Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Isgec Heavy Engineering Team. If you also belong to the team, you can get access from here

Isgec Heavy Engineering Verified Tick

Compare button icon Compare button icon Compare
3.8

based on 1.3k Reviews

Filter interviews by

Isgec Heavy Engineering Document Controller Interview Questions, Process, and Tips

Updated 29 Jan 2022

Isgec Heavy Engineering Document Controller Interview Experiences

1 interview found

I applied via Recruitment Consultant and was interviewed before Jan 2021. There was 1 interview round.

Interview Questionnaire 

7 Questions

  • Q1. How many Engineering Documents will be process if you handle EPC project?
  • Ans. 

    The number of engineering documents processed in an EPC project varies depending on the project size and complexity.

    • The number of engineering documents processed in an EPC project can range from a few hundred to several thousand.

    • It depends on the scope of the project, the number of disciplines involved, and the duration of the project.

    • For example, a small EPC project may involve processing around 500 engineering docume...

  • Answered by AI
  • Q2. What is the role of Document Controller in Multinational EPC companies?
  • Ans. 

    The role of a Document Controller in Multinational EPC companies is to manage and control all project documents.

    • Maintain document control procedures

    • Ensure all documents are properly formatted and stored

    • Track and manage document revisions

    • Coordinate with project teams to ensure timely submission of documents

    • Ensure compliance with company and industry standards

    • Provide support during audits and inspections

  • Answered by AI
  • Q3. What is the first step of Engineering and Vendor Document process?
  • Ans. 

    The first step of Engineering and Vendor Document process is to identify the required documents and their formats.

    • Identify the required documents for the project

    • Determine the format and standard for each document

    • Create a document register to track all documents

    • Establish a document control system to manage the documents

    • Communicate the document requirements to vendors and contractors

  • Answered by AI
  • Q4. How many PO's are generate if you will handle 670 Cr EPC project? How will you define Area Drawings?
  • Q5. How could you handle Vendor Documents. What is the process of Vendor Documentation in EPC project?
  • Ans. 

    Vendor documents are managed through a process that involves review, approval, and tracking.

    • Vendor documents are received and reviewed for completeness and accuracy.

    • Documents are then approved by the relevant parties, such as the project manager or engineering team.

    • Once approved, documents are tracked and stored in a central repository for easy access and retrieval.

    • Examples of vendor documents include equipment specifi...

  • Answered by AI
  • Q6. What is the process of Engineering Drawings process submission to Client Step by Step?
  • Ans. 

    The process of submitting engineering drawings to clients involves several steps.

    • Review the drawings for accuracy and completeness

    • Obtain approval from the relevant parties

    • Compile the drawings into a package

    • Submit the package to the client

    • Track the progress of the submission and follow up as necessary

  • Answered by AI
  • Q7. What is TBE and TQ. What is the use in EPC projects.
  • Ans. 

    TBE stands for Technical Bid Evaluation and TQ stands for Technical Query. They are used in EPC projects for vendor selection and clarification of technical issues.

    • TBE is a process of evaluating technical bids submitted by vendors to ensure that they meet the project requirements.

    • TQ is a formal request for clarification on technical issues related to the project.

    • TBE and TQ are important tools for vendor selection and c...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please be prepared for Interview. Any question can be asked by Project Director/Project Manager related to Project.

Isgec Heavy Engineering Interview FAQs

What are the top questions asked in Isgec Heavy Engineering Document Controller interview?

Some of the top questions asked at the Isgec Heavy Engineering Document Controller interview -

  1. How many Engineering Documents will be process if you handle EPC proje...read more
  2. What is the process of Engineering Drawings process submission to Client Step b...read more
  3. What is the role of Document Controller in Multinational EPC companies...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 427 Interviews
Thermax Limited Interview Questions
4.2
 • 238 Interviews
Cummins Interview Questions
4.3
 • 230 Interviews
Tata Power Interview Questions
3.9
 • 160 Interviews
Voltas Interview Questions
4.0
 • 126 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
Atlas Copco Interview Questions
4.2
 • 77 Interviews
View all
Isgec Heavy Engineering Document Controller Salary
based on 15 salaries
₹4.2 L/yr - ₹9 L/yr
31% more than the average Document Controller Salary in India
View more details

Isgec Heavy Engineering Document Controller Reviews and Ratings

based on 2 reviews

3.8/5

Rating in categories

3.0

Skill development

3.0

Work-life balance

4.0

Salary

3.0

Job security

2.0

Company culture

3.0

Promotions

3.0

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
318 salaries
unlock blur

₹7 L/yr - ₹16.7 L/yr

Senior Engineer
282 salaries
unlock blur

₹4.5 L/yr - ₹13.2 L/yr

Deputy Manager
190 salaries
unlock blur

₹9.5 L/yr - ₹21 L/yr

Manager
149 salaries
unlock blur

₹8 L/yr - ₹24 L/yr

Engineer
145 salaries
unlock blur

₹3.5 L/yr - ₹9 L/yr

Explore more salaries
Compare Isgec Heavy Engineering with

Thermax Limited

4.2
Compare

BHEL

4.1
Compare

Larsen & Toubro Limited

4.0
Compare

Tata Power

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview