Filter interviews by
I applied via Naukri.com and was interviewed in Jan 2024. There was 1 interview round.
Adani Solar is a leading solar power company in India, specializing in the manufacturing of solar modules and solar cells.
Adani Solar is a subsidiary of Adani Group, one of India's largest conglomerates.
They have a state-of-the-art solar manufacturing facility in Mundra, Gujarat.
The company produces high-quality solar modules and cells for both residential and commercial use.
Adani Solar has a strong focus on research a...
I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.
Adani Power interview questions for designations
I applied via Naukri.com and was interviewed in Aug 2023. There were 3 interview rounds.
Get interview-ready with Top Adani Power Interview Questions
I applied via Naukri.com and was interviewed in Mar 2023. There were 2 interview rounds.
I am a dedicated and experienced professional with strong leadership skills and a passion for achieving results.
Over 5 years of experience in management roles
Proven track record of successfully leading teams and achieving targets
Excellent communication and interpersonal skills
Strong problem-solving and decision-making abilities
Ability to adapt to changing environments and handle multiple tasks
Example: As an Assistant M...
I have 5 years of experience and my current CTC is $60,000 per year.
I have a total of 5 years of experience.
My current CTC is $60,000 per year.
I have worked in various roles and gained valuable skills.
I have successfully managed teams and achieved targets.
I have received recognition for my performance and contributions.
I applied via Approached by Company and was interviewed before Aug 2022. There were 5 interview rounds.
Logical reasoning, numerical skill, verbal ability
I applied via Naukri.com and was interviewed before Aug 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Jun 2022. There were 3 interview rounds.
Load factor is the ratio of the actual output of a power plant to its maximum possible output over a period of time.
Load factor is calculated by dividing the average power output by the maximum power output over a specific period.
A high load factor indicates efficient utilization of the plant's capacity, while a low load factor suggests underutilization.
It is important for assessing the economic performance of a power ...
A steam turbine in a thermal power plant converts thermal energy into mechanical energy through a series of components and processes.
Main components of a steam turbine include rotor, blades, casing, and steam inlet/outlet.
Functions of a steam turbine include converting thermal energy into mechanical energy, generating electricity, and driving the generator.
Working principle involves high-pressure steam entering the tur...
Key challenges in minimizing heat losses in thermal power generation and ensuring efficient heat transfer.
Key challenges include heat losses in the boiler, condenser, and other components leading to decreased efficiency and increased operational costs.
Considerations include proper insulation of components, regular maintenance to prevent leaks, and optimizing combustion processes.
Efficient heat transfer can be achieved ...
Primary responsibilities include ensuring smooth operation of electrical systems in a thermal power plant. Testing and commissioning a generator involves several steps.
Ensure proper maintenance and operation of electrical equipment to prevent breakdowns
Troubleshoot electrical issues and perform repairs as needed
Monitor electrical systems for efficiency and safety
Conduct regular inspections and tests to identify potenti...
Main factors affecting thermal power plant efficiency and strategies for optimization.
Main factors include boiler efficiency, turbine efficiency, heat rate, and plant load factor.
Optimization strategies include regular maintenance, use of advanced technology, and efficient fuel management.
Example project: Implementing a heat recovery system to capture waste heat and improve overall efficiency.
Example initiative: Upgrad...
Top trending discussions
1 Interview rounds
based on 175 reviews
Rating in categories
Assistant Manager
916
salaries
| ₹5 L/yr - ₹15 L/yr |
Deputy Manager
592
salaries
| ₹7 L/yr - ₹19 L/yr |
Associate Manager
386
salaries
| ₹8.8 L/yr - ₹25 L/yr |
Senior Engineer
357
salaries
| ₹3.7 L/yr - ₹11.8 L/yr |
Manager
227
salaries
| ₹12 L/yr - ₹27 L/yr |
NTPC
Tata Power
Reliance Power
JSW Energy