Torrent Power Trainee Site Engineer Interview Questions, Process, and Tips

Updated 25 Apr 2024

Torrent Power Trainee Site Engineer Interview Experiences

1 interview found

Trainee Site Engineer Interview Questions & Answers

user image ROHAN MUKESHBHAI HATHI

posted on 25 Apr 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Quantitative and Electrical Engineering Questions

Round 2 - Technical 

(5 Questions)

  • Q1. Power Distribution Questions
  • Q2. Describe entire power system
  • Ans. 

    The power system is a network of electrical components used to generate, transmit, and distribute electricity.

    • Includes power generation, transmission, distribution, and utilization

    • Consists of power plants, transformers, substations, transmission lines, and distribution lines

    • Involves AC and DC power systems

    • Utilizes various protection and control systems to ensure reliability and safety

    • Examples: hydroelectric power syste...

  • Answered by AI
  • Q3. What to do for electrocution?
  • Q4. How to identify transformer type
  • Ans. 

    Transformer type can be identified by checking the winding configuration, core type, and cooling method.

    • Check the winding configuration - transformers can be either step-up, step-down, or isolation transformers.

    • Identify the core type - transformers can have either core-type or shell-type construction.

    • Determine the cooling method - transformers can be air-cooled, oil-cooled, or water-cooled.

    • Check for any markings or lab

  • Answered by AI
  • Q5. What are types of cables
  • Ans. 

    Types of cables include coaxial, twisted pair, fiber optic, and ribbon cables.

    • Coaxial cable: used for cable television and internet connections

    • Twisted pair cable: commonly used for Ethernet networks

    • Fiber optic cable: transmits data using light signals

    • Ribbon cable: used for internal computer connections

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Go prepared on technical details.

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Jan 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Related questions my job
Round 3 - Aptitude Test 
Round 4 - Assignment 

Manager related

Interview Preparation Tips

Interview preparation tips for other job seekers - very good experience in Adani till today

I applied via Recruitment Consultant and was interviewed before Nov 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. What is MEIS
  • Ans. 

    MEIS stands for Merchandise Exports from India Scheme. It is a government initiative to promote exports of goods from India.

    • MEIS is a scheme introduced by the Indian government to incentivize and promote exports of goods from India.

    • Under MEIS, exporters are provided with duty credit scrips which can be used to pay various duties and taxes.

    • The scheme covers a wide range of products and sectors, including agriculture, te...

  • Answered by AI
  • Q2. What is LC in export
  • Ans. 

    LC in export stands for Letter of Credit.

    • LC is a financial document issued by a bank to guarantee payment to the exporter.

    • It provides assurance to the exporter that they will receive payment for the goods or services exported.

    • LC serves as a secure method of payment in international trade.

    • It reduces the risk for both the exporter and the importer.

    • LC includes details such as the amount, terms, and conditions of the payme...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be clam and patient. Be truth while applying for interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2023. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Salary Expectation and experience
Round 2 - Technical 

(1 Question)

  • Q1. Related to load cases
Round 3 - Coding Test 

Asked demo for matlab

Interview experience
4
Good
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I applied via Referral and was interviewed before Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. WTG operation and different between synchronous and asynchronous generator
  • Ans. 

    WTG operation involves converting wind energy into electrical energy. Synchronous generators produce power at a constant speed, while asynchronous generators vary in speed.

    • Wind turbine generators (WTGs) convert wind energy into electrical energy through the use of a rotor and a generator.

    • Synchronous generators produce power at a constant speed that is synchronized with the grid frequency.

    • Asynchronous generators, also k...

  • Answered by AI
  • Q2. Explain as per WTG technology
  • Ans. 

    WTG technology refers to Wind Turbine Generator technology used in renewable energy production.

    • WTG technology involves the use of wind turbines to generate electricity.

    • The turbines are typically placed in locations with high wind speeds to maximize energy production.

    • The generated electricity is then fed into the grid for distribution to consumers.

    • Maintenance of the turbines is crucial to ensure optimal performance and ...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. How to manage 100mw wtg spare
  • Ans. 

    Managing 100mw wtg spare involves efficient planning, inventory management, and proactive maintenance.

    • Develop a comprehensive spare parts inventory management system

    • Regularly assess the condition of spare parts and replace as needed

    • Implement preventive maintenance strategies to minimize downtime

    • Establish strong relationships with suppliers to ensure timely availability of spare parts

    • Monitor and analyze data to identify...

  • Answered by AI

I applied via Naukri.com and was interviewed before Sep 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. As per your experience.
Round 3 - HR 

(1 Question)

  • Q1. Discussion about previous company experience and salary. Salary negotiation.

Interview Preparation Tips

Interview preparation tips for other job seekers - Use your technical knowledge. If you are strong in technical, you can get job. But salary wise they won't accept more than 20% higher from current salary.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. About experience
Round 2 - One-on-one 

(2 Questions)

  • Q1. What type liaison you do at your present organization
  • Ans. 

    I regularly liaise with various departments to ensure smooth operations and communication.

    • Coordinate with sales team to track inventory levels

    • Collaborate with HR for recruitment and training programs

    • Communicate with IT department for software updates

    • Work closely with finance team for budget planning

  • Answered by AI
  • Q2. What is TSR and 30 years record of land.
  • Ans. 

    TSR stands for Town Survey Record, a document maintained by the government that contains details of land ownership and usage over the past 30 years.

    • TSR is a record maintained by the government to keep track of land ownership and usage.

    • It contains information about the history of land transactions, ownership changes, and land use patterns over the past 30 years.

    • TSR is important for verifying land ownership, resolving di...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good interviews and excellent HR response
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Company Website and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Gear box replacement work

Round 2 - One-on-one 

(7 Questions)

  • Q1. Barring checking and replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and belt clamping take-up up and blumber block top cover open and slue Ba...
  • Ans. 

    Belt clamping take-up pulley up and blumber block top cover open and slue Barring remove and new slue Barring checking and replace and bolts nut tightening sure and top cover fixed and bolts nut tightening sure and belt clamping and tackup pulley down and paper work cancelled and conveyer belt running ok

  • Answered by arbindkumarsingh
  • Q2. V-scraper replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and v-scraper remove and new v-scraper replace and bolts nut tigh...
  • Q3. Roller changed and replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and fream number mark and Roller shift and Roller cut change and walked awa...
  • Q4. Motor replace work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and motor remove and new motor replace and bolts nut tightening sure and ...
  • Ans. 

    Old motor bolts nut open and new motor replace and bolts nut tightening sure and Dayal gauge eliminate process ok and paper work cancelled and conveyer belt running ok

  • Answered by arbindkumarsingh
  • Q5. Gear box replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and gear box remove and new gear box replace and bolts nut tighten...
  • Ans. 

    Walked away clean and fresh and bolts nut open and old gear box remove and new gear box replace and bolts nut tightening sure and Dayal gauge eliminate process ok paper work cancelled and conveyer belt running ok

  • Answered by arbindkumarsingh
  • Q6. Conveyer Barring checking and savings greasing work and safety first and all ppes sure and paper work and all pulley checking and savings Greasing sure and paper work cancelled and conveyer belt running o...
  • Q7. Fluid coupling oil replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolt nut open and old clean and fresh and new Oli Pur dropped and bolt...

Interview Preparation Tips

Interview preparation tips for other job seekers - Because of the opportunity for growth and advancement
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Material , cad modelling
  • Q2. Previous projects, welding ndt

Interview Preparation Tips

Interview preparation tips for other job seekers - Welding , ndt , calculations, modeling, nut blots , Assembly

Torrent Power Interview FAQs

How many rounds are there in Torrent Power Trainee Site Engineer interview?
Torrent Power interview process usually has 2 rounds. The most common rounds in the Torrent Power interview process are Aptitude Test and Technical.
What are the top questions asked in Torrent Power Trainee Site Engineer interview?

Some of the top questions asked at the Torrent Power Trainee Site Engineer interview -

  1. How to identify transformer t...read more
  2. What to do for electrocuti...read more
  3. What are types of cab...read more

Tell us how to improve this page.

Torrent Power Trainee Site Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 229 Interviews
Adani Group Interview Questions
3.9
 • 199 Interviews
Tata Power Interview Questions
3.9
 • 164 Interviews
Suzlon Group Interview Questions
4.1
 • 131 Interviews
Eaton Interview Questions
3.9
 • 122 Interviews
Hitachi Energy Interview Questions
4.1
 • 87 Interviews
Wind World Interview Questions
3.9
 • 76 Interviews
Reliance Power Interview Questions
4.1
 • 47 Interviews
Inox Wind Interview Questions
3.7
 • 38 Interviews
View all
Executive Engineer
944 salaries
unlock blur

₹3 L/yr - ₹7.2 L/yr

Executive
835 salaries
unlock blur

₹2.9 L/yr - ₹9.3 L/yr

Assistant Manager
667 salaries
unlock blur

₹4.5 L/yr - ₹15.8 L/yr

Junior Executive
516 salaries
unlock blur

₹1.8 L/yr - ₹4.8 L/yr

Manager
164 salaries
unlock blur

₹9.6 L/yr - ₹27 L/yr

Explore more salaries
Compare Torrent Power with

Suzlon Group

4.1
Compare

Adani Power

3.9
Compare

Adani Group

3.9
Compare

Tata Power

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview