Footing clear cover is the distance between the outer face of the concrete footing and the nearest surface of the concrete cover.
Footing clear cover is important for protecting the reinforcement bars from corrosion and ensuring structural integrity.
It is typically specified in building codes and design drawings.
The footing clear cover can vary depending on the type of structure and environmental conditions.
For example,...
The Lapp joint length formula is used to calculate the required length of lap joint for a specific application.
The formula for calculating Lapp joint length is L = 1.5 * d * t
Where L is the required lap joint length, d is the diameter of the fastener, and t is the thickness of the material being joined
This formula helps in determining the optimal length of overlap for a strong and secure joint
For example, if the diamet...
The number of cubes in a test RMC load varies depending on the specific requirements of the project.
The number of cubes in a test RMC load is typically specified by the project engineer or testing standards.
Common numbers of cubes in a test RMC load include 3, 7, or 28 cubes.
The cubes are used for testing the compressive strength of the concrete mix.
The cubes are cast from the same batch of concrete used in the project
Top trending discussions
I applied via LinkedIn and was interviewed in May 2024. There were 2 interview rounds.
A project engineer manages a site by overseeing construction activities, coordinating with stakeholders, ensuring compliance with regulations, and resolving issues.
Coordinate with project managers, contractors, and subcontractors to ensure smooth workflow.
Monitor progress and quality of construction activities to meet project deadlines.
Ensure compliance with safety regulations and quality standards.
Resolve any issues o...
The number of slabs to give in one month depends on the project timeline, size of slabs, and resources available.
Consider the project timeline and deadlines for completion
Evaluate the size and complexity of the slabs to determine production rate
Assess the availability of resources such as manpower and equipment
Example: If the project requires 100 slabs and the production rate is 10 slabs per week, then it would take 10...
Mivan shuttering is a type of formwork that is used in construction for constructing walls and slabs.
Mivan shuttering is a fast-paced construction technique.
It involves setting up aluminum formwork to create the structure of walls and slabs.
The formwork is reusable and can be quickly assembled and dismantled.
Mivan shuttering results in smooth finishes on concrete surfaces.
It is commonly used in high-rise buildings and
Different types of cement grades include OPC, PPC, PSC, etc. M70 grade typically uses OPC cement.
Types of cement grades: OPC, PPC, PSC, etc.
M70 grade usually uses OPC cement.
OPC (Ordinary Portland Cement) is commonly used in high-strength concrete mixes like M70.
I am currently earning a competitive salary based on my experience and qualifications.
My current salary is in line with industry standards.
I am open to discussing salary expectations for this role.
I believe my compensation reflects my skills and contributions to my current employer.
The deduction in PF varies based on the employee's salary and the company's policy.
PF deduction is typically a percentage of the employee's basic salary
The current rate of PF deduction is 12% of the basic salary
Some companies may choose to match the employee's contribution to PF
Employees can also choose to contribute more than the mandatory 12%
Low tension cables rated for 440V are commonly used for power distribution in residential and commercial buildings.
Low tension cables are typically rated for voltages up to 1000V.
These cables are commonly used for power distribution in buildings.
Examples of low tension cables include PVC insulated cables and XLPE insulated cables.
I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.
Project refers to a specific task with a defined start and end, while project engineering involves the technical aspects of planning, designing, and executing the project.
Project is the overall task or objective to be completed within a specific timeframe.
Project engineering focuses on the technical aspects such as planning, designing, and executing the project.
Project management involves coordinating resources and tas...
Types of services in interior fitout include design, construction, project management, and installation.
Design services involve creating layouts, selecting materials, and creating 3D visualizations.
Construction services include building partitions, ceilings, and flooring.
Project management services involve coordinating schedules, budgets, and contractors.
Installation services include fitting furniture, fixtures, and eq...
Some common problems faced on site include delays in material delivery, inclement weather, and coordination issues.
Delays in material delivery can impact project timelines and budgets
Inclement weather can halt work progress and cause safety concerns
Coordination issues between different teams can lead to misunderstandings and errors
Agreement is a mutual understanding between parties, while a bond is a legal document that ensures fulfillment of obligations.
Agreement is a mutual understanding between two or more parties.
A bond is a legal document that guarantees the fulfillment of obligations.
Agreements are usually informal and may not always be legally binding.
Bonds are formal and legally enforceable documents.
Examples of agreements include contra...
I applied via Company Website and was interviewed in Feb 2023. There were 2 interview rounds.
The coefficient of cement is a measure of its ability to expand or contract due to changes in temperature or moisture.
The coefficient of cement is also known as the coefficient of thermal expansion.
It is an important factor to consider in construction projects to prevent cracking or damage to structures.
The coefficient of cement varies depending on the type and composition of the cement.
For example, Portland cement typ...
Escalation of materials refers to the process of increasing the priority or urgency of obtaining necessary materials for a project.
Escalation may occur when there are delays in the delivery of materials or when the demand for materials exceeds the supply.
Project managers may escalate materials by contacting suppliers to expedite delivery or by seeking alternative sources for the materials.
Escalation can impact project ...
posted on 26 Dec 2021
I applied via Naukri.com and was interviewed in May 2022. There was 1 interview round.
Types of tiles include ceramic, porcelain, glass, and natural stone. Sizes vary from small mosaic tiles to large format tiles.
Types of tiles: ceramic, porcelain, glass, natural stone
Sizes of tiles: small mosaic tiles, large format tiles
Examples: Ceramic subway tiles, porcelain wood-look planks, glass mosaic tiles, marble floor tiles
Coverage areas of finishing materials like gypsum include walls, ceilings, and other surfaces in construction projects.
Gypsum is commonly used for finishing walls and ceilings in residential and commercial buildings
It can also be used to finish surfaces such as columns, arches, and other architectural elements
Gypsum can be applied in various forms such as plaster, drywall, or as a decorative finish
The coverage area of ...
I applied via Company Website and was interviewed before Jan 2023. There was 1 interview round.
Chiller efficiency is a measure of how well a chiller unit is able to cool a space while using the least amount of energy.
Chiller efficiency is typically measured by the Coefficient of Performance (COP), which is the ratio of cooling output to energy input.
Regular maintenance and cleaning of chiller components can improve efficiency.
Upgrading to a more energy-efficient chiller model can also increase efficiency.
Proper ...
Water cooled systems are generally more efficient than air cooled systems due to higher heat transfer capabilities.
Water has higher heat transfer capabilities compared to air
Water cooled systems can maintain more consistent temperatures
Water cooled systems are typically used in high performance applications such as data centers and industrial machinery
Duct velocity can be improved by increasing the fan speed or reducing the duct size.
Increase the fan speed to increase the air velocity in the duct.
Reduce the duct size to increase the air velocity.
Use dampers or adjustable louvers to control and optimize the airflow.
Ensure proper sealing of duct joints to minimize air leakage.
Consider using smooth and straight ducts to reduce friction and improve airflow.
Regularly cle...
The chiller system uses various types of gases for cooling purposes.
Common types of gases used in chiller systems include R-134a, R-410A, and ammonia.
R-134a is a hydrofluorocarbon (HFC) refrigerant commonly used in air conditioning systems.
R-410A is a blend of hydrofluorocarbons used as a replacement for older refrigerants.
Ammonia (NH3) is often used in industrial chiller systems due to its high cooling capacity.
Other ...
The VRF system capacity is determined based on the area's cooling and heating load requirements.
Calculate the total cooling load and heating load for the area
Consider factors such as insulation, windows, occupancy, and equipment
Select VRF system capacity based on the calculated load requirements
Consult with HVAC professionals for accurate sizing
posted on 18 Jun 2023
I applied via Company Website and was interviewed in Oct 2023. There were 6 interview rounds.
Interview experience
based on 3 reviews
Rating in categories
Senior Engineer
76
salaries
| ₹4.2 L/yr - ₹9 L/yr |
Junior Engineer
72
salaries
| ₹2.4 L/yr - ₹4.5 L/yr |
Engineer
67
salaries
| ₹3.5 L/yr - ₹6.2 L/yr |
Assistant Manager
47
salaries
| ₹5.2 L/yr - ₹11 L/yr |
Associate Manager
36
salaries
| ₹4.4 L/yr - ₹14 L/yr |
Prestige Group
DLF
Sobha
Godrej Properties