Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - Site supervisor 

(1 Question)

  • Q1. 1m3 witch cement bag use

Interview Preparation Tips

Interview preparation tips for other job seekers - Transmission line foundation work
Site safety control
Laber / contractor controlling
TBT tool box training
Round 1 - Technical 

(1 Question)

  • Q1. Solar electrical systems, HSSE all work safety, technical Trasfomer,33kv HT panal, systems communication Releted pyranometer abane temperature
  • Ans. Electrical equipment properly grounding all Electrical equipment and also modules to module & Pv area LA installation to connect all equipment rainy time no property loss and public safety. HSSE work all safety any electrical equipment PM/ New equipment installation LOTO parmit,site RISK ASSESSMENT, Hazard identify, Risk assessment as per site also all types parmit following
  • Answered Anonymously
Round 2 - Technical 

(1 Question)

  • Q1. Electrical & Safety
Round 3 - HR 

(1 Question)

  • Q1. Electrical & safety Releted

Interview Preparation Tips

Interview preparation tips for other job seekers - Make your work better and focus on work Pree planning team work & all work safety work,Team motivation work, best talkElectrical maintenance & Electrical equipment Replaced & insulation and solar project and electronics field

Site Supervisor Interview Questions Asked at Other Companies

asked in Lodha Group
Q1. What are handover process to civil or facillities
Q2. What is coping and why it is provide,what is lap length and joggl ... read more
Q3. Before starting block work what tipe of preparation we have to do
Q4. Do you have medical certificate and Compantancy certificate? If n ... read more
Q5. What will you fix at the iointof rcc walls and blocks walls

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Name and work and experience
Round 3 - Technical 

(1 Question)

  • Q1. DC supply and ac supply

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical job
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before May 2023. There was 1 interview round.

Round 1 - Site condition and Static meter 

(2 Questions)

  • Q1. Smart meter and static meter or transformer
  • Q2. Shutdown process
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(4 Questions)

  • Q1. Tell me about yourself
  • Q2. What is your favourite colour
  • Q3. Why do you join for adani company?
  • Q4. What are faccinate about it?
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Introduction

Round 2 - Technical 

(1 Question)

  • Q1. Technical Questions

Interview Questionnaire 

3 Questions

  • Q1. Definition of transformer and it's working
  • Ans. 

    A transformer is an electrical device that transfers electrical energy from one circuit to another through electromagnetic induction.

    • Transformers work on the principle of electromagnetic induction

    • They have two coils, primary and secondary, which are wound around a common magnetic core

    • When an alternating current flows through the primary coil, it creates a magnetic field which induces a voltage in the secondary coil

    • Tran...

  • Answered by AI
  • Q2. What is the skin effect
  • Ans. 

    Skin effect is the tendency of high-frequency current to flow near the surface of a conductor.

    • It occurs due to the self-inductance of the conductor.

    • It increases with frequency and decreases with the diameter of the conductor.

    • It can cause power loss and heating in high-frequency applications.

    • It is important to consider in designing high-frequency circuits and transmission lines.

    • Examples include radio antennas and high-f

  • Answered by AI
  • Q3. In 1km Ht line which material used
  • Ans. 

    The material used in a 1km Ht line depends on various factors such as voltage, weather conditions, and budget.

    • The voltage of the line determines the type of conductor material used, such as aluminum or copper.

    • Weather conditions can also affect the choice of material, with some materials being more resistant to corrosion or extreme temperatures.

    • Budget is also a factor, with some materials being more expensive than other...

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Tata in job for parmanent how
  • Q2. Benifits and salary how time of period
Round 2 - Technical 

(3 Questions)

  • Q1. Solar project site is working of day
  • Q2. Time of work how
  • Q3. Safety work of area how
  • Ans. 

    Safety work of area involves implementing safety measures to prevent accidents and ensure a safe working environment.

    • Conduct regular safety inspections of the work area

    • Provide safety training to all workers

    • Enforce the use of personal protective equipment (PPE)

    • Implement safety protocols and procedures

    • Maintain clear and accessible emergency exits

    • Ensure proper storage and handling of hazardous materials

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Tata Power Site Execution Engineer interview:
  • Technical Skills
Interview preparation tips for other job seekers - Site execution engineer
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. Construction work
  • Q2. Finishing work,Excavation, Levelling, backfilling soling, Pcc, Rcc
  • Q3. Scaffolding, Flooring, Door windows
  • Q4. Tiles plumbing, IPS flooring
  • Q5. Rain water pipe, water proffing
  • Q6. Resource Management, Daily, Weekly and Monthly planning
  • Q7. Safety and Quality work Client satisfaction

Interview Preparation Tips

Interview preparation tips for other job seekers - Congruction experience
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

About General knowledge Electrical related

Round 2 - Group Discussion 

Projects, HT< line

Round 3 - Technical 

(1 Question)

  • Q1. EHV line & substations & 100MVA transforms, breakers&CT&PT's and Wind power plant related
Round 4 - One-on-one 

(1 Question)

  • Q1. Electrical Techincal wind power plant EHV&HT&BOP related

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear sir/madam,
I have searching for vacancys

Adani Power Interview FAQs

How many rounds are there in Adani Power Site Supervisor interview?
Adani Power interview process usually has 2 rounds. The most common rounds in the Adani Power interview process are Technical and HR.
What are the top questions asked in Adani Power Site Supervisor interview?

Some of the top questions asked at the Adani Power Site Supervisor interview -

  1. 1m3 witch cement bag ...read more
  2. Solar electrical systems, HSSE all work safety, technical Trasfomer,33kv HT pa...read more
  3. Electrical & safety Rele...read more

Tell us how to improve this page.

Adani Power Site Supervisor Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Adani Group Interview Questions
3.9
 • 185 Interviews
Tata Power Interview Questions
3.9
 • 162 Interviews
NTPC Interview Questions
4.2
 • 159 Interviews
Suzlon Group Interview Questions
4.1
 • 128 Interviews
Torrent Power Interview Questions
3.7
 • 125 Interviews
Eaton Interview Questions
3.9
 • 117 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
Reliance Power Interview Questions
4.1
 • 47 Interviews
View all

Adani Power Site Supervisor Reviews and Ratings

based on 6 reviews

4.9/5

Rating in categories

4.8

Skill development

4.2

Work-life balance

4.6

Salary

4.8

Job security

5.0

Company culture

4.8

Promotions

4.8

Work satisfaction

Explore 6 Reviews and Ratings
Assistant Manager
939 salaries
unlock blur

₹5 L/yr - ₹15 L/yr

Deputy Manager
667 salaries
unlock blur

₹6 L/yr - ₹19.8 L/yr

Associate Manager
379 salaries
unlock blur

₹8.8 L/yr - ₹25 L/yr

Senior Engineer
342 salaries
unlock blur

₹3.7 L/yr - ₹11.1 L/yr

Manager
244 salaries
unlock blur

₹12 L/yr - ₹27 L/yr

Explore more salaries
Compare Adani Power with

NTPC

4.2
Compare

Tata Power

3.9
Compare

Reliance Power

4.1
Compare

JSW Energy

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview