Isgec Heavy Engineering Assistant Construction Manager Interview Questions, Process, and Tips

Updated 17 Sep 2024

Isgec Heavy Engineering Assistant Construction Manager Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. HOW MANY TYPES OF BOILER
  • Ans. 

    There are two main types of boilers: fire tube boilers and water tube boilers.

    • Fire tube boilers have hot gases passing through the tubes which are surrounded by water. Examples include Scotch marine boilers.

    • Water tube boilers have water flowing inside the tubes while hot gases surround them. Examples include Babcock and Wilcox boilers.

  • Answered by AI
  • Q2. WELDING OF T93 JOINTS
  • Ans. 

    Welding of T93 joints requires specialized techniques and equipment to ensure a strong and durable bond.

    • T93 is a high-strength steel alloy commonly used in construction for its excellent mechanical properties.

    • Welding T93 joints requires preheating to reduce the risk of cracking and post-weld heat treatment for optimal strength.

    • Specialized welding techniques such as TIG welding or submerged arc welding are often used fo...

  • Answered by AI
  • Q3. SEQUENCE OF ERECTION OF BOILER
  • Ans. 

    The sequence of erection of a boiler involves several steps to ensure proper installation and functionality.

    • 1. Foundation preparation and installation of base plates

    • 2. Erection of boiler structure and setting of walls

    • 3. Installation of boiler tubes and headers

    • 4. Mounting of boiler accessories such as safety valves and gauges

    • 5. Connection of piping and wiring for steam and water supply

    • 6. Testing and commissioning of the

  • Answered by AI
  • Q4. SEQUENCE OF ERECTION OF ESP
  • Ans. 

    The sequence of erection of ESP involves several steps to ensure proper installation and functioning.

    • 1. Site preparation including foundation construction and leveling of the ground.

    • 2. Installation of support structures such as columns and beams.

    • 3. Assembly of the ESP components including the casing, electrodes, and collecting plates.

    • 4. Connection of electrical wiring and control systems.

    • 5. Testing and commissioning to...

  • Answered by AI
  • Q5. BAISIC KNOWALAGE OF ROTARY PARTS

Interview Preparation Tips

Interview preparation tips for other job seekers - BE CONFIDENT

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Efficiency calculation of fired boilers.
  • Ans. 

    Efficiency of fired boilers can be calculated by dividing the energy output by the energy input.

    • Efficiency = (Energy output / Energy input) * 100%

    • Energy output can be measured in terms of steam production or heat transfer to water

    • Energy input is the fuel energy input to the boiler

    • Efficiency can be improved by optimizing combustion, insulation, and heat recovery systems

  • Answered by AI
  • Q2. Heat rate of turbine.
  • Ans. 

    The heat rate of a turbine is a measure of how efficiently it converts fuel into electricity.

    • Heat rate is typically measured in British thermal units (BTUs) per kilowatt-hour (kWh).

    • A lower heat rate indicates higher efficiency, as less fuel is needed to generate the same amount of electricity.

    • Factors affecting heat rate include turbine design, operating conditions, and maintenance practices.

    • For example, a combined cycl...

  • Answered by AI
  • Q3. Fire tube and water tube boilers
  • Q4. Bi drum boiler erection sequence
  • Ans. 

    The erection sequence of a bi drum boiler involves several key steps to ensure proper installation and functionality.

    • Start by preparing the foundation for the boiler to ensure stability and support.

    • Next, assemble the lower drum and connect it to the foundation securely.

    • Then, install the upper drum and connect it to the lower drum using appropriate fittings.

    • After that, install the boiler tubes and headers to facilitate ...

  • Answered by AI
  • Q5. Safety interlock of fired boilers.
  • Ans. 

    Safety interlock of fired boilers is a crucial system that ensures safe operation by preventing unsafe conditions.

    • Safety interlock system is designed to shut down the boiler if unsafe conditions are detected, such as low water level or high pressure.

    • Interlocks may include sensors, alarms, and automatic shutdown mechanisms.

    • Regular maintenance and testing of safety interlock systems are essential to ensure they function ...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Thermax Limited Senior Construction Manager interview:
  • IBR regulations
Interview preparation tips for other job seekers - Be specific and true to the resume submitted.

Isgec Heavy Engineering Interview FAQs

How many rounds are there in Isgec Heavy Engineering Assistant Construction Manager interview?
Isgec Heavy Engineering interview process usually has 1 rounds. The most common rounds in the Isgec Heavy Engineering interview process are Technical.
What are the top questions asked in Isgec Heavy Engineering Assistant Construction Manager interview?

Some of the top questions asked at the Isgec Heavy Engineering Assistant Construction Manager interview -

  1. HOW MANY TYPES OF BOI...read more
  2. WELDING OF T93 JOI...read more
  3. SEQUENCE OF ERECTION OF BOI...read more

Tell us how to improve this page.

Isgec Heavy Engineering Assistant Construction Manager Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 429 Interviews
Thermax Limited Interview Questions
4.2
 • 243 Interviews
Cummins Interview Questions
4.3
 • 230 Interviews
Tata Power Interview Questions
3.9
 • 160 Interviews
Voltas Interview Questions
4.0
 • 128 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
Atlas Copco Interview Questions
4.2
 • 78 Interviews
View all
Isgec Heavy Engineering Assistant Construction Manager Salary
based on 4 salaries
₹14.5 L/yr - ₹18.2 L/yr
44% more than the average Assistant Construction Manager Salary in India
View more details
Assistant Manager
322 salaries
unlock blur

₹7.5 L/yr - ₹16.7 L/yr

Senior Engineer
285 salaries
unlock blur

₹4.5 L/yr - ₹14 L/yr

Deputy Manager
191 salaries
unlock blur

₹8.5 L/yr - ₹21 L/yr

Engineer
173 salaries
unlock blur

₹3.1 L/yr - ₹9 L/yr

Manager
152 salaries
unlock blur

₹8 L/yr - ₹24 L/yr

Explore more salaries
Compare Isgec Heavy Engineering with

Thermax Limited

4.2
Compare

BHEL

4.1
Compare

Larsen & Toubro Limited

4.0
Compare

Tata Power

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview