JSW Energy
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I was interviewed in Jan 2025.
There are 2 rounds of aptitude, questions are a bit difficult so prepare well!
I was interviewed in Aug 2024.
3 questions, 1 hour time
10 min of group discussion on impact of social media algo on society
Git is a version control system that tracks changes in code, while GitHub is a platform for hosting and collaborating on code.
Git is a distributed version control system used to track changes in code.
GitHub is a web-based platform for hosting Git repositories and collaborating on code.
Developers use Git to track changes, create branches, and merge code changes.
GitHub provides features like pull requests, issues, and pr...
JSW Energy interview questions for popular designations
posted on 27 Nov 2023
I applied via AmbitionBox
Get interview-ready with Top JSW Energy Interview Questions
I applied via Company Website
I was interviewed before Feb 2024.
On the reliability and buisness development topic
On the case study of Buisness strategy
I applied via campus placement at Chitkara Institute of Engineering & Technology, Rajpura and was interviewed in Dec 2023. There were 3 interview rounds.
Aptitude test was of min difficulties and eqsy
Aptitude test was of min difficulties it was easy
2 python questions and some MCQ on sql
I applied via Naukri.com and was interviewed in Nov 2023. There were 3 interview rounds.
A wind power plant is a facility that harnesses the power of wind to generate electricity.
Wind power plants consist of wind turbines that convert the kinetic energy of wind into electrical energy.
The turbines are typically mounted on tall towers to capture the stronger and more consistent winds at higher altitudes.
The blades of the turbine rotate when the wind blows, which in turn rotates a generator to produce electri...
A wind power plant motor is a device that converts wind energy into electrical energy.
Wind power plants use turbines to capture the kinetic energy of the wind.
The wind turns the blades of the turbine, which are connected to a generator.
The generator converts the rotational energy into electrical energy.
The electrical energy is then transmitted through power lines for distribution.
Wind power plants can have different ty...
Wind power plant maintenance involves regular inspections, repairs, and servicing to ensure optimal performance and longevity.
Regular inspections are conducted to identify any issues or potential problems.
Repairs and replacements are carried out as needed to fix any faulty components.
Servicing includes cleaning, lubricating, and adjusting various parts of the wind turbines.
Maintenance also involves monitoring and analy...
I applied via Naukri.com and was interviewed in Feb 2023. There were 2 interview rounds.
Top trending discussions
The duration of JSW Energy interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 39 interviews
Interview experience
based on 391 reviews
Rating in categories
Assistant Manager
233
salaries
| ₹5 L/yr - ₹14.2 L/yr |
Deputy Manager
226
salaries
| ₹7.6 L/yr - ₹20.6 L/yr |
Manager
126
salaries
| ₹10 L/yr - ₹25.5 L/yr |
Junior Manager
79
salaries
| ₹5.3 L/yr - ₹13 L/yr |
Senior Manager
78
salaries
| ₹16.4 L/yr - ₹40 L/yr |
Adani Green Energy
Tata Power
NTPC
Adani Power