I applied via LinkedIn and was interviewed in May 2024. There were 2 interview rounds.
A project engineer manages a site by overseeing construction activities, coordinating with stakeholders, ensuring compliance with regulations, and resolving issues.
Coordinate with project managers, contractors, and subcontractors to ensure smooth workflow.
Monitor progress and quality of construction activities to meet project deadlines.
Ensure compliance with safety regulations and quality standards.
Resolve any issues o...
The number of slabs to give in one month depends on the project timeline, size of slabs, and resources available.
Consider the project timeline and deadlines for completion
Evaluate the size and complexity of the slabs to determine production rate
Assess the availability of resources such as manpower and equipment
Example: If the project requires 100 slabs and the production rate is 10 slabs per week, then it would take 10...
Mivan shuttering is a type of formwork that is used in construction for constructing walls and slabs.
Mivan shuttering is a fast-paced construction technique.
It involves setting up aluminum formwork to create the structure of walls and slabs.
The formwork is reusable and can be quickly assembled and dismantled.
Mivan shuttering results in smooth finishes on concrete surfaces.
It is commonly used in high-rise buildings and
Different types of cement grades include OPC, PPC, PSC, etc. M70 grade typically uses OPC cement.
Types of cement grades: OPC, PPC, PSC, etc.
M70 grade usually uses OPC cement.
OPC (Ordinary Portland Cement) is commonly used in high-strength concrete mixes like M70.
I am currently earning a competitive salary based on my experience and qualifications.
My current salary is in line with industry standards.
I am open to discussing salary expectations for this role.
I believe my compensation reflects my skills and contributions to my current employer.
The deduction in PF varies based on the employee's salary and the company's policy.
PF deduction is typically a percentage of the employee's basic salary
The current rate of PF deduction is 12% of the basic salary
Some companies may choose to match the employee's contribution to PF
Employees can also choose to contribute more than the mandatory 12%
Top trending discussions
posted on 7 Apr 2022
I applied via Naukri.com and was interviewed in Oct 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2023. There were 3 interview rounds.
We conduct quality checks at every stage of the project to ensure compliance with standards and specifications.
Performing visual inspections of materials and equipment
Conducting tests and measurements to verify performance
Reviewing documentation for accuracy and completeness
Implementing corrective actions when deviations are found
General question related to interest rate,Shape Iq,Relation ,Current affairs ,related to civil
Mivan shuttering is a construction technique using aluminum formwork for casting concrete walls, slabs, columns, etc.
Mivan shuttering involves setting up aluminum formwork panels on site
The formwork is assembled and fixed using pins, wedges, and wallers
Concrete is poured into the formwork and allowed to set
Once the concrete has cured, the formwork is removed and reused for the next casting
Mivan shuttering is known for
I applied via Naukri.com and was interviewed in Apr 2022. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.
Some general questions
Initiating substructure to finishing work involves proper planning, coordination, and communication.
Develop a detailed project plan outlining the sequence of activities from substructure to finishing work
Coordinate with subcontractors and suppliers to ensure timely delivery of materials and equipment
Communicate effectively with the project team to ensure everyone is clear on their roles and responsibilities
Regularly mo...
I handle my activities by prioritizing tasks, setting goals, creating schedules, delegating when necessary, and staying organized.
Prioritize tasks based on deadlines and importance
Set specific goals for each activity to stay focused
Create a schedule or to-do list to track progress
Delegate tasks to team members when needed to improve efficiency
Stay organized by keeping track of documents, emails, and meetings
My previous company was a construction firm specializing in commercial building projects.
Managed project timelines and budgets
Coordinated with architects, engineers, and subcontractors
Ensured compliance with building codes and regulations
Implemented quality control measures
Completed projects on time and within budget
Waterproofing is the process of making a structure or object resistant to water penetration.
Waterproofing can be done using various materials such as membranes, coatings, and sealants.
Proper surface preparation is essential before applying waterproofing materials.
Regular maintenance and inspections are necessary to ensure the effectiveness of waterproofing.
Examples of waterproofing methods include using waterproof memb...
BBS stands for Behavior-Based Safety, a systematic approach to preventing workplace accidents by focusing on behaviors that can lead to incidents.
Conduct a thorough analysis of the workplace to identify potential hazards and at-risk behaviors
Develop safety procedures and protocols based on the identified hazards
Train employees on the importance of following safety protocols and encourage reporting of unsafe behaviors
Im...
I applied via Referral and was interviewed in Jul 2022. There were 4 interview rounds.
based on 2 interviews
Interview experience
based on 5 reviews
Rating in categories
Assistant Manager
167
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
92
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
85
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
78
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
60
salaries
| ₹0 L/yr - ₹0 L/yr |
DLF
Sobha
Prestige Group
Godrej Properties