Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Isgec Heavy Engineering Team. If you also belong to the team, you can get access from here

Isgec Heavy Engineering Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Isgec Heavy Engineering Interview Questions, Process, and Tips

Updated 26 Feb 2025

Top Isgec Heavy Engineering Interview Questions and Answers

View all 77 questions

Isgec Heavy Engineering Interview Experiences

Popular Designations

117 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Logical Reasoning, English Quant, Aptitude

Round 2 - Technical 

(2 Questions)

  • Q1. Question on Technical Knowledge
  • Q2. Ask About Your Experience and Background

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on Technical Knowledge
Focus on Personality and Behaviour

Electrical Engineer Interview Questions asked at other Companies

Q1. What is the difference between Switch gear & Circuit Breakers ?
View answer (11)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Naukri.com and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Difference between csh And vsh spring
  • Ans. 

    CSH and VSH springs are both types of springs used in piping systems, with CSH springs being more flexible and VSH springs being more rigid.

    • CSH springs are more flexible and provide better vibration isolation

    • VSH springs are more rigid and provide better support for heavy loads

    • CSH springs are typically used in applications where vibration control is critical, such as sensitive equipment installations

    • VSH springs are comm...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Ready to relocate
  • Ans. 

    Yes, I am open to relocating for the right opportunity.

    • I am willing to relocate for the right job opportunity

    • I am open to exploring new locations and experiences

    • I understand the importance of flexibility in the engineering field

  • Answered by AI

Piping Engineer Interview Questions asked at other Companies

Q1. What is the basic difference between Pipe specification A106 Gr.A / Gr.B/ Gr.C.?
View answer (4)

Project Manager Interview Questions & Answers

user image Ratnesh Gupta

posted on 6 Dec 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Detailed about Project Management Process
  • Q2. Contact Management related questions

Project Manager Interview Questions asked at other Companies

Q1. What is success & what is failure to you? How do you handle failure? - not much interviewer asks such questions, but I believe these are very important questions, if you want to succeed.
View answer (1)
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Basic design concepts of structural steel
  • Q2. Knowledge of basic engineering
  • Q3. HR: Tried there best to break the salary expectation
Round 3 - One-on-one 

(1 Question)

  • Q1. Usage of the ERP system of documents tranfer
  • Ans. 

    ERP system is used for efficient transfer of documents in structural design engineering.

    • ERP system helps in automating the document transfer process

    • It ensures that the right documents are available to the right people at the right time

    • It reduces the risk of errors and delays in document transfer

    • Examples of ERP systems used in structural design engineering are SAP, Oracle, and Microsoft Dynamics

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and truthful. Believe in yourself. Prepare technically

Skills evaluated in this interview

Structural Design Engineer Interview Questions asked at other Companies

Q1. IS 456 design clauses with min max bar requirements
View answer (2)

Isgec Heavy Engineering interview questions for popular designations

 Senior Engineer

 (8)

 Assistant Manager

 (5)

 Deputy Manager

 (4)

 Assistant Engineer

 (3)

 Design Engineer

 (3)

 Electrical Engineer

 (3)

 Project Manager

 (3)

 Safety Officer

 (3)

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. HOW MANY TYPES OF BOILER
  • Ans. 

    There are two main types of boilers: fire tube boilers and water tube boilers.

    • Fire tube boilers have hot gases passing through the tubes which are surrounded by water. Examples include Scotch marine boilers.

    • Water tube boilers have water flowing inside the tubes while hot gases surround them. Examples include Babcock and Wilcox boilers.

  • Answered by AI
  • Q2. WELDING OF T93 JOINTS
  • Ans. 

    Welding of T93 joints requires specialized techniques and equipment to ensure a strong and durable bond.

    • T93 is a high-strength steel alloy commonly used in construction for its excellent mechanical properties.

    • Welding T93 joints requires preheating to reduce the risk of cracking and post-weld heat treatment for optimal strength.

    • Specialized welding techniques such as TIG welding or submerged arc welding are often used fo...

  • Answered by AI
  • Q3. SEQUENCE OF ERECTION OF BOILER
  • Ans. 

    The sequence of erection of a boiler involves several steps to ensure proper installation and functionality.

    • 1. Foundation preparation and installation of base plates

    • 2. Erection of boiler structure and setting of walls

    • 3. Installation of boiler tubes and headers

    • 4. Mounting of boiler accessories such as safety valves and gauges

    • 5. Connection of piping and wiring for steam and water supply

    • 6. Testing and commissioning of the

  • Answered by AI
  • Q4. SEQUENCE OF ERECTION OF ESP
  • Ans. 

    The sequence of erection of ESP involves several steps to ensure proper installation and functioning.

    • 1. Site preparation including foundation construction and leveling of the ground.

    • 2. Installation of support structures such as columns and beams.

    • 3. Assembly of the ESP components including the casing, electrodes, and collecting plates.

    • 4. Connection of electrical wiring and control systems.

    • 5. Testing and commissioning to...

  • Answered by AI
  • Q5. BAISIC KNOWALAGE OF ROTARY PARTS

Interview Preparation Tips

Interview preparation tips for other job seekers - BE CONFIDENT

Assistant Construction Manager Interview Questions asked at other Companies

Q1. In a Case, If 12mm dia rebar in your drawing and spacing is 150 mm. In case you are not having it at that time and you have to change it with 16 mm. what would be the spacing according 16 mm dia rebar?
View answer (3)

Get interview-ready with Top Isgec Heavy Engineering Interview Questions

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Basic construction questions
Round 3 - Salary negotiation 

(1 Question)

  • Q1. About the hike and location of posting

Interview Preparation Tips

Interview preparation tips for other job seekers - Liberty to work and work oriented and result oriented company with higher management

Senior Manager Interview Questions asked at other Companies

Q1. 1. What you understand the requirement of shuttering material at project site?
View answer (19)

Jobs at Isgec Heavy Engineering

View all
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Technical aptitude math general science social science

Round 2 - Technical 

(1 Question)

  • Q1. Introduction and cnc programming

Interview Preparation Tips

Interview preparation tips for other job seekers - ok its very good

Junior Engineer Trainee Interview Questions asked at other Companies

Q1. How can be the powerfactor improved?
View answer (12)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I was interviewed in Aug 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical questions about plant and DM plant and Coal Analysis and Analytics type
  • Q2. Coal report of power plant and water analysis of power plant operation
  • Ans. 

    Coal report and water analysis are crucial for power plant operation.

    • Coal report provides information on the quality and quantity of coal used in the power plant.

    • Water analysis helps in monitoring the quality of water used in the power plant.

    • Both reports are important for ensuring efficient and safe operation of the power plant.

    • Coal report can help in identifying any issues with coal quality that may affect the perform...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Concept of about core subjects and DM plant and Coal Analysis and all over about plant

Shift Incharge Interview Questions asked at other Companies

Q1. Tell me about power factor and how to keep always .80?
View answer (5)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Detailed discussion on corporate laws and SEBI Rules & Regulations
Round 3 - Group Discussion 

Practical aspects, complinace mechanism, practicals problems and possible solution.

Round 4 - HR 

(1 Question)

  • Q1. Don't want to share as it is something confidential discussion.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always write the assignments handled by you. Prepare short and crisp CV. Avoid juggling. Keep things simple and ready to give clear and concise answers. Don't try to lie. Most important, be humble and confident.

Company Secretary Interview Questions asked at other Companies

Q1. do you have any technical certifications how many programming languages do you know what is the extent of your technical expertise how many development tools have you used
View answer (2)

Draughtsman Interview Questions & Answers

user image Prak ash

posted on 15 Jan 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Study for Boiler related
  • Q2. Cfbc, oil & gas, TG Boilers process

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company to learn more. Check convenient location during joining

Draughtsman Interview Questions asked at other Companies

Q1. what is the difference between line command and polyline command?
View answer (2)

Isgec Heavy Engineering Interview FAQs

How many rounds are there in Isgec Heavy Engineering interview?
Isgec Heavy Engineering interview process usually has 2-3 rounds. The most common rounds in the Isgec Heavy Engineering interview process are Technical, Resume Shortlist and HR.
How to prepare for Isgec Heavy Engineering interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Isgec Heavy Engineering. The most common topics and skills that interviewers at Isgec Heavy Engineering expect are Pressure Vessels, Heat Exchangers, Power Plant, Columns and Boiler Operations.
What are the top questions asked in Isgec Heavy Engineering interview?

Some of the top questions asked at the Isgec Heavy Engineering interview -

  1. How many Engineering Documents will be process if you handle EPC proje...read more
  2. What is the process of Engineering Drawings process submission to Client Step b...read more
  3. What is the role of Document Controller in Multinational EPC companies...read more
How long is the Isgec Heavy Engineering interview process?

The duration of Isgec Heavy Engineering interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Isgec Heavy Engineering Interview Process

based on 144 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

Larsen & Toubro Limited Interview Questions
4.0
 • 1.4k Interviews
Siemens Interview Questions
4.1
 • 430 Interviews
Thermax Limited Interview Questions
4.2
 • 247 Interviews
Cummins Interview Questions
4.3
 • 231 Interviews
Tata Power Interview Questions
3.9
 • 162 Interviews
Voltas Interview Questions
4.0
 • 129 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
Kirloskar Brothers Interview Questions
3.8
 • 67 Interviews
Bharat Forge Interview Questions
3.9
 • 55 Interviews
View all

Isgec Heavy Engineering Reviews and Ratings

based on 1.4k reviews

3.8/5

Rating in categories

3.6

Skill development

3.5

Work-life balance

3.6

Salary

3.9

Job security

3.4

Company culture

3.1

Promotions

3.5

Work satisfaction

Explore 1.4k Reviews and Ratings
Design Engineer - Process Equipment Division

Yamunanagar

10-16 Yrs

â‚ą 10-16 LPA

Expeditor - ISGEC Titan - JV

Yamunanagar

3-6 Yrs

â‚ą 3-6 LPA

Explore more jobs
Assistant Manager
323 salaries
unlock blur

â‚ą7.5 L/yr - â‚ą16.7 L/yr

Senior Engineer
293 salaries
unlock blur

â‚ą5.5 L/yr - â‚ą13 L/yr

Deputy Manager
192 salaries
unlock blur

â‚ą8.5 L/yr - â‚ą22 L/yr

Engineer
169 salaries
unlock blur

â‚ą3.1 L/yr - â‚ą9 L/yr

Manager
141 salaries
unlock blur

â‚ą8 L/yr - â‚ą24 L/yr

Explore more salaries
Compare Isgec Heavy Engineering with

Thermax Limited

4.1
Compare

BHEL

4.1
Compare

Larsen & Toubro Limited

4.0
Compare

Tata Power

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview