I applied via Approached by Company and was interviewed before Aug 2022. There were 3 interview rounds.
I applied via Referral and was interviewed before Jan 2022. There were 3 interview rounds.
IS code for TMT bar & RMC plant specification is IS 1786:2008 and IS 4926:2003 respectively.
IS 1786:2008 specifies the requirements for high strength deformed steel bars and wires for concrete reinforcement.
IS 4926:2003 specifies the requirements for ready-mixed concrete (RMC) plant, including materials, mixing, transporting, and testing.
Both codes are important for ensuring quality and safety in construction projects.
BIS code is a standard set by Bureau of Indian Standards while IS code is a specific code within the BIS code.
BIS code covers a wide range of standards for various industries while IS code is specific to Indian Standards for a particular product or process.
IS code is a subset of BIS code and is used for quality control and assurance purposes.
For example, BIS code for cement covers various aspects like composition, pack...
NDT tests are non-destructive methods used to evaluate the properties of materials without causing damage.
NDT tests include methods like ultrasonic testing, radiography, magnetic particle testing, and liquid penetrant testing.
The criteria for NDT tests depend on the type of test being performed and the material being tested.
For example, in ultrasonic testing, the criteria may include the size and location of any defect...
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.
Isgec Heavy Engineering interview questions for popular designations
I applied via Recruitment Consulltant and was interviewed before Dec 2021. There were 2 interview rounds.
Get interview-ready with Top Isgec Heavy Engineering Interview Questions
I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.
EPC businesses can survive in turbulent markets by diversifying their offerings, focusing on cost optimization, and building strong relationships with clients.
Diversify offerings to include renewable energy and other sustainable solutions
Focus on cost optimization through efficient project management and procurement
Build strong relationships with clients to ensure repeat business and referrals
Invest in research and dev...
Steel price and challenge
I applied via Approached by Company and was interviewed before Feb 2022. There were 3 interview rounds.
I applied via Company Website and was interviewed in Nov 2021. There was 1 interview round.
The erection sequence of a boiler and ESP involves several steps to ensure proper installation and functioning.
The foundation for the boiler and ESP must be prepared and laid out.
The boiler and ESP components are then assembled and installed on the foundation.
The piping and ductwork are connected to the boiler and ESP.
The electrical and control systems are installed and connected.
The boiler and ESP are tested and commi...
I applied via Referral and was interviewed before Jun 2022. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed before Jan 2021. There was 1 interview round.
The number of engineering documents processed in an EPC project varies depending on the project size and complexity.
The number of engineering documents processed in an EPC project can range from a few hundred to several thousand.
It depends on the scope of the project, the number of disciplines involved, and the duration of the project.
For example, a small EPC project may involve processing around 500 engineering docume...
The role of a Document Controller in Multinational EPC companies is to manage and control all project documents.
Maintain document control procedures
Ensure all documents are properly formatted and stored
Track and manage document revisions
Coordinate with project teams to ensure timely submission of documents
Ensure compliance with company and industry standards
Provide support during audits and inspections
The first step of Engineering and Vendor Document process is to identify the required documents and their formats.
Identify the required documents for the project
Determine the format and standard for each document
Create a document register to track all documents
Establish a document control system to manage the documents
Communicate the document requirements to vendors and contractors
Vendor documents are managed through a process that involves review, approval, and tracking.
Vendor documents are received and reviewed for completeness and accuracy.
Documents are then approved by the relevant parties, such as the project manager or engineering team.
Once approved, documents are tracked and stored in a central repository for easy access and retrieval.
Examples of vendor documents include equipment specifi...
The process of submitting engineering drawings to clients involves several steps.
Review the drawings for accuracy and completeness
Obtain approval from the relevant parties
Compile the drawings into a package
Submit the package to the client
Track the progress of the submission and follow up as necessary
TBE stands for Technical Bid Evaluation and TQ stands for Technical Query. They are used in EPC projects for vendor selection and clarification of technical issues.
TBE is a process of evaluating technical bids submitted by vendors to ensure that they meet the project requirements.
TQ is a formal request for clarification on technical issues related to the project.
TBE and TQ are important tools for vendor selection and c...
Top trending discussions
Interview experience
based on 1.3k reviews
Rating in categories
Assistant Manager
318
salaries
| ₹7 L/yr - ₹16.7 L/yr |
Senior Engineer
282
salaries
| ₹4.5 L/yr - ₹13.2 L/yr |
Deputy Manager
190
salaries
| ₹9.5 L/yr - ₹21 L/yr |
Manager
149
salaries
| ₹8 L/yr - ₹24 L/yr |
Engineer
145
salaries
| ₹3.5 L/yr - ₹9 L/yr |
Thermax Limited
BHEL
Larsen & Toubro Limited
Tata Power