Upload Button Icon Add office photos

Knight Frank

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Knight Frank Project Engineer Interview Questions, Process, and Tips

Updated 7 Jan 2024

Top Knight Frank Project Engineer Interview Questions and Answers

Knight Frank Project Engineer Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Chiller efficiency
  • Ans. 

    Chiller efficiency is a measure of how well a chiller unit is able to cool a space while using the least amount of energy.

    • Chiller efficiency is typically measured by the Coefficient of Performance (COP), which is the ratio of cooling output to energy input.

    • Regular maintenance and cleaning of chiller components can improve efficiency.

    • Upgrading to a more energy-efficient chiller model can also increase efficiency.

    • Proper ...

  • Answered by AI
  • Q2. Which one more efficiently? Air cooled,or water cooled???
  • Ans. 

    Water cooled systems are generally more efficient than air cooled systems due to higher heat transfer capabilities.

    • Water has higher heat transfer capabilities compared to air

    • Water cooled systems can maintain more consistent temperatures

    • Water cooled systems are typically used in high performance applications such as data centers and industrial machinery

  • Answered by AI
  • Q3. How we improved duct velocity?
  • Ans. 

    Duct velocity can be improved by increasing the fan speed or reducing the duct size.

    • Increase the fan speed to increase the air velocity in the duct.

    • Reduce the duct size to increase the air velocity.

    • Use dampers or adjustable louvers to control and optimize the airflow.

    • Ensure proper sealing of duct joints to minimize air leakage.

    • Consider using smooth and straight ducts to reduce friction and improve airflow.

    • Regularly cle...

  • Answered by AI
  • Q4. What types of gas use chiller system?
  • Ans. 

    The chiller system uses various types of gases for cooling purposes.

    • Common types of gases used in chiller systems include R-134a, R-410A, and ammonia.

    • R-134a is a hydrofluorocarbon (HFC) refrigerant commonly used in air conditioning systems.

    • R-410A is a blend of hydrofluorocarbons used as a replacement for older refrigerants.

    • Ammonia (NH3) is often used in industrial chiller systems due to its high cooling capacity.

    • Other ...

  • Answered by AI
  • Q5. How we decided the vrf system capacity as per area??
  • Ans. 

    The VRF system capacity is determined based on the area's cooling and heating load requirements.

    • Calculate the total cooling load and heating load for the area

    • Consider factors such as insulation, windows, occupancy, and equipment

    • Select VRF system capacity based on the calculated load requirements

    • Consult with HVAC professionals for accurate sizing

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical round is more important than other rounds so we should prepare that things very easily putting during interview and most important things candidates CV,whatever he mension his cv technically should be know very well' 🙏

Project Engineer Interview Questions & Answers

user image Tarush Sharma

posted on 16 Sep 2017

Interview Questionnaire 

2 Questions

  • Q1. What projects i had done in Bachelors?
  • Ans. 

    I completed various projects during my Bachelor's degree, including a design project for a new bridge and a research project on renewable energy.

    • Designed a new bridge using CAD software

    • Researched and implemented renewable energy sources on campus

    • Collaborated with classmates on a group project to improve campus sustainability

  • Answered by AI
  • Q2. Where i did my 6 months internship?
  • Ans. 

    I completed my 6 months internship at ABC Engineering Firm, where I gained hands-on experience in project management and design.

    • Internship at ABC Engineering Firm

    • Focused on project management and design

    • Hands-on experience gained

  • Answered by AI

Interview Preparation Tips

Round: Technical Interview
Experience: I was fresher, so they usually ask me about my university projects and my final training.
Tips: It will be good if you relate your projects with the company profile.

Project Engineer Interview Questions Asked at Other Companies

asked in Wipro
Q1. Triangle Star Pattern Task Your task is to print a triangle patte ... read more
asked in Wipro
Q2. Encode The String Problem Statement Given a string S of length N, ... read more
asked in Wipro
Q3. Binary to Decimal Conversion Challenge Transform a given binary n ... read more
asked in Wipro
Q4. Mindbending Product Problem Statement You are given an array ARR ... read more
asked in Wipro
Q5. Difference between compiler and interpreter. Why do you apply to ... read more

Interview questions from similar companies

I applied via Referral and was interviewed in Jan 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Previous project breif and some technical from fire protection system and electrical.

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview it was good and the most important thing i was shared a true answer regarding previous project, i will very thankfull to mr.kunal sharma who has shared my resume to cushman.tx....

I applied via Naukri.com and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Related to the works we have handled , project details ,

Interview Preparation Tips

Interview preparation tips for other job seekers - Should be confident about our responsibilities we have handled
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(1 Question)

  • Q1. Basic questions about present job
Round 3 - Technical 

(1 Question)

  • Q1. Basic questions regarding to project
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(1 Question)

  • Q1. Salary details and negotiation
Round 3 - Technical 

(1 Question)

  • Q1. Projects and works done

Interview Questionnaire 

1 Question

  • Q1. ALL CIVIL WORK OF SITE

Interview Preparation Tips

Interview preparation tips for other job seekers - Project Engineer

Interview Questionnaire 

2 Questions

  • Q1. Plumbing,HVAC , Electrical
  • Q2. As pery Experience

Interview Preparation Tips

Interview preparation tips for other job seekers - It's depends on you what you learnt past years
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(2 Questions)

  • Q1. Year of experience in technical field
  • Ans. 

    I have 5 years of experience in the technical field.

    • I have worked as a software engineer for 3 years and as a technical lead for 2 years.

    • During my tenure, I have successfully delivered multiple projects on time and within budget.

    • I have experience in managing cross-functional teams and collaborating with stakeholders.

    • I am proficient in various programming languages and have a strong understanding of software development

  • Answered by AI
  • Q2. Salary expectations required

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for technical field, experience wise answer written in resume.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Nov 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Personal information
  • Q2. Technical information project details
Round 2 - One-on-one 

(2 Questions)

  • Q1. Personal information
  • Q2. Technical information project details
Contribute & help others!
anonymous
You can choose to be anonymous

Knight Frank Interview FAQs

How many rounds are there in Knight Frank Project Engineer interview?
Knight Frank interview process usually has 1 rounds. The most common rounds in the Knight Frank interview process are Technical.
How to prepare for Knight Frank Project Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Knight Frank. The most common topics and skills that interviewers at Knight Frank expect are Project Engineering, Boq, Electricals, MEP and Project Control.
What are the top questions asked in Knight Frank Project Engineer interview?

Some of the top questions asked at the Knight Frank Project Engineer interview -

  1. Which one more efficiently? Air cooled,or water cooled...read more
  2. How we decided the vrf system capacity as per are...read more
  3. What types of gas use chiller syst...read more

Recently Viewed

PHOTOS

InsuranceDekho

3 office photos

LIST OF COMPANIES

Credit Bajaar

Overview

JOBS

Lodha Group

No Jobs

INTERVIEWS

Knight Frank

No Interviews

JOBS

Bajaj Finserv Health

No Jobs

JOBS

Airtel Payments Bank

No Jobs

INTERVIEWS

Casagrand

No Interviews

INTERVIEWS

Altisource

No Interviews

INTERVIEWS

Knight Frank

No Interviews

SALARIES

Knight Frank

Tell us how to improve this page.

Knight Frank Project Engineer Interview Process

based on 3 interviews

Interview experience

5
  
Excellent
View more

Fast track your campus placements

View all
Knight Frank Project Engineer Salary
based on 145 salaries
₹3 L/yr - ₹7.8 L/yr
At par with the average Project Engineer Salary in India
View more details

Knight Frank Project Engineer Reviews and Ratings

based on 30 reviews

4.2/5

Rating in categories

4.2

Skill development

4.0

Work-life balance

4.1

Salary

4.0

Job security

4.0

Company culture

3.4

Promotions

3.9

Work satisfaction

Explore 30 Reviews and Ratings
Project Engineer
145 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Project Manager
129 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
101 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Manager
99 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Facility Manager
97 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Knight Frank with

CBRE

4.2
Compare

JLL

4.1
Compare

Colliers India

3.9
Compare

Cushman & Wakefield

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview