Filter interviews by
I applied via Company Website and was interviewed before Jan 2023. There was 1 interview round.
Chiller efficiency is a measure of how well a chiller unit is able to cool a space while using the least amount of energy.
Chiller efficiency is typically measured by the Coefficient of Performance (COP), which is the ratio of cooling output to energy input.
Regular maintenance and cleaning of chiller components can improve efficiency.
Upgrading to a more energy-efficient chiller model can also increase efficiency.
Proper ...
Water cooled systems are generally more efficient than air cooled systems due to higher heat transfer capabilities.
Water has higher heat transfer capabilities compared to air
Water cooled systems can maintain more consistent temperatures
Water cooled systems are typically used in high performance applications such as data centers and industrial machinery
Duct velocity can be improved by increasing the fan speed or reducing the duct size.
Increase the fan speed to increase the air velocity in the duct.
Reduce the duct size to increase the air velocity.
Use dampers or adjustable louvers to control and optimize the airflow.
Ensure proper sealing of duct joints to minimize air leakage.
Consider using smooth and straight ducts to reduce friction and improve airflow.
Regularly cle...
The chiller system uses various types of gases for cooling purposes.
Common types of gases used in chiller systems include R-134a, R-410A, and ammonia.
R-134a is a hydrofluorocarbon (HFC) refrigerant commonly used in air conditioning systems.
R-410A is a blend of hydrofluorocarbons used as a replacement for older refrigerants.
Ammonia (NH3) is often used in industrial chiller systems due to its high cooling capacity.
Other ...
The VRF system capacity is determined based on the area's cooling and heating load requirements.
Calculate the total cooling load and heating load for the area
Consider factors such as insulation, windows, occupancy, and equipment
Select VRF system capacity based on the calculated load requirements
Consult with HVAC professionals for accurate sizing
I applied via Approached by Company and was interviewed in Jan 2024. There were 5 interview rounds.
Online based test on basic aptitude and problem solving tests.
I appeared for an interview in Mar 2024.
Tell something about yourself.
HVAC stands for Heating, Ventilation, and Air Conditioning. It refers to the technology of indoor environmental comfort.
HVAC systems control temperature, humidity, and air quality in buildings.
Heating can be provided through furnaces, boilers, or heat pumps.
Ventilation involves exchanging indoor and outdoor air to improve air quality.
Air conditioning systems use refrigeration to cool indoor air.
HVAC systems are essenti...
Plumbing system refers to the network of pipes, fixtures, and fittings that deliver water and remove waste in a building.
Plumbing systems include pipes for water supply, drainage, and venting
Fixtures such as sinks, toilets, showers, and bathtubs are connected to the plumbing system
Plumbing systems also include valves, pumps, water heaters, and other equipment
Proper installation and maintenance of plumbing systems are e
FM 200 is a clean agent fire suppression system commonly used in data centers and other critical facilities.
FM 200 is a colorless, odorless gas that is stored in cylinders and discharged into the protected space in the event of a fire.
It works by reducing the oxygen levels in the air to a point where combustion is no longer sustainable.
FM 200 is non-toxic and leaves no residue, making it ideal for use in areas with sen...
LT panel room is a crucial part of electrical systems, housing electrical components for power distribution.
LT panel room is where the electrical distribution board is located for controlling and distributing power to various circuits.
Work sequence involves checking the incoming power supply, monitoring the load requirements, and ensuring proper distribution of power.
Regular maintenance and inspection of LT panel room ...
Knight Frank interview questions for popular designations
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 4 interview rounds.
Roles and Responsibility
Safety in the workplace is crucial to prevent accidents, injuries, and illnesses among employees.
Ensures the well-being of employees and reduces the risk of workplace accidents
Boosts employee morale and productivity by creating a safe work environment
Compliance with safety regulations and standards to avoid legal issues
Reduces absenteeism and healthcare costs associated with workplace injuries
Enhances company reputatio
Get interview-ready with Top Knight Frank Interview Questions
I applied via Recruitment Consulltant and was interviewed in Aug 2023. There was 1 interview round.
Compliances of State government refer to the regulations and guidelines set by the state government that must be followed by building managers.
Building managers need to ensure compliance with state building codes and regulations.
They must adhere to safety standards and obtain necessary permits and licenses.
Building managers may need to comply with environmental regulations and energy efficiency requirements.
They should...
Compliances of building refer to the regulations and standards that must be followed to ensure safety, accessibility, and environmental sustainability.
Building codes and regulations set by local authorities
Fire safety measures and emergency evacuation plans
Accessibility requirements for people with disabilities
Environmental regulations for energy efficiency and sustainability
Health and safety regulations for building o...
I applied via Job Fair and was interviewed in Mar 2024. There were 2 interview rounds.
I can join within 2 months notice period or earlier.
I can join within 2 months notice period as per company policy.
I am also open to joining earlier if required by the company.
I will ensure a smooth transition during the notice period.
HVAC system stands for Heating, Ventilation, and Air Conditioning system, which is used to control the temperature, humidity, and air quality in a building.
HVAC system controls temperature, humidity, and air quality in a building
It includes components like furnaces, air conditioners, heat pumps, and ductwork
Regular maintenance is important to ensure efficient operation
HVAC systems can be centralized or decentralized
Exa...
I applied via Company Website and was interviewed in Apr 2023. There were 2 interview rounds.
I have been working as a Front Office Executive for the past 5 years in a busy corporate office.
Managed front desk operations including greeting visitors, answering phones, and handling inquiries.
Scheduled appointments and meetings for executives.
Maintained office supplies and inventory.
Assisted with administrative tasks such as data entry and filing.
Provided excellent customer service to clients and guests.
Handled inc...
The duration of Knight Frank interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 60 interviews
Interview experience
based on 725 reviews
Rating in categories
Project Engineer
137
salaries
| â‚ą2.6 L/yr - â‚ą8.1 L/yr |
Assistant Project Manager
123
salaries
| â‚ą5.2 L/yr - â‚ą12.2 L/yr |
Project Manager
101
salaries
| â‚ą7 L/yr - â‚ą18 L/yr |
Assistant Facility Manager
94
salaries
| â‚ą2.9 L/yr - â‚ą7.2 L/yr |
Senior Project Engineer
85
salaries
| â‚ą4.1 L/yr - â‚ą9.5 L/yr |
CBRE
M3M India
R.S. Infraprojects
My Home Constructions