The erection sequence of ESP involves several steps to ensure proper installation and functioning.
1. Prepare the foundation for the ESP unit.
2. Install the support structure for the ESP.
3. Assemble the ESP components such as the casing, electrodes, and rapping system.
4. Connect the necessary electrical and mechanical components.
5. Test the ESP system for proper functioning before commissioning.
6. Commission the ESP sys...
Various ESP materials suppliers include Schlumberger, Baker Hughes, Halliburton, Weatherford, and National Oilwell Varco.
Schlumberger
Baker Hughes
Halliburton
Weatherford
National Oilwell Varco
I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.
I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.
I applied via Referral
Isgec Heavy Engineering interview questions for designations
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
The process of erection of duct involves planning, fabrication, transportation, installation, and testing.
Planning involves determining the layout, size, and material of the ducts.
Fabrication includes cutting, bending, and assembling the ducts according to the design.
Transportation is the movement of fabricated ducts to the installation site.
Installation involves positioning and connecting the ducts to the HVAC system.
...
The code followed for the fabrication of steel structure materials is typically based on industry standards and regulations.
The fabrication of steel structures is typically governed by codes such as the American Institute of Steel Construction (AISC) Code of Standard Practice.
Other codes that may be followed include the American Welding Society (AWS) D1.1 Structural Welding Code - Steel.
Fabrication processes must also ...
The erection sequence of a steel structure involves planning and executing the assembly of components in a specific order to ensure safety and stability.
Start by assembling the foundation and anchor bolts.
Next, erect the columns and connect them to the foundation.
Then, install the beams and trusses to form the framework.
After that, add the bracing and diagonal members for stability.
Finally, complete the structure by ad...
I applied via Recruitment Consulltant and was interviewed in Oct 2020. There were 5 interview rounds.
I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.
Top trending discussions
I applied via Company Website and was interviewed in May 2023. There were 2 interview rounds.
Equipment used in steam turbine include turbine blades, nozzles, casing, rotor, bearings, and governor.
Turbine blades: convert steam energy into mechanical energy
Nozzles: control the flow of steam into the turbine
Casing: contains and directs the steam flow through the turbine
Rotor: connected to the turbine blades and rotates to generate power
Bearings: support the rotor and reduce friction
Governor: regulates the speed o
Woodward 505 is a versatile control system used in industrial applications.
The Woodward 505 is a widely used control system in industries such as power generation, oil and gas, and marine.
It offers advanced features like PID control, sequencing, and communication capabilities.
The Woodward 505 is known for its reliability and robustness in harsh operating environments.
It can be easily integrated with various types of se
The Honeywell DCS (Distributed Control System) is a modular system consisting of controllers, I/O modules, and operator stations.
Consists of controllers, I/O modules, and operator stations
Uses a network to communicate between components
Allows for centralized control and monitoring of processes
Supports various communication protocols such as Modbus, OPC, etc.
Example: Honeywell Experion PKS
PID stands for Proportional-Integral-Derivative, a control loop feedback mechanism used in engineering.
PID is a control algorithm that calculates an error value as the difference between a desired setpoint and a measured process variable.
Proportional (P) control responds to the current error value.
Integral (I) control accumulates past errors to correct the present error.
Derivative (D) control predicts future errors bas...
To assign a new channel in Honeywell DCS, you need to access the configuration software and follow the steps to add the channel.
Access the Honeywell DCS configuration software
Navigate to the channel configuration section
Add a new channel by specifying the channel number, type, and other relevant parameters
Save the changes and verify the new channel is successfully assigned
Interlocks and permissives are safety mechanisms in place to prevent unsafe operation of boiler and turbine systems.
Interlocks prevent certain actions from taking place unless specific conditions are met
Permissives allow certain actions to take place only if specific conditions are met
Example of interlock: Boiler feed pump interlock prevents the boiler from starting unless the feed pump is running
Example of permissive:...
posted on 19 Oct 2023
Interview experience
based on 74 reviews
Rating in categories
Assistant Manager
309
salaries
| ₹7 L/yr - ₹16.7 L/yr |
Senior Engineer
302
salaries
| ₹4.5 L/yr - ₹14 L/yr |
Deputy Manager
192
salaries
| ₹8.5 L/yr - ₹21.5 L/yr |
Engineer
173
salaries
| ₹3.5 L/yr - ₹10 L/yr |
Manager
147
salaries
| ₹8 L/yr - ₹24 L/yr |
Thermax Limited
BHEL
Larsen & Toubro Limited
Tata Power