Upload Button Icon Add office photos

Knight Frank

Compare button icon Compare button icon Compare

Filter interviews by

Knight Frank Assistant Manager - QA & QC Interview Questions and Answers

Updated 3 Apr 2021

Knight Frank Assistant Manager - QA & QC Interview Experiences

1 interview found

I applied via LinkedIn and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Relevant to the Existing projects and relevant to the required projects experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Face the interview with confidence

Interview questions from similar companies

I appeared for an interview before Jan 2021.

Interview Questionnaire 

1 Question

  • Q1. Related to PM

Interview Preparation Tips

Interview preparation tips for other job seekers - be positive, bold to answer

Project Manager Interview Questions & Answers

Nyati Group user image Saurabh Kumar Singh

posted on 3 Jul 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Self introduction
Round 2 - One-on-one 

(1 Question)

  • Q1. Self introduction
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Diffirence between project and project engineering
  • Ans. 

    Project refers to a specific task with a defined start and end, while project engineering involves the technical aspects of planning, designing, and executing the project.

    • Project is the overall task or objective to be completed within a specific timeframe.

    • Project engineering focuses on the technical aspects such as planning, designing, and executing the project.

    • Project management involves coordinating resources and tas...

  • Answered by AI
  • Q2. Types of services in interior fitout
  • Ans. 

    Types of services in interior fitout include design, construction, project management, and installation.

    • Design services involve creating layouts, selecting materials, and creating 3D visualizations.

    • Construction services include building partitions, ceilings, and flooring.

    • Project management services involve coordinating schedules, budgets, and contractors.

    • Installation services include fitting furniture, fixtures, and eq...

  • Answered by AI
Round 3 - One-on-one 

(2 Questions)

  • Q1. Problems faced in site
  • Ans. 

    Some common problems faced on site include delays in material delivery, inclement weather, and coordination issues.

    • Delays in material delivery can impact project timelines and budgets

    • Inclement weather can halt work progress and cause safety concerns

    • Coordination issues between different teams can lead to misunderstandings and errors

  • Answered by AI
  • Q2. Difference between agreement and bond
  • Ans. 

    Agreement is a mutual understanding between parties, while a bond is a legal document that ensures fulfillment of obligations.

    • Agreement is a mutual understanding between two or more parties.

    • A bond is a legal document that guarantees the fulfillment of obligations.

    • Agreements are usually informal and may not always be legally binding.

    • Bonds are formal and legally enforceable documents.

    • Examples of agreements include contra...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Low tension cable rating 440v
  • Ans. 

    Low tension cables rated for 440V are commonly used for power distribution in residential and commercial buildings.

    • Low tension cables are typically rated for voltages up to 1000V.

    • These cables are commonly used for power distribution in buildings.

    • Examples of low tension cables include PVC insulated cables and XLPE insulated cables.

  • Answered by AI
  • Q2. 11kv cable strenght and voltage
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(3 Questions)

  • Q1. Tell me about your self
  • Q2. Project experience
  • Q3. Project management

Interview Preparation Tips

Interview preparation tips for other job seekers - They have ask simple question 1)tell me about your self
2) Work experience,
3) project mangement
Interview experience
4
Good
Difficulty level
Hard
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Department related MEP
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is Preaction system
  • Ans. 

    A preaction system is a type of fire protection system that combines the features of a dry pipe system and a deluge system.

    • Preaction systems are commonly used in areas where accidental activation of the sprinkler system could cause water damage, such as data centers or museums.

    • These systems require two separate events to occur before water is released - detection of a fire and activation of the sprinkler heads.

    • Preactio...

  • Answered by AI

I applied via Naukri.com and was interviewed in May 2022. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Second round also simple no need to worry if not selected try is our best work

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic question they asked out of 5 question I answered but some of partially correct and rest thing ok , of select or not select we do not loose our strength and trying is keeping

Interview Questionnaire 

1 Question

  • Q1. ALL CIVIL WORK OF SITE

Interview Preparation Tips

Interview preparation tips for other job seekers - Project Engineer

Tell us how to improve this page.

Interview Questions from Similar Companies

CBRE Interview Questions
4.2
 • 270 Interviews
InvestoXpert Interview Questions
4.2
 • 63 Interviews
M3M India Interview Questions
4.1
 • 48 Interviews
Smartworks Interview Questions
3.6
 • 32 Interviews
Aliens Group Interview Questions
3.2
 • 30 Interviews
Nyati Group Interview Questions
4.2
 • 29 Interviews
Berkadia Interview Questions
3.9
 • 28 Interviews
SMEC Interview Questions
3.7
 • 27 Interviews
View all

Fast track your campus placements

View all
Project Engineer
137 salaries
unlock blur

₹2.6 L/yr - ₹8.1 L/yr

Assistant Project Manager
123 salaries
unlock blur

₹5.2 L/yr - ₹12.2 L/yr

Project Manager
102 salaries
unlock blur

₹7 L/yr - ₹18.8 L/yr

Assistant Facility Manager
95 salaries
unlock blur

₹2.9 L/yr - ₹7.2 L/yr

Senior Project Engineer
83 salaries
unlock blur

₹4.1 L/yr - ₹9.5 L/yr

Explore more salaries
Compare Knight Frank with

CBRE

4.2
Compare

M3M India

4.1
Compare

R.S. Infraprojects

3.9
Compare

My Home Constructions

4.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview