  • Q1. Questions are related to the operation of the substation equipment like VCB transformer panels etc
Round 2 - Technical 

(1 Question)

  • Q1. 220 kv switchyard, switchgear equipments

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep knowing what you are doing as daily basis Operation and maintenance

I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Mostly questions was switchyard and substations maintenance,

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn about your work in deeply and read basics about your field

Electrical Engineer Interview Questions Asked at Other Companies

Q1. What is the difference between Switch gear & Circuit Breakers ... read more
Q2. What is ATS, transformer maintenance procedure, protection of tra ... read more
asked in Tata Steel
Q3. 1.what is composite error and ratio error in current transformer?
Q4. 1. Power factor of transformer 2. types of DC machine 3. Working ... read more
Q5. How many types of transformer according to voltage transfer

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed before Jun 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - They also give you a chance to find out if the job and company are right for you. Follow the tips here to ace your interviews.
. Strengths
. Willingness to work and flexibility
. Leadership skills
. Ability and willingness to learn new things
. Contributions to the organizations in which . you have worked or volunteered
. Creativity in solving problems and working with people
Interview experience
4
Good
Difficulty level
Hard
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Department related MEP
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Nov 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. What is Transformer
  • Ans. 

    A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.

    • Transformers are used to increase or decrease the voltage in an electrical circuit.

    • They consist of two or more coils of wire, known as windings, that are wound around a core made of magnetic material.

    • The primary winding receives electrical energy from a power source, while the secondary ...

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. How many types of transfermer
  • Ans. 

    There are several types of transformers used in electrical engineering.

    • Step-up transformer

    • Step-down transformer

    • Isolation transformer

    • Auto transformer

    • Instrument transformer

    • Distribution transformer

    • Power transformer

    • Current transformer

    • Potential transformer

  • Answered by AI
  • Q2. 2 type dary tape oil type

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. LT Side Equipments
Round 3 - HR 

(1 Question)

  • Q1. Introduction & Salary
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .

I applied via Company Website and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About working at previous work done and electrical engineering

Interview Preparation Tips

Interview preparation tips for other job seekers - NA

I applied via Walk-in and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. System related
  • Q2. Building compliance etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Residential site system and compliance related services

I applied via Company Website and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. How to work transformer.
  • Ans. 

    Transformers work by converting electrical energy from one circuit to another through electromagnetic induction.

    • Transformers have two coils of wire, a primary coil and a secondary coil.

    • The primary coil is connected to a power source and produces a magnetic field when current flows through it.

    • The magnetic field induces a voltage in the secondary coil, which is connected to the load.

    • The voltage in the secondary coil is p...

  • Answered by AI
  • Q2. How many causes do not start the alternator.
  • Ans. 

    There can be multiple causes for an alternator to not start.

    • Dead battery

    • Faulty alternator

    • Broken or loose belts

    • Faulty voltage regulator

    • Bad wiring or connections

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I really enjoying my interview time. I am not nervous in this time.

Skills evaluated in this interview

Contribute & help others!
anonymous
You can choose to be anonymous

Knight Frank Interview FAQs

How many rounds are there in Knight Frank Electrical Engineer interview?
Knight Frank interview process usually has 1-2 rounds. The most common rounds in the Knight Frank interview process are Technical.
How to prepare for Knight Frank Electrical Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Knight Frank. The most common topics and skills that interviewers at Knight Frank expect are Building Management System, Civil Engineering, Construction Management, Cost Control and Crisis Management.
What are the top questions asked in Knight Frank Electrical Engineer interview?

Some of the top questions asked at the Knight Frank Electrical Engineer interview -

  1. Questions are related to the operation of the substation equipment like VCB tra...read more
  2. Mostly questions was switchyard and substations maintenan...read more
  3. 220 kv switchyard, switchgear equipme...read more

Recently Viewed

PHOTOS

InsuranceDekho

3 office photos

LIST OF COMPANIES

Credit Bajaar

Overview

INTERVIEWS

Casagrand

No Interviews

INTERVIEWS

Knight Frank

No Interviews

INTERVIEWS

Casagrand

No Interviews

INTERVIEWS

Casagrand

No Interviews

INTERVIEWS

Knight Frank

No Interviews

JOBS

Bajaj Finserv Health

No Jobs

JOBS

Airtel Payments Bank

No Jobs

INTERVIEWS

Casagrand

No Interviews

Tell us how to improve this page.

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 353 Interviews
CBRE Interview Questions
4.2
 • 264 Interviews
Square Yards Interview Questions
3.8
 • 198 Interviews
Colliers India Interview Questions
3.9
 • 63 Interviews
MagicBricks Interview Questions
3.4
 • 57 Interviews
M3M India Interview Questions
4.0
 • 47 Interviews
Smartworks Interview Questions
3.5
 • 31 Interviews
Aliens Group Interview Questions
3.2
 • 30 Interviews
View all

Fast track your campus placements

View all
Knight Frank Electrical Engineer Salary
based on 23 salaries
₹3 L/yr - ₹7.2 L/yr
12% more than the average Electrical Engineer Salary in India
View more details

Knight Frank Electrical Engineer Reviews and Ratings

based on 3 reviews

4.1/5

Rating in categories

1.0

Skill development

1.0

Work-life balance

1.0

Salary

2.4

Job security

1.0

Company culture

2.4

Promotions

1.0

Work satisfaction

Explore 3 Reviews and Ratings
Project Engineer
145 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Project Manager
129 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
101 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Manager
99 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Facility Manager
97 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Knight Frank with

CBRE

4.2
Compare

JLL

4.1
Compare

Colliers India

3.9
Compare

Cushman & Wakefield

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview