Upload Button Icon Add office photos

Knight Frank

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Knight Frank Site Engineer Interview Questions and Answers

Updated 25 Apr 2023

Knight Frank Site Engineer Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 25 Apr 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(2 Questions)

  • Q1. Working experience
  • Q2. Present location of work
  • Ans. 

    I am currently working at a construction site in downtown city.

    • Construction site in downtown city

    • Working on a high-rise building project

    • Coordinating with architects, contractors, and workers

    • Ensuring adherence to safety regulations and project timelines

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Worth technical round interview

Interview questions from similar companies

Round 1 - Aptitude Test 

Aptitude test like mathematics question ,reasoning & our department like mechanical engineer

Round 2 - Technical 

(2 Questions)

  • Q1. Tell me about ur self What should we hire you
  • Q2. Job timing location & salary fix
Round 3 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Joining letter ,job timing
  • Q3. Salary f
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. LT Side Equipments
Round 3 - HR 

(1 Question)

  • Q1. Introduction & Salary
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .

Interview Questionnaire 

1 Question

  • Q1. Quality related questions

I applied via Referral and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Single Line Diagram of STP, it's operation and it's working
  • Ans. 

    STP is a wastewater treatment plant that uses physical, chemical, and biological processes to remove pollutants from sewage.

    • STP receives sewage from households and industries through a network of underground pipes.

    • The sewage is screened to remove large objects and then sent to a grit chamber to remove sand and grit.

    • The sewage is then sent to a primary clarifier where solids settle to the bottom and are removed as sludg...

  • Answered by AI
  • Q2. Transformer working and it's safety
  • Ans. 

    Transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.

    • Transformers work on the principle of electromagnetic induction.

    • They consist of two or more coils of wire called windings.

    • The primary winding is connected to the input voltage source, while the secondary winding is connected to the load.

    • When an alternating current flows through the primary...

  • Answered by AI
  • Q3. DG sets safety and it's operation
  • Ans. 

    DG sets safety and operation are crucial for uninterrupted power supply.

    • DG sets should be installed in a well-ventilated area to avoid carbon monoxide poisoning.

    • Regular maintenance and testing of DG sets are necessary to ensure their safe operation.

    • Proper grounding and earthing of DG sets are essential to prevent electrical hazards.

    • Emergency stop buttons and alarms should be installed to shut down the DG sets in case o...

  • Answered by AI
  • Q4. Soft skills, making PPT, DMR, MMR
  • Q5. Load Management & balancing

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm, listen carefully and give point to point answers
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Fair

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is rcc work?
  • Ans. 

    RCC work refers to reinforced concrete construction, which involves using steel bars to strengthen concrete structures.

    • RCC work involves the use of steel reinforcement bars within concrete to increase its strength and durability.

    • It is commonly used in the construction of buildings, bridges, dams, and other structures.

    • The steel bars are placed in specific locations within the concrete formwork before pouring the concret...

  • Answered by AI
  • Q2. Civil contractor

Interview Preparation Tips

Interview preparation tips for other job seekers - To make
Your company raise and profitable

I applied via Approached by Company

Interview Questionnaire 

2 Questions

  • Q1. About slary and a discussion about company
  • Q2. Generalfunctional testing question one java coding question

I applied via Referral and was interviewed before Jan 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Intrudes your self.
  • Q2. Tell me about your skill

Interview Preparation Tips

Interview preparation tips for other job seekers - Overall good, all about intrudes myself. Describe my work experience. Telling all my technical skills.

I applied via AmbitionBox and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(1 Question)

  • Q1. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - I have 2 year experience in construction
Contribute & help others!
anonymous
You can choose to be anonymous

Knight Frank Interview FAQs

How many rounds are there in Knight Frank Site Engineer interview?
Knight Frank interview process usually has 2 rounds. The most common rounds in the Knight Frank interview process are Resume Shortlist and HR.

Recently Viewed

REVIEWS

Happiest Minds Technologies

No Reviews

INTERVIEWS

Lodha Group

No Interviews

INTERVIEWS

Lodha Group

No Interviews

REVIEWS

Happiest Minds Technologies

No Reviews

REVIEWS

Happiest Minds Technologies

No Reviews

REVIEWS

Jindal Steel and Power

No Reviews

REVIEWS

Jindal Saw

No Reviews

SALARIES

Happiest Minds Technologies

SALARIES

K Raheja Corp

JOBS

K Raheja Corp

No Jobs

Tell us how to improve this page.

Knight Frank Site Engineer Interview Process

based on 2 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 355 Interviews
CBRE Interview Questions
4.2
 • 264 Interviews
Square Yards Interview Questions
3.8
 • 198 Interviews
Colliers India Interview Questions
3.9
 • 65 Interviews
MagicBricks Interview Questions
3.7
 • 59 Interviews
M3M India Interview Questions
4.0
 • 48 Interviews
Smartworks Interview Questions
3.5
 • 31 Interviews
Aliens Group Interview Questions
3.2
 • 30 Interviews
View all

Fast track your campus placements

View all
Knight Frank Site Engineer Salary
based on 4 salaries
₹2.2 L/yr - ₹5 L/yr
At par with the average Site Engineer Salary in India
View more details

Knight Frank Site Engineer Reviews and Ratings

based on 2 reviews

4.2/5

Rating in categories

3.3

Skill development

4.2

Work-life balance

4.2

Salary

3.3

Job security

4.2

Company culture

3.3

Promotions

4.2

Work satisfaction

Explore 2 Reviews and Ratings
Project Engineer
133 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Project Manager
129 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Facility Manager
97 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Manager
94 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Project Engineer
85 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Knight Frank with

CBRE

4.2
Compare

JLL

4.1
Compare

Colliers India

3.9
Compare

Cushman & Wakefield

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview