humidity, and air quality in indoor spaces.

    • They consist of various components such as furnaces, air conditioners, heat pumps, fans, and ductwork.

    • Safety measures include regular maintenance, proper installation, and adherence to building codes.

    • HVAC systems should be des...

  • Answered by AI
  • Q3. Working of fire alarm & fire fighting systems ?
  • Ans. 

    Fire alarm and fire fighting systems are designed to detect and extinguish fires in buildings.

    • Fire alarm systems use sensors to detect smoke or heat and trigger an alarm to alert occupants of the building.

    • Fire fighting systems include sprinklers, fire extinguishers, and fire hoses.

    • Sprinkler systems are designed to automatically release water when a fire is detected.

    • Fire extinguishers are portable devices that can be us...

  • Answered by AI
  • Q4. Power Distribution SLD of Electrical systems ?
  • Ans. 

    Power Distribution SLD is a schematic diagram that shows the distribution of power in an electrical system.

    • SLD stands for Single Line Diagram

    • It shows the flow of power from the source to the loads

    • It includes information about transformers, switchgear, and protective devices

    • It is used for design, construction, and maintenance of electrical systems

  • Answered by AI
  • Q5. Working principle of transformer and their safety ?
  • Ans. 

    Transformers work on the principle of electromagnetic induction and require proper grounding and insulation for safety.

    • Transformers convert electrical energy from one circuit to another through electromagnetic induction

    • They consist of two coils, primary and secondary, wound around a magnetic core

    • The primary coil is connected to the input voltage source and the secondary coil to the load

    • Safety measures include proper gr...

  • Answered by AI
  • Q6. SLD of UPS system ?
  • Ans. 

    SLD of UPS system refers to the Single Line Diagram of the system.

    • SLD is a graphical representation of the electrical system that shows all the components and their interconnections.

    • It is used to design, install, and maintain the UPS system.

    • SLD includes information about the power sources, distribution panels, transformers, UPS units, and loads.

    • It helps in identifying the fault location and isolating the faulty compone...

  • Answered by AI
  • Q7. Working of DG sets & their safety ?
  • Ans. 

    DG sets are backup power sources used in case of power outages. Safety measures include regular maintenance and proper ventilation.

    • DG sets are diesel-powered generators that provide backup power in case of power outages.

    • They are commonly used in hospitals, data centers, and other critical facilities.

    • Safety measures include regular maintenance to ensure proper functioning and prevent accidents.

    • Proper ventilation is also...

  • Answered by AI
  • Q8. Working of water treatment systems & their distribution ?
  • Ans. 

    Water treatment systems purify water for safe consumption. Distribution involves transporting treated water to consumers.

    • Water treatment systems remove impurities and contaminants from water.

    • Common methods include filtration, sedimentation, and disinfection.

    • Treated water is then distributed through a network of pipes and pumps.

    • Distribution systems must be regularly maintained to ensure water quality.

    • Chlorine is often a...

  • Answered by AI
  • Q9. Engineering (MEP)point of view which equipments we should have to taking care regularly to maintain the systems at data center of IT premises ?
  • Q10. What are procedure of procurement of materials and approvals of concern authority in Engineering point of view ?
  • Ans. 

    Procurement of materials and approvals in engineering involve several procedures and authorities.

    • Identify the required materials and their specifications

    • Prepare a list of potential suppliers and obtain quotes

    • Evaluate the quotes and select the supplier

    • Obtain necessary approvals from concerned authorities

    • Place the purchase order and track the delivery

    • Inspect the materials upon receipt to ensure compliance with specificat

  • Answered by AI
  • Q11. How we will implement cost saving intiatives ?
  • Ans. 

    Cost saving initiatives can be implemented through various measures.

    • Conducting a cost analysis to identify areas of potential savings

    • Reducing unnecessary expenses such as travel and entertainment

    • Negotiating better deals with suppliers

    • Implementing energy-efficient practices

    • Encouraging remote work to reduce office space costs

    • Investing in automation to reduce labor costs

    • Consolidating operations to reduce overhead costs

  • Answered by AI
  • Q12. Annual maintenance contract management & Vendor management procedures ?
  • Ans. 

    Annual maintenance contract & vendor management are crucial for efficient operations.

    • Annual maintenance contracts should be reviewed and renewed on time.

    • Vendor management procedures should include regular communication and performance evaluation.

    • Contracts should clearly define the scope of work, timelines, and payment terms.

    • Vendor selection should be based on factors such as quality, reliability, and cost-effectiveness...

  • Answered by AI
  • Q13. What is Capex and opex ?
  • Ans. 

    Capex refers to capital expenditures, while opex refers to operational expenses.

    • Capex is the money spent on acquiring or upgrading physical assets like property, equipment, or infrastructure.

    • Opex is the money spent on day-to-day operations like salaries, utilities, and maintenance.

    • Capex is usually a one-time expense, while opex is ongoing.

    • Capex is often used to increase the company's long-term value, while opex is nece...

  • Answered by AI
  • Q14. What is Escalation matrix ?
  • Ans. 

    Escalation matrix is a hierarchical process of escalating issues to higher authorities for resolution.

    • It is a structured process for resolving issues that cannot be resolved at lower levels.

    • It defines the hierarchy of authorities to be contacted in case of an issue.

    • It helps in timely resolution of issues by ensuring that they are escalated to the right authority.

    • It is commonly used in customer support, IT support, and ...

  • Answered by AI
  • Q15. Elevator and their safety ?
  • Ans. 

    Elevators are essential for modern buildings, and their safety is crucial for passengers' well-being.

    • Elevators must undergo regular maintenance and inspections to ensure their safety.

    • Safety features such as emergency brakes, door sensors, and alarms must be installed and functioning properly.

    • Elevator operators must be trained and certified to operate the elevator safely.

    • Building codes and regulations must be followed t...

  • Answered by AI
  • Q16. What is statutory approvals ?
  • Ans. 

    Statutory approvals are legal permissions required for a project or activity to comply with laws and regulations.

    • Statutory approvals are mandatory legal permissions required for any project or activity.

    • These approvals ensure that the project or activity complies with all the laws and regulations of the concerned authorities.

    • Examples of statutory approvals include building permits, environmental clearances, and licenses...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It was a walk-in round which I have been attended at Knight Frank head office. I have cleared HR & technical round. Mostly questions have been asked by interviwer were related to technical theory of electrical engineering . Interviwer also check the candidature technical skills as well as communication skills. I have cleared and qualified all of above questions which I have mention in ambition box and after that I got my offer letter from Knight Frank India Pvt ltd.

Top Knight Frank Senior Technical Executive Interview Questions and Answers

Q1. What are procedure of procurement of materials and approvals of concern authority in Engineering point of view ?
View answer (1)

Senior Technical Executive Interview Questions asked at other Companies

Q1. What are procedure of procurement of materials and approvals of concern authority in Engineering point of view ?
View answer (1)

HR Executive Interview Questions & Answers

user image Anonymous

posted on 20 Aug 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Sadsdsafdsafdsfdsfdsfdsfdsff
Round 2 - One-on-one 

(1 Question)

  • Q1. Sdsddsfdsfdsfdsfdsffdsfdsf

HR Executive Interview Questions asked at other Companies

Q1. What do you know about Labor Law
View answer (6)
Knight Frank Interview Questions and Answers for Freshers
illustration image
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jan 2024. There were 5 interview rounds.

Round 1 - Aptitude Test 

Online based test on basic aptitude and problem solving tests.

Round 2 - Technical 

(1 Question)

  • Q1. Civil engineering design questions.
Round 3 - Technical 

(1 Question)

  • Q1. Civil execution, interior fit-out, planning and coordination.
Round 4 - One-on-one 

(1 Question)

  • Q1. Problem solving capacity, prioritisation, project scheduling, cost optimisation, logistics and delivery.
Round 5 - HR 

(1 Question)

  • Q1. Salary negotiation and finalization of offer.

Interview Preparation Tips

Topics to prepare for Knight Frank Project Manager interview:
  • Civil Project Management
  • Civil Engineering
  • Structural Engineering
  • Material Handling
  • Team Management
  • Logistics Management

Project Manager Interview Questions asked at other Companies

Q1. What is success & what is failure to you? How do you handle failure? - not much interviewer asks such questions, but I believe these are very important questions, if you want to succeed.
View answer (1)

Interview Questions & Answers

user image Anonymous

posted on 11 Sep 2024

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I was interviewed in Mar 2024.

Round 1 - Case Study 

Tell something about yourself.

Round 2 - Technical 

(5 Questions)

  • Q1. What is HVAC .
  • Ans. 

    HVAC stands for Heating, Ventilation, and Air Conditioning. It refers to the technology of indoor environmental comfort.

    • HVAC systems control temperature, humidity, and air quality in buildings.

    • Heating can be provided through furnaces, boilers, or heat pumps.

    • Ventilation involves exchanging indoor and outdoor air to improve air quality.

    • Air conditioning systems use refrigeration to cool indoor air.

    • HVAC systems are essenti...

  • Answered by AI
  • Q2. Explained about Fire fighting system.
  • Q3. What is plumbing system
  • Ans. 

    Plumbing system refers to the network of pipes, fixtures, and fittings that deliver water and remove waste in a building.

    • Plumbing systems include pipes for water supply, drainage, and venting

    • Fixtures such as sinks, toilets, showers, and bathtubs are connected to the plumbing system

    • Plumbing systems also include valves, pumps, water heaters, and other equipment

    • Proper installation and maintenance of plumbing systems are e

  • Answered by AI
  • Q4. Explai About FM 200
  • Ans. 

    FM 200 is a clean agent fire suppression system commonly used in data centers and other critical facilities.

    • FM 200 is a colorless, odorless gas that is stored in cylinders and discharged into the protected space in the event of a fire.

    • It works by reducing the oxygen levels in the air to a point where combustion is no longer sustainable.

    • FM 200 is non-toxic and leaves no residue, making it ideal for use in areas with sen...

  • Answered by AI
  • Q5. Working of LT panel room and work sequence.
  • Ans. 

    LT panel room is a crucial part of electrical systems, housing electrical components for power distribution.

    • LT panel room is where the electrical distribution board is located for controlling and distributing power to various circuits.

    • Work sequence involves checking the incoming power supply, monitoring the load requirements, and ensuring proper distribution of power.

    • Regular maintenance and inspection of LT panel room ...

  • Answered by AI

Knight Frank interview questions for popular designations

 Assistant Project Manager

 (5)

 Project Manager

 (3)

 Electrical Engineer

 (2)

 Project Engineer

 (2)

 HR Executive

 (1)

 Maintenance Engineer

 (1)

 Site Engineer

 (1)

 Assistant Manager - EHS

 (1)

Interview experience
4
Good
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 4 interview rounds.

Round 1 - Aptitude Test 

Roles and Responsibility

Round 2 - Technical 

(3 Questions)

  • Q1. Statutory documents to be maintained as per karnataka
  • Q2. Iso 14001 & Iso 45001
  • Q3. BSC Documents to be mainatined
Round 3 - One-on-one 

(4 Questions)

  • Q1. Importance of Safety in site
  • Ans. 

    Safety in the workplace is crucial to prevent accidents, injuries, and illnesses among employees.

    • Ensures the well-being of employees and reduces the risk of workplace accidents

    • Boosts employee morale and productivity by creating a safe work environment

    • Compliance with safety regulations and standards to avoid legal issues

    • Reduces absenteeism and healthcare costs associated with workplace injuries

    • Enhances company reputatio

  • Answered by AI
  • Q2. HIRA AND AIS Preparation
  • Q3. Standard PPEs and codes
  • Q4. NBC 2016 Standards
Round 4 - HR 

(1 Question)

  • Q1. Present salary and expectations

Assistant Manager - EHS Interview Questions asked at other Companies

Q1. Why VDU has larger diameter and shorter height as compared to ADU ?
View answer (2)

Get interview-ready with Top Knight Frank Interview Questions

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. High rise building safeties.
  • Q2. 5s audit certification
  • Q3. Compliances of State government.
  • Ans. 

    Compliances of State government refer to the regulations and guidelines set by the state government that must be followed by building managers.

    • Building managers need to ensure compliance with state building codes and regulations.

    • They must adhere to safety standards and obtain necessary permits and licenses.

    • Building managers may need to comply with environmental regulations and energy efficiency requirements.

    • They should...

  • Answered by AI
  • Q4. Compliances of building
  • Ans. 

    Compliances of building refer to the regulations and standards that must be followed to ensure safety, accessibility, and environmental sustainability.

    • Building codes and regulations set by local authorities

    • Fire safety measures and emergency evacuation plans

    • Accessibility requirements for people with disabilities

    • Environmental regulations for energy efficiency and sustainability

    • Health and safety regulations for building o...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This is advice for all job seekers: know everything about building codes, compliance, and safety audits.

Building Manager Interview Questions asked at other Companies

Q1. Compliances of State government.
View answer (1)

Jobs at Knight Frank

View all
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Job Fair and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. About ur self, expirence,ctc
Round 2 - HR 

(1 Question)

  • Q1. Same question ask as before

Guest Relation Executive Interview Questions asked at other Companies

Q1. Fill up a walk in pt s data..Manage a medical payment posting and all pt review and feedback. Coordinate to pt and her relatives. Seattle her payment and solved them problems, manage her admission &discharge.
Add answer
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(3 Questions)

  • Q1. Name and company details
  • Q2. When can you join
  • Q3. Dates of join as per ur notice period like 2 months or whichever is earlier
  • Ans. 

    I can join within 2 months notice period or earlier.

    • I can join within 2 months notice period as per company policy.

    • I am also open to joining earlier if required by the company.

    • I will ensure a smooth transition during the notice period.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Salary negotiation mat karna baad m nhi badhti

Assistant MEP Projects Manager Interview Questions asked at other Companies

Q1. Dates of join as per ur notice period like 2 months or whichever is earlier
View answer (1)
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is hvac system?
  • Ans. 

    HVAC system stands for Heating, Ventilation, and Air Conditioning system, which is used to control the temperature, humidity, and air quality in a building.

    • HVAC system controls temperature, humidity, and air quality in a building

    • It includes components like furnaces, air conditioners, heat pumps, and ductwork

    • Regular maintenance is important to ensure efficient operation

    • HVAC systems can be centralized or decentralized

    • Exa...

  • Answered by AI
  • Q2. Heating ventilation air conditioning system

Maintenance Engineer Interview Questions asked at other Companies

Q1. 1)which refrigeration cycle used in chilling plant?
View answer (9)

Interview Questions & Answers

user image Anonymous

posted on 18 May 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Apr 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(5 Questions)

  • Q1. Subject Matter required
  • Q2. Deponds upon profile you should be in sound
  • Q3. Communication skils
  • Q4. Team Handling Important
  • Q5. Vendor Management

Interview Preparation Tips

Interview preparation tips for other job seekers - Every failure will teach the good lesson, keep running.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - HR 

(1 Question)

  • Q1. Basic about your entire career
Round 3 - One-on-one 

(1 Question)

  • Q1. Profile wat you have been doing in past.
  • Ans. 

    I have been working as a Front Office Executive for the past 5 years in a busy corporate office.

    • Managed front desk operations including greeting visitors, answering phones, and handling inquiries.

    • Scheduled appointments and meetings for executives.

    • Maintained office supplies and inventory.

    • Assisted with administrative tasks such as data entry and filing.

    • Provided excellent customer service to clients and guests.

    • Handled inc...

  • Answered by AI

Front Office Executive Interview Questions asked at other Companies

Q1. What you do when customer is so hurry and you near environment is already rush so what you do you at the time please share the answer
View answer (1)
Contribute & help others!
anonymous
You can choose to be anonymous

Knight Frank Interview FAQs

How many rounds are there in Knight Frank interview?
Knight Frank interview process usually has 2-3 rounds. The most common rounds in the Knight Frank interview process are HR, Technical and Resume Shortlist.
How to prepare for Knight Frank interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Knight Frank. The most common topics and skills that interviewers at Knight Frank expect are Facility Management, Soft Services, Project Management, Vendor Management and Property Management.
What are the top questions asked in Knight Frank interview?

Some of the top questions asked at the Knight Frank interview -

  1. What are procedure of procurement of materials and approvals of concern author...read more
  2. Working of HVAC systems and their safet...read more
  3. How we will implement cost saving intiative...read more
How long is the Knight Frank interview process?

The duration of Knight Frank interview process can vary, but typically it takes about less than 2 weeks to complete.

Recently Viewed

PHOTOS

InsuranceDekho

3 office photos

LIST OF COMPANIES

Credit Bajaar

Overview

INTERVIEWS

Lodha Group

No Interviews

INTERVIEWS

Knight Frank

No Interviews

INTERVIEWS

NoBroker

No Interviews

REVIEWS

Jana Small Finance Bank

No Reviews

INTERVIEWS

Knight Frank

No Interviews

INTERVIEWS

ircon Infrastructure & Services

No Interviews

JOBS

Bihar Urban Infrastructure Development Corporatio

No Jobs

PHOTOS

Bihar Urban Infrastructure Development Corporatio

No Photos

Tell us how to improve this page.

Knight Frank Interview Process

based on 61 interviews

Interview experience

4.2
  
Good
View more

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 â€˘ 353 Interviews
CBRE Interview Questions
4.2
 â€˘ 264 Interviews
Square Yards Interview Questions
3.8
 â€˘ 198 Interviews
Cushman & Wakefield Interview Questions
4.2
 â€˘ 77 Interviews
Colliers India Interview Questions
3.9
 â€˘ 64 Interviews
MagicBricks Interview Questions
3.6
 â€˘ 58 Interviews
PropTiger.com Interview Questions
4.0
 â€˘ 23 Interviews
Savills Interview Questions
4.0
 â€˘ 12 Interviews
Quikr Realty Interview Questions
3.9
 â€˘ 1 Interview
View all

Fast track your campus placements

View all

Knight Frank Reviews and Ratings

based on 706 reviews

4.0/5

Rating in categories

3.7

Skill development

3.9

Work-life balance

3.8

Salary

3.7

Job security

3.9

Company culture

3.4

Promotions

3.8

Work satisfaction

Explore 706 Reviews and Ratings
Need Technical Executive

Mumbai Suburban,

Navi Mumbai

+1

3-5 Yrs

â‚ą 3-4.5 LPA

Facility Executive-Soft/Tech

Chennai

2-6 Yrs

â‚ą 3-3.5 LPA

Helpdesk Executive

Chennai

1-4 Yrs

â‚ą 3-3.5 LPA

Explore more jobs
Project Engineer
145 salaries
unlock blur

â‚ą0 L/yr - â‚ą0 L/yr

Assistant Project Manager
129 salaries
unlock blur

â‚ą0 L/yr - â‚ą0 L/yr

Assistant Manager
101 salaries
unlock blur

â‚ą0 L/yr - â‚ą0 L/yr

Project Manager
99 salaries
unlock blur

â‚ą0 L/yr - â‚ą0 L/yr

Assistant Facility Manager
97 salaries
unlock blur

â‚ą0 L/yr - â‚ą0 L/yr

Explore more salaries
Compare Knight Frank with

CBRE

4.2
Compare

JLL

4.1
Compare

Colliers India

3.9
Compare

Cushman & Wakefield

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview