I applied via Recruitment Consultant and was interviewed before Jan 2021. There was 1 interview round.
The number of engineering documents processed in an EPC project varies depending on the project size and complexity.
The number of engineering documents processed in an EPC project can range from a few hundred to several thousand.
It depends on the scope of the project, the number of disciplines involved, and the duration of the project.
For example, a small EPC project may involve processing around 500 engineering docume...
The role of a Document Controller in Multinational EPC companies is to manage and control all project documents.
Maintain document control procedures
Ensure all documents are properly formatted and stored
Track and manage document revisions
Coordinate with project teams to ensure timely submission of documents
Ensure compliance with company and industry standards
Provide support during audits and inspections
The first step of Engineering and Vendor Document process is to identify the required documents and their formats.
Identify the required documents for the project
Determine the format and standard for each document
Create a document register to track all documents
Establish a document control system to manage the documents
Communicate the document requirements to vendors and contractors
Vendor documents are managed through a process that involves review, approval, and tracking.
Vendor documents are received and reviewed for completeness and accuracy.
Documents are then approved by the relevant parties, such as the project manager or engineering team.
Once approved, documents are tracked and stored in a central repository for easy access and retrieval.
Examples of vendor documents include equipment specifi...
The process of submitting engineering drawings to clients involves several steps.
Review the drawings for accuracy and completeness
Obtain approval from the relevant parties
Compile the drawings into a package
Submit the package to the client
Track the progress of the submission and follow up as necessary
TBE stands for Technical Bid Evaluation and TQ stands for Technical Query. They are used in EPC projects for vendor selection and clarification of technical issues.
TBE is a process of evaluating technical bids submitted by vendors to ensure that they meet the project requirements.
TQ is a formal request for clarification on technical issues related to the project.
TBE and TQ are important tools for vendor selection and c...
Top trending discussions
posted on 12 Oct 2020
I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.
posted on 18 Jan 2020
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Maintain elevation of underground piping by using level instruments and proper installation techniques.
Use a level instrument to check the elevation of the piping during installation.
Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.
Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.
Consider using supports o...
In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.
Managed a team of employees and delegated tasks effectively
Handled customer complaints and resolved issues in a timely manner
Created and implemented strategies to improve efficiency and productivity
Collaborated with other departments to achieve company goals
Conducted performanc
Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.
Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.
Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.
Cast iron electrodes have a high nickel content to prevent cracking.
Aluminum electrodes have a special coating ...
posted on 11 May 2018
I was interviewed before Mar 2020.
posted on 25 Mar 2022
I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.
posted on 23 Oct 2021
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
posted on 2 May 2021
posted on 5 Mar 2019
I applied via Approached by Company and was interviewed before Mar 2018. There was 1 interview round.
posted on 10 May 2022
I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.
Piping code and welder qualifications test
Piping code refers to the set of standards and regulations that govern the design, fabrication, and inspection of piping systems.
Welder qualifications test is a process of testing and certifying welders to ensure that they have the necessary skills and knowledge to perform welding tasks safely and effectively.
Both piping code and welder qualifications test are important in ensu...
Some of the top questions asked at the Isgec Heavy Engineering Document Controller interview -
based on 2 reviews
Rating in categories
Assistant Manager
323
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
296
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
188
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
172
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
141
salaries
| ₹0 L/yr - ₹0 L/yr |
Thermax Limited
BHEL
Larsen & Toubro Limited
Tata Power