I applied via Company Website and was interviewed before Jan 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

General Technical Written Test about Conductor's, Electricity Distribution, Underground Cable.

Round 3 - Technical 

(4 Questions)

  • Q1. I was interviewed for E&Q Dept. Technical question like Transformer maintenance, Breaker Maintenance.
  • Q2. Breaker, HT switchgear maintenance
  • Q3. IS Code for Transformers
  • Ans. 

    IS Code for Transformers is IS 2026

    • IS 2026 is the Indian Standard code for power transformers

    • It specifies the requirements and tests for power transformers

    • IS 2026 covers transformers with a voltage rating of up to 36 kV

    • The code also includes guidelines for transformer installation and maintenance

  • Answered by AI
  • Q4. Isolator design and maintenance of the same
Round 4 - HR 

(1 Question)

  • Q1. Salary negotiation. 25% hike upon present but variable pay is more.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good organization. Govt holiday culture, 10 to 7 office timing. 2nd & 4th Sat is holiday. Excellent work life balance.

Interview questions from similar companies

Interview Preparation Tips

Interview preparation tips for other job seekers - Conceptual questions only
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Use pscad and make drif tied wind power plan
  • Ans. 

    Using PSCAD to create a grid-tied wind power plant

    • Create a new project in PSCAD

    • Design the wind turbine system with appropriate parameters

    • Connect the wind turbine system to the grid

    • Simulate the system to analyze its performance

    • Optimize the design for maximum efficiency

  • Answered by AI
  • Q2. How many years you will stay in this company?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2023. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Relevant experience
  • Q2. Technical round
  • Q3. Back ground & basic knowledge
Round 2 - HR 

(1 Question)

  • Q1. Regarding salary discussion
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Core technical related your profile
Round 3 - Technical 

(1 Question)

  • Q1. Core technical round
Round 4 - Technical 

(1 Question)

  • Q1. Technical & ask about you thought process
Round 5 - HR 

(1 Question)

  • Q1. About your background & skills

Interview Preparation Tips

Interview preparation tips for other job seekers - no need to impress only express yourself

Because answers to some question, I have not idea, I am not aware about it.

Some are even given in ghis way.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Dec 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. About VFD drives basics of VFD need to be strong
  • Q2. Basics of power electronics need to be strong
  • Q3. Should be ready to travel

Interview Preparation Tips

Interview preparation tips for other job seekers - be strong in fundamentals in power electronics, good communication skills
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Oct 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Why do you want to join Google?
  • Q2. Where do you see yourself in 5 years?
Round 2 - Technical 

(2 Questions)

  • Q1. Explain the differences between monolithic and microarchitectures
  • Ans. 

    Monolithic architecture is a single-tiered software application while microarchitecture is a multi-tiered software application.

    • Monolithic architecture is a single-tiered software application where all components are interconnected and interdependent.

    • Microarchitecture is a multi-tiered software application where components are divided into separate layers, each with its own responsibility.

    • Monolithic architecture is easi...

  • Answered by AI
  • Q2. Why is cloud better than on premise?
  • Ans. 

    Cloud offers scalability, cost-effectiveness, flexibility, and accessibility compared to on-premise solutions.

    • Scalability: Cloud allows for easily scaling resources up or down based on demand, while on-premise solutions require physical upgrades.

    • Cost-effectiveness: Cloud eliminates the need for expensive hardware and maintenance costs associated with on-premise solutions.

    • Flexibility: Cloud offers the ability to access ...

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. This was with manager level
Round 2 - Technical 

(1 Question)

  • Q1. This was with more senior member - DGM level

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare on basic to advanced Financial Reporting concepts including new guidelines issued time to time.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How many type of equipment used in your company in mines operation.
  • Ans. 

    There are various types of equipment used in mines operations, including heavy machinery, vehicles, drilling equipment, safety gear, and communication devices.

    • Heavy machinery such as excavators, dump trucks, and bulldozers are used for digging and transporting materials.

    • Drilling equipment like drills and blasting tools are used for extracting minerals from the ground.

    • Safety gear such as helmets, gloves, and safety harn...

  • Answered by AI
  • Q2. What is the tyre sixe of CAT772G Dumper.
  • Ans. 

    The tyre size of CAT772G Dumper is 18.00-33.

    • The tyre size of CAT772G Dumper is 18.00-33.

    • The tyre size is important for ensuring proper performance and safety of the vehicle.

    • Having the correct tyre size helps in maintaining stability and traction on various terrains.

  • Answered by AI

I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Brief overview of S&T system used in Railways, Differences between PI & EI, Types of failures in S&T Gears, Reasons for failures, maximum no. of failures attended, RCA analysis
  • Ans. 

    Overview of S&T system in Railways, differences between PI & EI, types and reasons for failures, RCA analysis

    • S&T system in Railways includes signaling, telecommunication, and train control systems

    • PI (Permanent Instrumentation) is used for continuous monitoring of track circuits, while EI (Event Instrumentation) is used for monitoring specific events

    • Types of failures in S&T gears include broken wires, damaged insulation...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was technical. Most of the questions were related to Railways S&T. Introductory was started by about briefing self academics & career history. Some non technical questions also followed after technical questions like why u are switching ur job, what are your expectations in coming years of job.
Overall I answered correctly & got selected.

TP Central Odisha Distribution Interview FAQs

How many rounds are there in TP Central Odisha Distribution Deputy Manager interview?
TP Central Odisha Distribution interview process usually has 4 rounds. The most common rounds in the TP Central Odisha Distribution interview process are Resume Shortlist, Aptitude Test and Technical.
What are the top questions asked in TP Central Odisha Distribution Deputy Manager interview?

Some of the top questions asked at the TP Central Odisha Distribution Deputy Manager interview -

  1. Isolator design and maintenance of the s...read more
  2. IS Code for Transform...read more
  3. I was interviewed for E&Q Dept. Technical question like Transformer maintenance...read more

Tell us how to improve this page.

TP Central Odisha Distribution Deputy Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
TP Central Odisha Distribution Deputy Manager Salary
based on 4 salaries
₹8.6 L/yr - ₹9 L/yr
9% less than the average Deputy Manager Salary in India
View more details

TP Central Odisha Distribution Deputy Manager Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

3.0

Skill development

5.0

Work-life balance

3.0

Salary

5.0

Job security

5.0

Company culture

3.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Lead Engineer
98 salaries
unlock blur

₹3.5 L/yr - ₹8.7 L/yr

Team Lead
96 salaries
unlock blur

₹3.8 L/yr - ₹15.5 L/yr

Senior Officer
13 salaries
unlock blur

₹3.5 L/yr - ₹6.7 L/yr

Associate Lead
11 salaries
unlock blur

₹8.5 L/yr - ₹12 L/yr

Officer
10 salaries
unlock blur

₹3 L/yr - ₹4.8 L/yr

Explore more salaries
Compare TP Central Odisha Distribution with

Suzlon Group

4.1
Compare

Adani Power

3.9
Compare

Adani Group

3.9
Compare

NTPC

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview