Filter interviews by
I applied via Walk-in and was interviewed in Feb 2023. There were 3 interview rounds.
Operation and maintenance of 33kv / 11kv /.4 Line with safety in mind is crucial for site engineers.
Regular inspection and testing of equipment to ensure proper functioning
Implementing safety protocols and procedures to prevent accidents
Training staff on safety measures and emergency response
Keeping detailed records of maintenance activities and repairs
Collaborating with other departments to coordinate maintenance sche
I applied via Referral and was interviewed in Aug 2022. There were 3 interview rounds.
What is severity. What is main geat durty .what type of Register maintain at main geat
The question is about the various registers used in main gate security management.
There are different registers used for different purposes such as inword, outword, visitor, vehicle movement, company material non-returned, employee movement, and contractor material movement.
These registers help in maintaining the security and safety of the premises.
They also help in keeping track of the movement of people and materials...
I applied via Company Website and was interviewed in Jun 2022. There were 2 interview rounds.
Explanation of tan delta test and winding test in transformers
Tan delta test measures the insulation quality of transformer windings
It is performed to detect any insulation defects or aging in the transformer
The value of tan delta should be low, ideally less than 0.5%
Winding test is performed to check the integrity of transformer windings
It helps to detect any short circuits or open circuits in the winding
Manufactured ...
TP Central Odisha Distribution interview questions for popular designations
Simple not easy but we can do it.
Say positive with confidence not argument please.
Get interview-ready with Top TP Central Odisha Distribution Interview Questions
I applied via Walk-in and was interviewed in Jul 2022. There were 2 interview rounds.
I applied via Newspaper Ad and was interviewed before Oct 2022. There were 2 interview rounds.
Normal aptitude online exam will be conducted.
AT&C losses refer to Aggregate Technical and Commercial losses in the electricity distribution system.
AT&C losses include technical losses (due to resistance in wires, transformers, etc.) and commercial losses (due to theft, billing errors, etc.)
These losses are expressed as a percentage of the total energy input into the distribution system.
Reducing AT&C losses is crucial for improving the financial health of distribu...
An energy meter is connected by wiring it to the electrical circuit of a building or facility.
An energy meter is typically connected to the main electrical panel of a building.
The meter is wired in series with the main power supply to measure the amount of electricity consumed.
The connection must be done by a qualified electrician to ensure safety and accuracy.
Some energy meters also have the capability to connect wire...
Electricity bills are calculated based on the amount of electricity consumed, the rate per unit, and any additional charges or discounts.
Electricity consumption is measured in kilowatt-hours (kWh)
The rate per unit is determined by the electricity provider
Additional charges may include taxes, surcharges, and service fees
Discounts may be applied for prompt payment or energy-saving practices
Copper loss refers to the power loss in an electrical machine due to the resistance of copper windings.
Copper loss is also known as I^2R loss, where I is the current flowing through the winding and R is the resistance of the winding.
It is a major factor in determining the efficiency of electrical machines.
Copper loss can be reduced by using materials with lower resistance or by increasing the size of the conductors.
For...
I applied via Company Website and was interviewed before Oct 2022. There were 5 interview rounds.
20 questions in 20 mins
The first 5 things I will notice during an inspection of a distribution network
Overall layout and organization of the distribution center
Condition of equipment and machinery used in the distribution process
Inventory levels and storage capacity
Safety measures and protocols in place
Efficiency of the distribution process and any bottlenecks
Different types of losses in a LT Network include copper losses, iron losses, and stray losses.
Copper losses: Occur due to resistance in the conductors, leading to heat dissipation.
Iron losses: Result from hysteresis and eddy current losses in the transformer core.
Stray losses: Arise from leakage flux and other inefficiencies in the network.
Examples: A transformer experiencing iron losses will heat up due to hysteresis...
I applied via Company Website
I applied via Company Website and was interviewed before Jan 2022. There were 4 interview rounds.
General Technical Written Test about Conductor's, Electricity Distribution, Underground Cable.
IS Code for Transformers is IS 2026
IS 2026 is the Indian Standard code for power transformers
It specifies the requirements and tests for power transformers
IS 2026 covers transformers with a voltage rating of up to 36 kV
The code also includes guidelines for transformer installation and maintenance
Some of the top questions asked at the TP Central Odisha Distribution interview -
based on 27 interviews
Interview experience
based on 213 reviews
Rating in categories
Lead Engineer
98
salaries
| ₹0 L/yr - ₹0 L/yr |
Team Lead
97
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Officer
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate Lead
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Officer
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Adani Electricity
Tata Power Delhi Distribution
CESC
Bses Rajdhani Power