I applied via Naukri.com and was interviewed in May 2022. There was 1 interview round.
To solve construction problems, quality, safety, progress, and time schedule, a project manager should prioritize communication, risk management, and continuous improvement.
Establish clear communication channels with all stakeholders
Identify potential risks and develop contingency plans
Regularly review and improve quality control processes
Ensure compliance with safety regulations and provide training to workers
Monitor
I applied via Approached by Company and was interviewed before Oct 2022. There were 2 interview rounds.
I have a proven track record of working independently and effectively managing client relationships.
Demonstrate past experience of successfully managing projects independently
Highlight strong communication skills in dealing with clients
Show ability to prioritize tasks and meet deadlines without constant supervision
Updating the system involves implementing the latest software updates and patches.
Check for available software updates and patches
Schedule a time for system update to minimize disruption
Backup important data before updating
Test the updated system to ensure functionality
Communicate with stakeholders about the update process
I applied via Referral and was interviewed before May 2023. There were 3 interview rounds.
Work experiences & previous projects handled.
I applied via Approached by Company and was interviewed in Jan 2024. There were 5 interview rounds.
Online based test on basic aptitude and problem solving tests.
I applied via LinkedIn and was interviewed before Nov 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Dec 2021. There were 2 interview rounds.
I have 5 years of experience in the technical field.
I have worked as a software engineer for 3 years and as a technical lead for 2 years.
During my tenure, I have successfully delivered multiple projects on time and within budget.
I have experience in managing cross-functional teams and collaborating with stakeholders.
I am proficient in various programming languages and have a strong understanding of software development
I applied via Company Website and was interviewed before Jan 2023. There was 1 interview round.
Chiller efficiency is a measure of how well a chiller unit is able to cool a space while using the least amount of energy.
Chiller efficiency is typically measured by the Coefficient of Performance (COP), which is the ratio of cooling output to energy input.
Regular maintenance and cleaning of chiller components can improve efficiency.
Upgrading to a more energy-efficient chiller model can also increase efficiency.
Proper ...
Water cooled systems are generally more efficient than air cooled systems due to higher heat transfer capabilities.
Water has higher heat transfer capabilities compared to air
Water cooled systems can maintain more consistent temperatures
Water cooled systems are typically used in high performance applications such as data centers and industrial machinery
Duct velocity can be improved by increasing the fan speed or reducing the duct size.
Increase the fan speed to increase the air velocity in the duct.
Reduce the duct size to increase the air velocity.
Use dampers or adjustable louvers to control and optimize the airflow.
Ensure proper sealing of duct joints to minimize air leakage.
Consider using smooth and straight ducts to reduce friction and improve airflow.
Regularly cle...
The chiller system uses various types of gases for cooling purposes.
Common types of gases used in chiller systems include R-134a, R-410A, and ammonia.
R-134a is a hydrofluorocarbon (HFC) refrigerant commonly used in air conditioning systems.
R-410A is a blend of hydrofluorocarbons used as a replacement for older refrigerants.
Ammonia (NH3) is often used in industrial chiller systems due to its high cooling capacity.
Other ...
The VRF system capacity is determined based on the area's cooling and heating load requirements.
Calculate the total cooling load and heating load for the area
Consider factors such as insulation, windows, occupancy, and equipment
Select VRF system capacity based on the calculated load requirements
Consult with HVAC professionals for accurate sizing
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Assistant Manager
1.6k
salaries
| ₹3.5 L/yr - ₹10.6 L/yr |
Facility Executive
651
salaries
| ₹2 L/yr - ₹6.3 L/yr |
Assistant Facility Manager
519
salaries
| ₹3 L/yr - ₹10.2 L/yr |
Deputy Manager
484
salaries
| ₹4 L/yr - ₹13 L/yr |
Facility Manager
478
salaries
| ₹3.8 L/yr - ₹14.4 L/yr |
JLL
NoBroker
Cushman & Wakefield
Colliers India