Upload Button Icon Add office photos

JSW Energy

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

JSW Energy Assistant Engineer Interview Questions and Answers

Updated 16 Aug 2023

JSW Energy Assistant Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. First describe about you...
  • Q2. About your current company and work .
  • Q3. Share your experience
  • Q4. Why do you change this company
  • Q5. What are you expecting about your salary

Interview questions from similar companies

Interview Questionnaire 

2 Questions

  • Q1. Pullout Test CBR Test ERT paling MMS coordinate survey boundary concrete cube slmp test cement test
  • Q2. No material vestege paling concrete
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. What's your past experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Product good, provide product training and All over good experience

I applied via Naukri.com and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Salary and notice period
  • Q2. Why you are changing the company

Interview Preparation Tips

Topics to prepare for Waaree Energies Assistant Manager interview:
  • Lean Manufacturing
Interview preparation tips for other job seekers - Don't come in this company. Very unprofessional HR and non industrialists people. There is no connection of your Roles and responsibilities with interview questions. Even interviewers Don't know about the questions.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. What is Process about New development
  • Ans. 

    Process about new development involves planning, designing, testing, and implementing innovative ideas or products.

    • Researching market trends and customer needs

    • Creating a detailed project plan

    • Collaborating with cross-functional teams

    • Testing prototypes and gathering feedback

    • Iterating on designs based on feedback

    • Launching the new product or service

  • Answered by AI
  • Q2. What is MSA, Control Plan
  • Ans. 

    MSA stands for Measurement System Analysis and Control Plan is a documented procedure to ensure quality control.

    • MSA is a method used to assess the measurement system variation to ensure data accuracy and reliability.

    • Control Plan is a detailed document outlining the steps to maintain quality control in production processes.

    • MSA includes tools like Gage R&R, Bias, Linearity, Stability, and Attribute Agreement Analysis.

    • Con...

  • Answered by AI
  • Q3. What is 7 QC Tools
  • Ans. 

    7 QC Tools are a set of tools used for quality control and problem-solving in manufacturing and business processes.

    • Check Sheet: Used to collect and analyze data in an organized manner.

    • Histogram: Represents data distribution visually to identify patterns and trends.

    • Pareto Chart: Helps prioritize issues by showing the most significant factors affecting quality.

    • Cause and Effect Diagram (Fishbone Diagram): Identifies root ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Knowledge about any field in Details

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Cable type and it's current rating
  • Ans. 

    Cable type refers to the construction and materials used in a cable, while current rating indicates the maximum current that can safely flow through the cable.

    • Cable type can be categorized based on insulation material (e.g. PVC, XLPE), conductor material (e.g. copper, aluminum), and construction (e.g. single-core, multi-core)

    • Current rating is determined by factors such as conductor size, insulation material, and ambien...

  • Answered by AI
  • Q2. What were the costs and other technical parameters, such as the client and scope of work, for your last project?
  • Ans. 

    The costs and technical parameters for my last project included client A, scope of work B, and a budget of $100,000.

    • Client: Company A

    • Scope of work: Development of new software system

    • Cost: $100,000

    • Technical parameters: Integration with existing systems, timeline of 6 months

  • Answered by AI
  • Q3. What are the types of substations and how does a bay function within them?
  • Ans. 

    Substations can be categorized into different types based on their functions and voltage levels. A bay within a substation is a specific area where equipment is located.

    • Types of substations include distribution substations, transmission substations, and switching substations.

    • Distribution substations typically step down voltage for local distribution to customers.

    • Transmission substations step up voltage for long-distanc...

  • Answered by AI

I applied via LinkedIn and was interviewed in Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. About job profile and competency in SAP
Round 3 - HR 

(1 Question)

  • Q1. ABOUT SALARY AND NEGOTIATION

Interview Preparation Tips

Interview preparation tips for other job seekers - INTRODUCE YOURSELF, VERY SEPECIFIC TO THE JOB PROFILE AND YOUR ACHEIVEMENTS
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2022. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 

There is general aptitude test.

Round 3 - One-on-one 

(1 Question)

  • Q1. There is technical as well as process questions
Round 4 - One-on-one 

(1 Question)

  • Q1. This is normal round with department head.
Round 5 - HR 

(1 Question)

  • Q1. Salary and other discussion
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Regarding previous experience
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I appeared for an interview before Jan 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. What are the tests conducted on power transformers and their applications?
  • Ans. 

    Tests conducted on power transformers include insulation resistance test, turns ratio test, and power factor test.

    • Insulation resistance test checks the insulation of the transformer windings.

    • Turns ratio test verifies the turns ratio between primary and secondary windings.

    • Power factor test measures the efficiency of the transformer in converting power.

    • Other tests include winding resistance test, transformer oil testing,

  • Answered by AI
  • Q2. What are the specifications for a 33 kV transmission line, and how can one select the appropriate specifications?
  • Ans. 

    Specifications for a 33 kV transmission line and how to select appropriate specifications

    • Specifications for a 33 kV transmission line include conductor size, insulation type, tower height, and distance between towers

    • Conductor size should be chosen based on current carrying capacity and voltage drop considerations

    • Insulation type should be selected based on environmental conditions and required insulation levels

    • Tower hei...

  • Answered by AI
  • Q3. What is your job profile and what responsibilities does it entail?
  • Ans. 

    As an Assistant Manager, my job profile involves assisting the manager in overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Assist manager in daily operations

    • Manage staff and delegate tasks

    • Ensure customer satisfaction and handle customer complaints

    • Create work schedules and monitor employee performance

  • Answered by AI
  • Q4. What is relay coordination in electrical systems?
  • Ans. 

    Relay coordination in electrical systems is the process of ensuring that protective relays operate in a coordinated manner to isolate faults while minimizing disruption to the system.

    • Relay coordination involves setting time-current curves for protective relays to ensure that the relay closest to the fault operates first.

    • It is important to coordinate relays to prevent unnecessary tripping of healthy equipment during a f...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - The second round focuses on evaluating management skills and responsibilities.

JSW Energy Interview FAQs

How many rounds are there in JSW Energy Assistant Engineer interview?
JSW Energy interview process usually has 2 rounds. The most common rounds in the JSW Energy interview process are Resume Shortlist and Technical.

Tell us how to improve this page.

JSW Energy Assistant Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 221 Interviews
Tata Power Interview Questions
3.9
 • 163 Interviews
NTPC Interview Questions
4.2
 • 158 Interviews
Suzlon Group Interview Questions
4.1
 • 129 Interviews
Torrent Power Interview Questions
3.7
 • 126 Interviews
Eaton Interview Questions
3.9
 • 121 Interviews
BHEL Interview Questions
4.1
 • 113 Interviews
ReNew Interview Questions
4.2
 • 88 Interviews
Vestas Interview Questions
4.3
 • 84 Interviews
View all
JSW Energy Assistant Engineer Salary
based on 35 salaries
₹3.1 L/yr - ₹8.7 L/yr
46% more than the average Assistant Engineer Salary in India
View more details

JSW Energy Assistant Engineer Reviews and Ratings

based on 3 reviews

1.5/5

Rating in categories

1.5

Skill development

3.4

Work-life balance

3.2

Salary

3.2

Job security

3.1

Company culture

1.4

Promotions

1.5

Work satisfaction

Explore 3 Reviews and Ratings
Assistant Manager
248 salaries
unlock blur

₹5 L/yr - ₹14.2 L/yr

Deputy Manager
238 salaries
unlock blur

₹7.6 L/yr - ₹21.7 L/yr

Manager
129 salaries
unlock blur

₹10 L/yr - ₹25.5 L/yr

Senior Manager
82 salaries
unlock blur

₹16.4 L/yr - ₹40 L/yr

Junior Manager
79 salaries
unlock blur

₹5.3 L/yr - ₹13 L/yr

Explore more salaries
Compare JSW Energy with

Suzlon Group

4.1
Compare

Adani Power

3.9
Compare

ReNew

4.2
Compare

Eaton

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview