One and a half breaker scheme is a protection scheme used in power systems to provide selective tripping of faulty sections.
It involves using one full circuit breaker and one half circuit breaker to protect a section of the power system.
The full circuit breaker is used to protect the main section while the half circuit breaker is used to protect the adjacent section.
If a fault occurs in the adjacent section, the half c...
Steady state stability refers to the ability of a power system to maintain a stable operating condition under normal operating conditions.
Steady state stability is important for ensuring the reliability of the power system.
It is affected by factors such as load demand, generator output, and transmission line capacity.
If the power system is not in steady state stability, it can lead to voltage instability, frequency ins...
Protection measures are necessary to ensure safety and reliability of distribution systems.
Protection devices such as fuses, circuit breakers, and relays are used to detect and isolate faults.
Grounding systems are used to protect against electrical shock and lightning strikes.
Backup power sources such as generators and batteries are used to ensure continuity of service.
Regular maintenance and testing of protection syst...
Commercial meters measure energy consumption, while smart meters provide real-time data and enable remote monitoring.
Commercial meters measure energy consumption in kilowatt-hours (kWh).
Smart meters provide real-time data on energy usage and enable remote monitoring.
Smart meters can also detect power outages and help utilities quickly restore service.
Smart meters can provide detailed information on energy usage pattern...
I applied via Recruitment Consulltant and was interviewed before Feb 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Feb 2021. There were 5 interview rounds.
TP Central Odisha Distribution interview questions for popular designations
I applied via Company Website and was interviewed before Feb 2021. There were 2 interview rounds.
Get interview-ready with Top TP Central Odisha Distribution Interview Questions
I applied via Company Website and was interviewed in Dec 2020. There was 1 interview round.
I applied via Company Website and was interviewed before Sep 2020. There were 3 interview rounds.
A smart meter is an electronic device that records and reports energy consumption in real-time.
Smart meters are used to monitor and manage energy usage in homes and businesses.
They can communicate with utility companies to provide accurate billing and help reduce energy waste.
Smart meters can also provide consumers with real-time information about their energy usage and costs.
Examples of smart meter technologies includ...
HTTV meter stands for High Temperature, High Voltage meter used to measure high voltage and temperature in electrical systems.
HTTV meter is used to measure high voltage and temperature in electrical systems
It is commonly used in power plants and electrical substations
The meter can measure voltage up to 1000V and temperature up to 1000°C
It is designed to withstand high temperatures and voltages to ensure accurate readin...
I applied via Referral and was interviewed in Jan 2020. There were 4 interview rounds.
Some of the top questions asked at the TP Central Odisha Distribution interview -
based on 27 interviews
Interview experience
based on 213 reviews
Rating in categories
Lead Engineer
98
salaries
| ₹0 L/yr - ₹0 L/yr |
Team Lead
97
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Officer
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate Lead
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Officer
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Adani Electricity
Tata Power Delhi Distribution
CESC
Bses Rajdhani Power