JSW Energy
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Walk-in and was interviewed before Sep 2019. There were 3 interview rounds.
In my previous role, I was responsible for overseeing all administrative functions including facilities management, vendor management, and office operations. I chose this company because of its reputation for employee development and strong company culture.
Managed facilities and office operations in previous role
Oversaw vendor management and procurement
Chose current company for its employee development opportunities an
Top trending discussions
I applied via Referral and was interviewed in Jul 2022. There were 3 interview rounds.
I am currently earning $60,000 per year.
Be honest about your current salary
Avoid providing exact figures if possible
Focus on your qualifications and experience instead
I applied via Approached by Company and was interviewed in Aug 2022. There were 3 interview rounds.
Closed loop control systems are feedback systems that continuously monitor and adjust the output based on the desired input.
Closed loop control systems use feedback to maintain a desired output
They continuously monitor the output and compare it to the desired input
Based on the comparison, adjustments are made to maintain the desired output
Examples include thermostat-controlled heating systems and cruise control in cars
I applied via Job Portal and was interviewed before Apr 2023. There were 2 interview rounds.
posted on 29 Aug 2023
I applied via Naukri.com and was interviewed before Aug 2022. There were 5 interview rounds.
There is general aptitude test.
I applied via Referral and was interviewed in Sep 2023. There was 1 interview round.
I was interviewed before Jan 2024.
Tests conducted on power transformers include insulation resistance test, turns ratio test, and power factor test.
Insulation resistance test checks the insulation of the transformer windings.
Turns ratio test verifies the turns ratio between primary and secondary windings.
Power factor test measures the efficiency of the transformer in converting power.
Other tests include winding resistance test, transformer oil testing,
Specifications for a 33 kV transmission line and how to select appropriate specifications
Specifications for a 33 kV transmission line include conductor size, insulation type, tower height, and distance between towers
Conductor size should be chosen based on current carrying capacity and voltage drop considerations
Insulation type should be selected based on environmental conditions and required insulation levels
Tower hei...
As an Assistant Manager, my job profile involves assisting the manager in overseeing daily operations, managing staff, and ensuring customer satisfaction.
Assist manager in daily operations
Manage staff and delegate tasks
Ensure customer satisfaction and handle customer complaints
Create work schedules and monitor employee performance
Relay coordination in electrical systems is the process of ensuring that protective relays operate in a coordinated manner to isolate faults while minimizing disruption to the system.
Relay coordination involves setting time-current curves for protective relays to ensure that the relay closest to the fault operates first.
It is important to coordinate relays to prevent unnecessary tripping of healthy equipment during a f...
I was interviewed in Sep 2020.
I applied via Company Website and was interviewed before Jan 2021. There were 3 interview rounds.
I applied via Job Portal and was interviewed in May 2024. There was 1 interview round.
Assistant Manager
238
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
229
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
125
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
83
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Manager
79
salaries
| ₹0 L/yr - ₹0 L/yr |
Adani Green Energy
Tata Power
NTPC
Adani Power