Top Knight Frank Project Engineer Interview Questions and Answers

Knight Frank Project Engineer Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Chiller efficiency
  • Ans. 

    Chiller efficiency is a measure of how well a chiller unit is able to cool a space while using the least amount of energy.

    • Chiller efficiency is typically measured by the Coefficient of Performance (COP), which is the ratio of cooling output to energy input.

    • Regular maintenance and cleaning of chiller components can improve efficiency.

    • Upgrading to a more energy-efficient chiller model can also increase efficiency.

    • Proper ...

  • Answered by AI
  • Q2. Which one more efficiently? Air cooled,or water cooled???
  • Ans. 

    Water cooled systems are generally more efficient than air cooled systems due to higher heat transfer capabilities.

    • Water has higher heat transfer capabilities compared to air

    • Water cooled systems can maintain more consistent temperatures

    • Water cooled systems are typically used in high performance applications such as data centers and industrial machinery

  • Answered by AI
  • Q3. How we improved duct velocity?
  • Ans. 

    Duct velocity can be improved by increasing the fan speed or reducing the duct size.

    • Increase the fan speed to increase the air velocity in the duct.

    • Reduce the duct size to increase the air velocity.

    • Use dampers or adjustable louvers to control and optimize the airflow.

    • Ensure proper sealing of duct joints to minimize air leakage.

    • Consider using smooth and straight ducts to reduce friction and improve airflow.

    • Regularly cle...

  • Answered by AI
  • Q4. What types of gas use chiller system?
  • Ans. 

    The chiller system uses various types of gases for cooling purposes.

    • Common types of gases used in chiller systems include R-134a, R-410A, and ammonia.

    • R-134a is a hydrofluorocarbon (HFC) refrigerant commonly used in air conditioning systems.

    • R-410A is a blend of hydrofluorocarbons used as a replacement for older refrigerants.

    • Ammonia (NH3) is often used in industrial chiller systems due to its high cooling capacity.

    • Other ...

  • Answered by AI
  • Q5. How we decided the vrf system capacity as per area??
  • Ans. 

    The VRF system capacity is determined based on the area's cooling and heating load requirements.

    • Calculate the total cooling load and heating load for the area

    • Consider factors such as insulation, windows, occupancy, and equipment

    • Select VRF system capacity based on the calculated load requirements

    • Consult with HVAC professionals for accurate sizing

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical round is more important than other rounds so we should prepare that things very easily putting during interview and most important things candidates CV,whatever he mension his cv technically should be know very well' 🙏

Project Engineer Interview Questions & Answers

user image Tarush Sharma

posted on 16 Sep 2017

Interview Questionnaire 

2 Questions

  • Q1. What projects i had done in Bachelors?
  • Ans. 

    I completed various projects during my Bachelor's degree, including a design project for a new bridge and a research project on renewable energy.

    • Designed a new bridge using CAD software

    • Researched and implemented renewable energy sources on campus

    • Collaborated with classmates on a group project to improve campus sustainability

  • Answered by AI
  • Q2. Where i did my 6 months internship?
  • Ans. 

    I completed my 6 months internship at ABC Engineering Firm, where I gained hands-on experience in project management and design.

    • Internship at ABC Engineering Firm

    • Focused on project management and design

    • Hands-on experience gained

  • Answered by AI

Interview Preparation Tips

Round: Technical Interview
Experience: I was fresher, so they usually ask me about my university projects and my final training.
Tips: It will be good if you relate your projects with the company profile.

Project Engineer Interview Questions Asked at Other Companies

asked in Wipro
Q1. Triangle Star Pattern Task Your task is to print a triangle patte ... read more
asked in Wipro
Q2. Encode The String Problem Statement Given a string S of length N, ... read more
asked in Wipro
Q3. Binary to Decimal Conversion Challenge Transform a given binary n ... read more
asked in Wipro
Q4. Mindbending Product Problem Statement You are given an array ARR ... read more
asked in Wipro
Q5. Difference between compiler and interpreter. Why do you apply to ... read more

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Technical 

(6 Questions)

  • Q1. What is your current job role & responsibility?
  • Q2. How to manage site as a project engineer.
  • Ans. 

    A project engineer manages a site by overseeing construction activities, coordinating with stakeholders, ensuring compliance with regulations, and resolving issues.

    • Coordinate with project managers, contractors, and subcontractors to ensure smooth workflow.

    • Monitor progress and quality of construction activities to meet project deadlines.

    • Ensure compliance with safety regulations and quality standards.

    • Resolve any issues o...

  • Answered by AI
  • Q3. How much number of slab to give in one months.
  • Ans. 

    The number of slabs to give in one month depends on the project timeline, size of slabs, and resources available.

    • Consider the project timeline and deadlines for completion

    • Evaluate the size and complexity of the slabs to determine production rate

    • Assess the availability of resources such as manpower and equipment

    • Example: If the project requires 100 slabs and the production rate is 10 slabs per week, then it would take 10...

  • Answered by AI
  • Q4. What is the mivan shuttering.
  • Ans. 

    Mivan shuttering is a type of formwork that is used in construction for constructing walls and slabs.

    • Mivan shuttering is a fast-paced construction technique.

    • It involves setting up aluminum formwork to create the structure of walls and slabs.

    • The formwork is reusable and can be quickly assembled and dismantled.

    • Mivan shuttering results in smooth finishes on concrete surfaces.

    • It is commonly used in high-rise buildings and

  • Answered by AI
  • Q5. Types of cement grade and which grade used in M70.
  • Ans. 

    Different types of cement grades include OPC, PPC, PSC, etc. M70 grade typically uses OPC cement.

    • Types of cement grades: OPC, PPC, PSC, etc.

    • M70 grade usually uses OPC cement.

    • OPC (Ordinary Portland Cement) is commonly used in high-strength concrete mixes like M70.

  • Answered by AI
  • Q6. How much experience you have in high rise building.
Round 2 - HR 

(4 Questions)

  • Q1. What is your current salary?
  • Ans. 

    I am currently earning a competitive salary based on my experience and qualifications.

    • My current salary is in line with industry standards.

    • I am open to discussing salary expectations for this role.

    • I believe my compensation reflects my skills and contributions to my current employer.

  • Answered by AI
  • Q2. How much deduction in PF.
  • Ans. 

    The deduction in PF varies based on the employee's salary and the company's policy.

    • PF deduction is typically a percentage of the employee's basic salary

    • The current rate of PF deduction is 12% of the basic salary

    • Some companies may choose to match the employee's contribution to PF

    • Employees can also choose to contribute more than the mandatory 12%

  • Answered by AI
  • Q3. Your expectation salary breakup.
  • Q4. Provide last 3 months salary slips and other documents.

Interview Preparation Tips

Interview preparation tips for other job seekers - Before go to the interview in M3M you should clear the current job responsibility and all technical knowledge related your field.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. What's footing clear cover
  • Ans. 

    Footing clear cover is the distance between the outer face of the concrete footing and the nearest surface of the concrete cover.

    • Footing clear cover is important for protecting the reinforcement bars from corrosion and ensuring structural integrity.

    • It is typically specified in building codes and design drawings.

    • The footing clear cover can vary depending on the type of structure and environmental conditions.

    • For example,...

  • Answered by AI
  • Q2. What's Lapp joint length formula
  • Ans. 

    The Lapp joint length formula is used to calculate the required length of lap joint for a specific application.

    • The formula for calculating Lapp joint length is L = 1.5 * d * t

    • Where L is the required lap joint length, d is the diameter of the fastener, and t is the thickness of the material being joined

    • This formula helps in determining the optimal length of overlap for a strong and secure joint

    • For example, if the diamet...

  • Answered by AI
  • Q3. How much cubs in test rmc load
  • Ans. 

    The number of cubes in a test RMC load varies depending on the specific requirements of the project.

    • The number of cubes in a test RMC load is typically specified by the project engineer or testing standards.

    • Common numbers of cubes in a test RMC load include 3, 7, or 28 cubes.

    • The cubes are used for testing the compressive strength of the concrete mix.

    • The cubes are cast from the same batch of concrete used in the project

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Low tension cable rating 440v
  • Ans. 

    Low tension cables rated for 440V are commonly used for power distribution in residential and commercial buildings.

    • Low tension cables are typically rated for voltages up to 1000V.

    • These cables are commonly used for power distribution in buildings.

    • Examples of low tension cables include PVC insulated cables and XLPE insulated cables.

  • Answered by AI
  • Q2. 11kv cable strenght and voltage
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Technical round and related to experience
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Diffirence between project and project engineering
  • Ans. 

    Project refers to a specific task with a defined start and end, while project engineering involves the technical aspects of planning, designing, and executing the project.

    • Project is the overall task or objective to be completed within a specific timeframe.

    • Project engineering focuses on the technical aspects such as planning, designing, and executing the project.

    • Project management involves coordinating resources and tas...

  • Answered by AI
  • Q2. Types of services in interior fitout
  • Ans. 

    Types of services in interior fitout include design, construction, project management, and installation.

    • Design services involve creating layouts, selecting materials, and creating 3D visualizations.

    • Construction services include building partitions, ceilings, and flooring.

    • Project management services involve coordinating schedules, budgets, and contractors.

    • Installation services include fitting furniture, fixtures, and eq...

  • Answered by AI
Round 3 - One-on-one 

(2 Questions)

  • Q1. Problems faced in site
  • Ans. 

    Some common problems faced on site include delays in material delivery, inclement weather, and coordination issues.

    • Delays in material delivery can impact project timelines and budgets

    • Inclement weather can halt work progress and cause safety concerns

    • Coordination issues between different teams can lead to misunderstandings and errors

  • Answered by AI
  • Q2. Difference between agreement and bond
  • Ans. 

    Agreement is a mutual understanding between parties, while a bond is a legal document that ensures fulfillment of obligations.

    • Agreement is a mutual understanding between two or more parties.

    • A bond is a legal document that guarantees the fulfillment of obligations.

    • Agreements are usually informal and may not always be legally binding.

    • Bonds are formal and legally enforceable documents.

    • Examples of agreements include contra...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Rate Analysis , Reconciliation of materials
  • Q2. Coefficient of cement
  • Ans. 

    The coefficient of cement is a measure of its ability to expand or contract due to changes in temperature or moisture.

    • The coefficient of cement is also known as the coefficient of thermal expansion.

    • It is an important factor to consider in construction projects to prevent cracking or damage to structures.

    • The coefficient of cement varies depending on the type and composition of the cement.

    • For example, Portland cement typ...

  • Answered by AI
  • Q3. Escalation of materials
  • Ans. 

    Escalation of materials refers to the process of increasing the priority or urgency of obtaining necessary materials for a project.

    • Escalation may occur when there are delays in the delivery of materials or when the demand for materials exceeds the supply.

    • Project managers may escalate materials by contacting suppliers to expedite delivery or by seeking alternative sources for the materials.

    • Escalation can impact project ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company , well balanced life, flexible time
Job security
Interview experience
-
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2022. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. Finishing process and all activities in the finishing
  • Q2. Types of tiles and sizes of tiles
  • Ans. 

    Types of tiles include ceramic, porcelain, glass, and natural stone. Sizes vary from small mosaic tiles to large format tiles.

    • Types of tiles: ceramic, porcelain, glass, natural stone

    • Sizes of tiles: small mosaic tiles, large format tiles

    • Examples: Ceramic subway tiles, porcelain wood-look planks, glass mosaic tiles, marble floor tiles

  • Answered by AI
  • Q3. Water proofing process
  • Q4. Coverage areas of finishing materials like gypsum
  • Ans. 

    Coverage areas of finishing materials like gypsum include walls, ceilings, and other surfaces in construction projects.

    • Gypsum is commonly used for finishing walls and ceilings in residential and commercial buildings

    • It can also be used to finish surfaces such as columns, arches, and other architectural elements

    • Gypsum can be applied in various forms such as plaster, drywall, or as a decorative finish

    • The coverage area of ...

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. ALL CIVIL WORK OF SITE

Interview Preparation Tips

Interview preparation tips for other job seekers - Project Engineer

Knight Frank Interview FAQs

How many rounds are there in Knight Frank Project Engineer interview?
Knight Frank interview process usually has 1 rounds. The most common rounds in the Knight Frank interview process are Technical.
How to prepare for Knight Frank Project Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Knight Frank. The most common topics and skills that interviewers at Knight Frank expect are Project Engineering, Boq, Electricals, MEP and Project Control.
What are the top questions asked in Knight Frank Project Engineer interview?

Some of the top questions asked at the Knight Frank Project Engineer interview -

  1. Which one more efficiently? Air cooled,or water cooled...read more
  2. How we decided the vrf system capacity as per are...read more
  3. What types of gas use chiller syst...read more

Tell us how to improve this page.

Knight Frank Project Engineer Interview Process

based on 3 interviews

Interview experience

5
  
Excellent
View more

Fast track your campus placements

View all
Knight Frank Project Engineer Salary
based on 145 salaries
₹3 L/yr - ₹7.8 L/yr
At par with the average Project Engineer Salary in India
View more details

Knight Frank Project Engineer Reviews and Ratings

based on 30 reviews

4.2/5

Rating in categories

4.2

Skill development

4.0

Work-life balance

4.1

Salary

4.0

Job security

4.0

Company culture

3.4

Promotions

3.9

Work satisfaction

Explore 30 Reviews and Ratings
Project Engineer
145 salaries
unlock blur

₹3 L/yr - ₹7.8 L/yr

Assistant Project Manager
129 salaries
unlock blur

₹5.2 L/yr - ₹12.2 L/yr

Assistant Manager
101 salaries
unlock blur

₹4 L/yr - ₹11 L/yr

Project Manager
99 salaries
unlock blur

₹7 L/yr - ₹18 L/yr

Assistant Facility Manager
96 salaries
unlock blur

₹2.9 L/yr - ₹7.2 L/yr

Explore more salaries
Compare Knight Frank with

CBRE

4.2
Compare

JLL

4.1
Compare

Colliers India

3.9
Compare

Cushman & Wakefield

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview