I applied via Naukri.com and was interviewed in May 2022. There was 1 interview round.
To solve construction problems, quality, safety, progress, and time schedule, a project manager should prioritize communication, risk management, and continuous improvement.
Establish clear communication channels with all stakeholders
Identify potential risks and develop contingency plans
Regularly review and improve quality control processes
Ensure compliance with safety regulations and provide training to workers
Monitor
I applied via Approached by Company and was interviewed before May 2023. There was 1 interview round.
I believe in building strong relationships with vendors based on clear communication, mutual respect, and accountability.
Establish clear expectations and goals with vendors
Regularly communicate and provide feedback to vendors
Hold vendors accountable for deliverables and performance
Seek to build long-term partnerships based on trust and collaboration
I was interviewed in May 2022.
I applied via Referral and was interviewed in Nov 2021. There were 2 interview rounds.
Knight Frank interview questions for popular designations
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Key documents for tracking site progress include daily reports, progress reports, inspection reports, and project schedules.
Daily reports: Provide a summary of activities, progress, and issues encountered on site each day.
Progress reports: Detail the overall progress of the project, including milestones achieved and any delays.
Inspection reports: Document the results of site inspections, highlighting any non-compliance...
Get interview-ready with Top Knight Frank Interview Questions
I applied via Naukri.com and was interviewed in Feb 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Oct 2022. There were 2 interview rounds.
I have a proven track record of working independently and effectively managing client relationships.
Demonstrate past experience of successfully managing projects independently
Highlight strong communication skills in dealing with clients
Show ability to prioritize tasks and meet deadlines without constant supervision
UPS ensures uninterrupted power supply during power outages and protects equipment from power surges.
UPS stands for Uninterruptible Power Supply
It provides backup power during power outages
UPS also protects equipment from power surges and voltage fluctuations
UPS can be of different types such as standby, line-interactive, and online
UPS batteries need to be replaced periodically for optimal performance
HVAC systems are responsible for heating, ventilation, and air conditioning in buildings, ensuring comfort and safety.
HVAC systems regulate temperature, humidity, and air quality in indoor spaces.
They consist of various components such as furnaces, air conditioners, heat pumps, fans, and ductwork.
Safety measures include regular maintenance, proper installation, and adherence to building codes.
HVAC systems should be des...
Fire alarm and fire fighting systems are designed to detect and extinguish fires in buildings.
Fire alarm systems use sensors to detect smoke or heat and trigger an alarm to alert occupants of the building.
Fire fighting systems include sprinklers, fire extinguishers, and fire hoses.
Sprinkler systems are designed to automatically release water when a fire is detected.
Fire extinguishers are portable devices that can be us...
Power Distribution SLD is a schematic diagram that shows the distribution of power in an electrical system.
SLD stands for Single Line Diagram
It shows the flow of power from the source to the loads
It includes information about transformers, switchgear, and protective devices
It is used for design, construction, and maintenance of electrical systems
Transformers work on the principle of electromagnetic induction and require proper grounding and insulation for safety.
Transformers convert electrical energy from one circuit to another through electromagnetic induction
They consist of two coils, primary and secondary, wound around a magnetic core
The primary coil is connected to the input voltage source and the secondary coil to the load
Safety measures include proper gr...
SLD of UPS system refers to the Single Line Diagram of the system.
SLD is a graphical representation of the electrical system that shows all the components and their interconnections.
It is used to design, install, and maintain the UPS system.
SLD includes information about the power sources, distribution panels, transformers, UPS units, and loads.
It helps in identifying the fault location and isolating the faulty compone...
DG sets are backup power sources used in case of power outages. Safety measures include regular maintenance and proper ventilation.
DG sets are diesel-powered generators that provide backup power in case of power outages.
They are commonly used in hospitals, data centers, and other critical facilities.
Safety measures include regular maintenance to ensure proper functioning and prevent accidents.
Proper ventilation is also...
Water treatment systems purify water for safe consumption. Distribution involves transporting treated water to consumers.
Water treatment systems remove impurities and contaminants from water.
Common methods include filtration, sedimentation, and disinfection.
Treated water is then distributed through a network of pipes and pumps.
Distribution systems must be regularly maintained to ensure water quality.
Chlorine is often a...
Procurement of materials and approvals in engineering involve several procedures and authorities.
Identify the required materials and their specifications
Prepare a list of potential suppliers and obtain quotes
Evaluate the quotes and select the supplier
Obtain necessary approvals from concerned authorities
Place the purchase order and track the delivery
Inspect the materials upon receipt to ensure compliance with specificat
Cost saving initiatives can be implemented through various measures.
Conducting a cost analysis to identify areas of potential savings
Reducing unnecessary expenses such as travel and entertainment
Negotiating better deals with suppliers
Implementing energy-efficient practices
Encouraging remote work to reduce office space costs
Investing in automation to reduce labor costs
Consolidating operations to reduce overhead costs
Annual maintenance contract & vendor management are crucial for efficient operations.
Annual maintenance contracts should be reviewed and renewed on time.
Vendor management procedures should include regular communication and performance evaluation.
Contracts should clearly define the scope of work, timelines, and payment terms.
Vendor selection should be based on factors such as quality, reliability, and cost-effectiveness...
Capex refers to capital expenditures, while opex refers to operational expenses.
Capex is the money spent on acquiring or upgrading physical assets like property, equipment, or infrastructure.
Opex is the money spent on day-to-day operations like salaries, utilities, and maintenance.
Capex is usually a one-time expense, while opex is ongoing.
Capex is often used to increase the company's long-term value, while opex is nece...
Escalation matrix is a hierarchical process of escalating issues to higher authorities for resolution.
It is a structured process for resolving issues that cannot be resolved at lower levels.
It defines the hierarchy of authorities to be contacted in case of an issue.
It helps in timely resolution of issues by ensuring that they are escalated to the right authority.
It is commonly used in customer support, IT support, and ...
Elevators are essential for modern buildings, and their safety is crucial for passengers' well-being.
Elevators must undergo regular maintenance and inspections to ensure their safety.
Safety features such as emergency brakes, door sensors, and alarms must be installed and functioning properly.
Elevator operators must be trained and certified to operate the elevator safely.
Building codes and regulations must be followed t...
Statutory approvals are legal permissions required for a project or activity to comply with laws and regulations.
Statutory approvals are mandatory legal permissions required for any project or activity.
These approvals ensure that the project or activity complies with all the laws and regulations of the concerned authorities.
Examples of statutory approvals include building permits, environmental clearances, and licenses...
I applied via Recruitment Consulltant and was interviewed before Aug 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed in Mar 2022. There was 1 interview round.
Top trending discussions
The duration of Knight Frank interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 61 interviews
Interview experience
based on 706 reviews
Rating in categories
Project Engineer
145
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Assistant Project Manager
129
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Assistant Manager
101
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Project Manager
99
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Assistant Facility Manager
97
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
CBRE
JLL
Colliers India
Cushman & Wakefield