Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Isgec Heavy Engineering Team. If you also belong to the team, you can get access from here

Isgec Heavy Engineering Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Isgec Heavy Engineering Assistant Construction Manager Interview Questions, Process, and Tips

Updated 17 Sep 2024

Isgec Heavy Engineering Assistant Construction Manager Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. HOW MANY TYPES OF BOILER
  • Ans. 

    There are two main types of boilers: fire tube boilers and water tube boilers.

    • Fire tube boilers have hot gases passing through the tubes which are surrounded by water. Examples include Scotch marine boilers.

    • Water tube boilers have water flowing inside the tubes while hot gases surround them. Examples include Babcock and Wilcox boilers.

  • Answered by AI
  • Q2. WELDING OF T93 JOINTS
  • Ans. 

    Welding of T93 joints requires specialized techniques and equipment to ensure a strong and durable bond.

    • T93 is a high-strength steel alloy commonly used in construction for its excellent mechanical properties.

    • Welding T93 joints requires preheating to reduce the risk of cracking and post-weld heat treatment for optimal strength.

    • Specialized welding techniques such as TIG welding or submerged arc welding are often used fo...

  • Answered by AI
  • Q3. SEQUENCE OF ERECTION OF BOILER
  • Ans. 

    The sequence of erection of a boiler involves several steps to ensure proper installation and functionality.

    • 1. Foundation preparation and installation of base plates

    • 2. Erection of boiler structure and setting of walls

    • 3. Installation of boiler tubes and headers

    • 4. Mounting of boiler accessories such as safety valves and gauges

    • 5. Connection of piping and wiring for steam and water supply

    • 6. Testing and commissioning of the

  • Answered by AI
  • Q4. SEQUENCE OF ERECTION OF ESP
  • Ans. 

    The sequence of erection of ESP involves several steps to ensure proper installation and functioning.

    • 1. Site preparation including foundation construction and leveling of the ground.

    • 2. Installation of support structures such as columns and beams.

    • 3. Assembly of the ESP components including the casing, electrodes, and collecting plates.

    • 4. Connection of electrical wiring and control systems.

    • 5. Testing and commissioning to...

  • Answered by AI
  • Q5. BAISIC KNOWALAGE OF ROTARY PARTS

Interview Preparation Tips

Interview preparation tips for other job seekers - BE CONFIDENT

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. All were professional questions wrt to their department

Interview Preparation Tips

Interview preparation tips for other job seekers - It was an virtual interview, with panel board members, they test our professional standard and expect honest answers.

I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Drum level like single element and three elements

Interview Preparation Tips

Interview preparation tips for other job seekers - Company is ok anyone can join this company, all the thing that are systematicg

Interview Questionnaire 

1 Question

  • Q1. Norms of your company

Interview Preparation Tips

Interview preparation tips for other job seekers - We are well versed in TQM and TPM
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Maths reasoning quantitive aptitude & general knowledge questions

I appeared for an interview in Sep 2021.

Round 1 - Technical 

(1 Question)

  • Q1. Related to my resume only
Round 2 - Technical 

(1 Question)

  • Q1. Basic questions from your resume
Round 3 - HR 

(3 Questions)

  • Q1. Why are you looking for a change?
  • Q2. What are your strengths and weaknesses?
  • Q3. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare your resume well with examples
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 
Round 3 - HR 

(6 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Why should we hire you?
  • Q4. Why are you looking for a change?
  • Q5. What are your strengths and weaknesses?
  • Q6. Tell me about yourself.
Round 4 - Group Discussion 
Pro Tip by AmbitionBox:
Don’t treat group discussions as an argument. Group discussion is about reaching a meaningful conclusion.
View all tips

Interview Preparation Tips

Interview preparation tips for other job seekers - Should be preparing properly, CV should be updated
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Regioning, Maths, Genral Knowedge, engine

Round 3 - Technical 

(1 Question)

  • Q1. Earthmoving Machines, NPS, MTTR, Parts availity, Service revanue increase after sales the product , Strenth of Field, Hydraulics and some electricals etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - what is your weakness. ans - you can converted from weakness to possitive, like as Angery man, etc.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About the company, about my work and about the machine I worked on. Also GD & T
Round 3 - HR 

(1 Question)

  • Q1. Salary deduction.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Salary expectation
  • Q2. Ask about of Last company Experience

Isgec Heavy Engineering Interview FAQs

How many rounds are there in Isgec Heavy Engineering Assistant Construction Manager interview?
Isgec Heavy Engineering interview process usually has 1 rounds. The most common rounds in the Isgec Heavy Engineering interview process are Technical.
What are the top questions asked in Isgec Heavy Engineering Assistant Construction Manager interview?

Some of the top questions asked at the Isgec Heavy Engineering Assistant Construction Manager interview -

  1. HOW MANY TYPES OF BOI...read more
  2. WELDING OF T93 JOI...read more
  3. SEQUENCE OF ERECTION OF BOI...read more

Tell us how to improve this page.

Isgec Heavy Engineering Assistant Construction Manager Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Thermax Limited Interview Questions
4.1
 • 258 Interviews
ABB Interview Questions
4.1
 • 241 Interviews
Atlas Copco Interview Questions
4.2
 • 79 Interviews
Timken Interview Questions
4.0
 • 47 Interviews
View all
Isgec Heavy Engineering Assistant Construction Manager Salary
based on 4 salaries
₹14.5 L/yr - ₹18.2 L/yr
43% more than the average Assistant Construction Manager Salary in India
View more details
Assistant Manager
320 salaries
unlock blur

₹7.5 L/yr - ₹16.7 L/yr

Senior Engineer
280 salaries
unlock blur

₹4.5 L/yr - ₹14 L/yr

Deputy Manager
191 salaries
unlock blur

₹8.5 L/yr - ₹22 L/yr

Assistant Engineer
155 salaries
unlock blur

₹2.7 L/yr - ₹8.5 L/yr

Manager
142 salaries
unlock blur

₹8 L/yr - ₹24 L/yr

Explore more salaries
Compare Isgec Heavy Engineering with

Thermax Limited

4.1
Compare

ABB

4.1
Compare

Kirloskar Oil Engines

4.1
Compare

Kirloskar Brothers

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview