I applied via Walk-in and was interviewed in Feb 2023. There were 3 interview rounds.
Operation and maintenance of 33kv / 11kv /.4 Line with safety in mind is crucial for site engineers.
Regular inspection and testing of equipment to ensure proper functioning
Implementing safety protocols and procedures to prevent accidents
Training staff on safety measures and emergency response
Keeping detailed records of maintenance activities and repairs
Collaborating with other departments to coordinate maintenance sche
Top trending discussions
I applied via Approached by Company and was interviewed in Jul 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Jan 2024. There were 3 interview rounds.
Nature of work done, team handling experience, communication, etc.
Introduction
I applied via Campus Placement and was interviewed before Jun 2023. There was 1 interview round.
A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.
Transformers are used to increase or decrease the voltage in electrical circuits.
They consist of two coils of wire, known as the primary and secondary coils, wrapped around a core.
Examples of transformers include power transformers used in electrical substations and distribution transfor...
posted on 25 Apr 2024
I applied via campus placement at LD College of Engineering, Ahmedabad and was interviewed before Apr 2023. There were 2 interview rounds.
Quantitative and Electrical Engineering Questions
The power system is a network of electrical components used to generate, transmit, and distribute electricity.
Includes power generation, transmission, distribution, and utilization
Consists of power plants, transformers, substations, transmission lines, and distribution lines
Involves AC and DC power systems
Utilizes various protection and control systems to ensure reliability and safety
Examples: hydroelectric power syste...
Transformer type can be identified by checking the winding configuration, core type, and cooling method.
Check the winding configuration - transformers can be either step-up, step-down, or isolation transformers.
Identify the core type - transformers can have either core-type or shell-type construction.
Determine the cooling method - transformers can be air-cooled, oil-cooled, or water-cooled.
Check for any markings or lab
Types of cables include coaxial, twisted pair, fiber optic, and ribbon cables.
Coaxial cable: used for cable television and internet connections
Twisted pair cable: commonly used for Ethernet networks
Fiber optic cable: transmits data using light signals
Ribbon cable: used for internal computer connections
posted on 30 Dec 2021
Renewable energy is energy that is derived from natural sources and can be replenished or regenerated over time.
Renewable energy is obtained from sources that are naturally replenished, such as sunlight, wind, water, and geothermal heat.
Unlike fossil fuels, which are finite and non-renewable, renewable energy sources are virtually inexhaustible.
Renewable energy is considered environmentally friendly as it produces litt...
Yes, there are codes for batching plant, sieve analysis, compressive strength, and soil tests.
The codes for batching plant include ACI 304R-00: Guide for Measuring, Mixing, Transporting, and Placing Concrete
The codes for sieve analysis include ASTM C136-06: Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates
The codes for compressive strength include ASTM C39/C39M-18: Standard Test Method for Compressi...
I would take immediate action to adjust the mix to meet the required slump.
Check the water content and adjust accordingly
Add plasticizer or superplasticizer to increase slump
Consult with concrete supplier or mix designer for recommendations
Perform slump test on site to ensure desired slump is achieved
Document the adjustments made for quality control purposes
posted on 19 Aug 2022
I applied via Referral and was interviewed before Aug 2021. There was 1 interview round.
Ground mounting work refers to the installation of solar panels or other structures on the ground.
Ground mounting work involves preparing the site for installation, including clearing vegetation and leveling the ground.
It requires digging holes or pouring concrete foundations to secure the mounting structures.
The solar panels or other equipment are then installed on the mounting structures.
Ground mounting work may also...
Interview experience
based on 1 review
Rating in categories
Lead Engineer
102
salaries
| ₹3.5 L/yr - ₹9.8 L/yr |
Team Lead
96
salaries
| ₹5.9 L/yr - ₹15.4 L/yr |
Senior Officer
13
salaries
| ₹3.5 L/yr - ₹6.7 L/yr |
Associate Lead
11
salaries
| ₹8.5 L/yr - ₹12 L/yr |
Commercial Officer
10
salaries
| ₹2.5 L/yr - ₹6 L/yr |
Adani Electricity
Tata Power Delhi Distribution
CESC
Bses Rajdhani Power