Round 1 - Technical 

(2 Questions)

  • Q1. What is hvac system?
  • Ans. 

    HVAC system stands for Heating, Ventilation, and Air Conditioning system, which is used to control the temperature, humidity, and air quality in a building.

    • HVAC system controls temperature, humidity, and air quality in a building

    • It includes components like furnaces, air conditioners, heat pumps, and ductwork

    • Regular maintenance is important to ensure efficient operation

    • HVAC systems can be centralized or decentralized

    • Exa...

  • Answered by AI
  • Q2. Heating ventilation air conditioning system

Interview questions from similar companies

I applied via Referral and was interviewed in Jan 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Previous project breif and some technical from fire protection system and electrical.

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview it was good and the most important thing i was shared a true answer regarding previous project, i will very thankfull to mr.kunal sharma who has shared my resume to cushman.tx....
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(1 Question)

  • Q1. Basic questions about present job
Round 3 - Technical 

(1 Question)

  • Q1. Basic questions regarding to project

I applied via Naukri.com and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Related to the works we have handled , project details ,

Interview Preparation Tips

Interview preparation tips for other job seekers - Should be confident about our responsibilities we have handled
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(1 Question)

  • Q1. Salary details and negotiation
Round 3 - Technical 

(1 Question)

  • Q1. Projects and works done

Interview Questionnaire 

2 Questions

  • Q1. Plumbing,HVAC , Electrical
  • Q2. As pery Experience

Interview Preparation Tips

Interview preparation tips for other job seekers - It's depends on you what you learnt past years

Interview Questionnaire 

1 Question

  • Q1. ALL CIVIL WORK OF SITE

Interview Preparation Tips

Interview preparation tips for other job seekers - Project Engineer
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. LT Side Equipments
Round 3 - HR 

(1 Question)

  • Q1. Introduction & Salary
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .

I applied via Company Website and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About working at previous work done and electrical engineering

Interview Preparation Tips

Interview preparation tips for other job seekers - NA
Contribute & help others!
anonymous
You can choose to be anonymous

Knight Frank Interview FAQs

How many rounds are there in Knight Frank Maintenance Engineer interview?
Knight Frank interview process usually has 1 rounds. The most common rounds in the Knight Frank interview process are Technical.
What are the top questions asked in Knight Frank Maintenance Engineer interview?

Some of the top questions asked at the Knight Frank Maintenance Engineer interview -

  1. What is hvac syst...read more
  2. Heating ventilation air conditioning sys...read more

Recently Viewed

PHOTOS

InsuranceDekho

3 office photos

LIST OF COMPANIES

Credit Bajaar

Overview

PHOTOS

Bihar Urban Infrastructure Development Corporatio

No Photos

REVIEWS

Jana Small Finance Bank

No Reviews

INTERVIEWS

NoBroker

No Interviews

INTERVIEWS

Lodha Group

No Interviews

REVIEWS

Equitas Small Finance Bank

No Reviews

REVIEWS

Jana Small Finance Bank

No Reviews

JOBS

Equitas Small Finance Bank

No Jobs

REVIEWS

Jana Small Finance Bank

No Reviews

Tell us how to improve this page.

Knight Frank Maintenance Engineer Interview Process

based on 1 interview

Interview experience

2
  
Poor
View more

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 353 Interviews
CBRE Interview Questions
4.2
 • 264 Interviews
Square Yards Interview Questions
3.8
 • 198 Interviews
Colliers India Interview Questions
3.9
 • 64 Interviews
MagicBricks Interview Questions
3.6
 • 58 Interviews
M3M India Interview Questions
4.0
 • 48 Interviews
Smartworks Interview Questions
3.5
 • 31 Interviews
Aliens Group Interview Questions
3.2
 • 30 Interviews
View all

Fast track your campus placements

View all
Knight Frank Maintenance Engineer Salary
based on 4 salaries
₹1.8 L/yr - ₹6.5 L/yr
23% more than the average Maintenance Engineer Salary in India
View more details
Project Engineer
145 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Project Manager
129 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
101 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Manager
99 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Facility Manager
97 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Knight Frank with

CBRE

4.2
Compare

JLL

4.1
Compare

Colliers India

3.9
Compare

Cushman & Wakefield

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview