i
Isgec Heavy Engineering
Filter interviews by
I applied via Recruitment Consultant and was interviewed before Jan 2021. There was 1 interview round.
The number of engineering documents processed in an EPC project varies depending on the project size and complexity.
The number of engineering documents processed in an EPC project can range from a few hundred to several thousand.
It depends on the scope of the project, the number of disciplines involved, and the duration of the project.
For example, a small EPC project may involve processing around 500 engineering docume...
The role of a Document Controller in Multinational EPC companies is to manage and control all project documents.
Maintain document control procedures
Ensure all documents are properly formatted and stored
Track and manage document revisions
Coordinate with project teams to ensure timely submission of documents
Ensure compliance with company and industry standards
Provide support during audits and inspections
The first step of Engineering and Vendor Document process is to identify the required documents and their formats.
Identify the required documents for the project
Determine the format and standard for each document
Create a document register to track all documents
Establish a document control system to manage the documents
Communicate the document requirements to vendors and contractors
Vendor documents are managed through a process that involves review, approval, and tracking.
Vendor documents are received and reviewed for completeness and accuracy.
Documents are then approved by the relevant parties, such as the project manager or engineering team.
Once approved, documents are tracked and stored in a central repository for easy access and retrieval.
Examples of vendor documents include equipment specifi...
The process of submitting engineering drawings to clients involves several steps.
Review the drawings for accuracy and completeness
Obtain approval from the relevant parties
Compile the drawings into a package
Submit the package to the client
Track the progress of the submission and follow up as necessary
TBE stands for Technical Bid Evaluation and TQ stands for Technical Query. They are used in EPC projects for vendor selection and clarification of technical issues.
TBE is a process of evaluating technical bids submitted by vendors to ensure that they meet the project requirements.
TQ is a formal request for clarification on technical issues related to the project.
TBE and TQ are important tools for vendor selection and c...
I appeared for an interview in Jan 2025.
Maintenance work process involves planning, scheduling, executing, and documenting maintenance activities to ensure equipment reliability and efficiency.
Maintenance work process starts with identifying maintenance needs through inspections, equipment history, and predictive maintenance techniques.
Once maintenance needs are identified, a maintenance plan is created outlining the scope of work, required resources, and ti...
I appeared for an interview in Feb 2025, where I was asked the following questions.
I applied via Naukri.com and was interviewed in Dec 2024. There were 2 interview rounds.
Managing local people and IR issues involves understanding local culture, laws, and communication styles.
Develop strong relationships with local leaders and stakeholders
Ensure compliance with local labor laws and regulations
Implement effective communication strategies tailored to local culture
Address and resolve conflicts promptly and fairly
Provide training and development opportunities to empower local employees
Establ...
How to handle the site for different and remote environment.
Isgec Heavy Engineering interview questions for popular designations
I applied via AmbitionBox and was interviewed in Nov 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jul 2024. There were 3 interview rounds.
The candidate should have a strong understanding of manufacturing and planning processes.
Knowledge of lean manufacturing principles
Experience with production scheduling and capacity planning
Understanding of supply chain management
Ability to optimize processes for efficiency and cost-effectiveness
I plan to continue advancing my skills in engineering through further education and certifications, as well as taking on more leadership roles within the field.
Pursuing a master's degree in engineering to deepen my knowledge and expertise
Obtaining professional certifications such as PMP or Six Sigma to enhance my skill set
Seeking opportunities to lead projects and teams to develop my leadership abilities
Staying updated...
Ensuring retention by creating a supportive work environment for employees and their families.
Offering flexible work hours and remote work options to accommodate family needs
Providing comprehensive health insurance and wellness programs for employees and their families
Organizing family-friendly events and activities to promote work-life balance
Offering competitive salaries and benefits to attract and retain top talent
I appeared for an interview before Sep 2022.
A CHP Operator is responsible for operating and maintaining Combined Heat and Power systems to generate electricity and heat.
Operates and monitors Combined Heat and Power systems
Performs routine maintenance and repairs on equipment
Ensures efficient and safe operation of the system
May troubleshoot and resolve issues with the system
Works to maximize energy efficiency and cost savings
The main role of a CHP operator is to monitor and control the Combined Heat and Power system to ensure efficient energy production.
Monitor and control the CHP system to optimize energy production
Perform routine maintenance and inspections on equipment
Troubleshoot and resolve any issues that may arise
Coordinate with other team members to ensure smooth operation
Ensure compliance with safety regulations and protocols
The erection sequence of ESP involves several steps to ensure proper installation and functioning.
1. Prepare the foundation for the ESP unit.
2. Install the support structure for the ESP.
3. Assemble the ESP components such as the casing, electrodes, and rapping system.
4. Connect the necessary electrical and mechanical components.
5. Test the ESP system for proper functioning before commissioning.
6. Commission the ESP sys...
Various ESP materials suppliers include Schlumberger, Baker Hughes, Halliburton, Weatherford, and National Oilwell Varco.
Schlumberger
Baker Hughes
Halliburton
Weatherford
National Oilwell Varco
I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.
As Deputy Manager, my job profile involves assisting the manager in overseeing daily operations, managing staff, and ensuring goals are met.
Assist manager in daily operations
Manage staff and delegate tasks
Ensure goals and targets are met
Provide support and guidance to team members
Handle customer complaints and issues
Prepare reports and analyze data
I have a strong track record of leadership, problem-solving, and team collaboration.
I have successfully managed a team of 20 employees in my previous role, leading to a 15% increase in productivity.
I excel at problem-solving and have implemented several cost-saving initiatives that have positively impacted the bottom line.
I have a proven track record of collaborating with cross-functional teams to achieve common goals
I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.
Some of the top questions asked at the Isgec Heavy Engineering interview -
The duration of Isgec Heavy Engineering interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 147 interviews
Interview experience
based on 1.4k reviews
Rating in categories
Assistant Manager
320
salaries
| ₹7.5 L/yr - ₹16.7 L/yr |
Senior Engineer
281
salaries
| ₹4.5 L/yr - ₹14 L/yr |
Deputy Manager
191
salaries
| ₹8.5 L/yr - ₹22 L/yr |
Engineer
169
salaries
| ₹3.1 L/yr - ₹9 L/yr |
Assistant Engineer
155
salaries
| ₹2.7 L/yr - ₹8.5 L/yr |
Thermax Limited
ABB
Kirloskar Oil Engines
Kirloskar Brothers