Filter interviews by
Footing clear cover is the distance between the outer face of the concrete footing and the nearest surface of the concrete cover.
Footing clear cover is important for protecting the reinforcement bars from corrosion and ensuring structural integrity.
It is typically specified in building codes and design drawings.
The footing clear cover can vary depending on the type of structure and environmental conditions.
For example,...
The Lapp joint length formula is used to calculate the required length of lap joint for a specific application.
The formula for calculating Lapp joint length is L = 1.5 * d * t
Where L is the required lap joint length, d is the diameter of the fastener, and t is the thickness of the material being joined
This formula helps in determining the optimal length of overlap for a strong and secure joint
For example, if the diamet...
The number of cubes in a test RMC load varies depending on the specific requirements of the project.
The number of cubes in a test RMC load is typically specified by the project engineer or testing standards.
Common numbers of cubes in a test RMC load include 3, 7, or 28 cubes.
The cubes are used for testing the compressive strength of the concrete mix.
The cubes are cast from the same batch of concrete used in the project
I applied via Approached by Company and was interviewed in Jan 2024. There were 3 interview rounds.
Quality control process involves monitoring and maintaining the quality of products or services to ensure they meet standards.
Setting quality standards and specifications
Inspecting and testing products or services
Identifying defects or deviations from standards
Taking corrective actions to address issues
Continuous monitoring and improvement
Aluminium formwork is a construction technique using lightweight aluminum panels for faster and efficient building construction.
Advantages: faster construction time, reusable, high quality finish, cost-effective in long run
Disadvantages: initial high cost, requires skilled labor, limited flexibility in design compared to traditional formwork methods
Safety PPE is essential for protecting workers from hazards. Near misses can be measured through incident reports, observations, and safety audits.
Regularly conduct safety audits to identify any near misses related to PPE usage
Encourage workers to report any incidents or near misses involving PPE
Analyze trends in near misses to identify areas for improvement in PPE protocols
Provide training on proper PPE usage to preve...
The temperature of concrete core samples can provide valuable insights into the curing process and potential strength of the concrete.
Concrete core sample temperature should be monitored regularly during the curing process to ensure proper strength development.
Higher core sample temperatures may indicate faster curing, but could also lead to potential cracking if not controlled.
Lower core sample temperatures may indica...
Concrete strength on cube samples is determined by testing the cubes under specific conditions.
Concrete strength on cube samples is determined through compression testing.
The cubes are typically made from the same batch of concrete used in the construction project.
The cubes are cured under specific conditions, usually in a lab environment, before testing.
The results of the cube tests are used to estimate the strength o...
My Home Constructions interview questions for popular designations
I applied via Walk-in and was interviewed before Sep 2023. There was 1 interview round.
To check raft reinforcement and wall shuttering, visual inspection and measurements are key.
Inspect the alignment and spacing of reinforcement bars in the raft foundation.
Check for proper cover of concrete over the reinforcement bars.
Ensure that the wall shuttering is properly aligned and secured before pouring concrete.
Measure the dimensions of the raft foundation and wall shuttering to confirm they meet the design sp
To check concrete, perform tests like slump test, compressive strength test, and soundness test.
Perform a slump test to check the workability of concrete.
Conduct a compressive strength test to determine the strength of concrete.
Check the soundness of concrete by performing a soundness test.
Inspect the appearance and consistency of the concrete mix.
Ensure proper curing of the concrete to prevent cracks and ensure durabi
Get interview-ready with Top My Home Constructions Interview Questions
I applied via Naukri.com
Safety is the state of being protected from harm or danger.
Safety involves implementing measures to prevent accidents and injuries.
It includes following safety protocols and guidelines in the workplace.
Regular safety inspections and training are essential to maintain a safe environment.
Examples: wearing personal protective equipment, using safety harnesses, following proper lifting techniques.
I applied via Company Website and was interviewed in Jan 2023. There were 2 interview rounds.
Managing a site involves coordinating resources, ensuring safety, and overseeing project progress.
Coordinate with various stakeholders, such as contractors, suppliers, and clients.
Create a detailed project plan, including timelines, budgets, and resource allocation.
Ensure compliance with safety regulations and implement necessary precautions.
Monitor and track project progress, identifying and resolving any issues or de...
A supervisor in the field of electrical engineering is responsible for overseeing and managing the work of a team or department.
Supervising and coordinating the activities of electrical engineers and technicians
Planning and organizing work schedules and assignments
Ensuring compliance with safety regulations and quality standards
Providing technical guidance and support to team members
Monitoring progress and performance ...
I applied via Newspaper Ad and was interviewed in Apr 2023. There were 3 interview rounds.
Maths general awareness, english, current affairs
I applied via Referral and was interviewed before Dec 2023. There was 1 interview round.
Top trending discussions
Interview experience
based on 354 reviews
Rating in categories
Hyderabad / Secunderabad
5-10 Yrs
Not Disclosed
Senior Engineer
75
salaries
| ₹4.2 L/yr - ₹9 L/yr |
Junior Engineer
70
salaries
| ₹1.9 L/yr - ₹4.5 L/yr |
Engineer
64
salaries
| ₹3.5 L/yr - ₹6.2 L/yr |
Assistant Manager
45
salaries
| ₹5.2 L/yr - ₹11 L/yr |
Associate Manager
36
salaries
| ₹4.4 L/yr - ₹14 L/yr |
Prestige Group
DLF
Sobha
Godrej Properties