Process about new development involves planning, designing, testing, and implementing innovative ideas or products.
Researching market trends and customer needs
Creating a detailed project plan
Collaborating with cross-functional teams
Testing prototypes and gathering feedback
Iterating on designs based on feedback
Launching the new product or service
MSA stands for Measurement System Analysis and Control Plan is a documented procedure to ensure quality control.
MSA is a method used to assess the measurement system variation to ensure data accuracy and reliability.
Control Plan is a detailed document outlining the steps to maintain quality control in production processes.
MSA includes tools like Gage R&R, Bias, Linearity, Stability, and Attribute Agreement Analysis.
Con...
7 QC Tools are a set of tools used for quality control and problem-solving in manufacturing and business processes.
Check Sheet: Used to collect and analyze data in an organized manner.
Histogram: Represents data distribution visually to identify patterns and trends.
Pareto Chart: Helps prioritize issues by showing the most significant factors affecting quality.
Cause and Effect Diagram (Fishbone Diagram): Identifies root ...
I applied via Naukri.com and was interviewed in May 2022. There were 2 interview rounds.
I applied via Referral and was interviewed in Feb 2021. There were 3 interview rounds.
I have 5 years of experience in retail management, overseeing teams and driving sales.
Managed a team of 15 sales associates and consistently exceeded sales targets
Implemented new training programs to improve customer service and product knowledge
Developed and executed marketing strategies to increase foot traffic and drive sales
Handled inventory management and ensured accurate stock levels
Resolved customer complaints a...
Waaree Energies interview questions for designations
Top trending discussions
Cable type refers to the construction and materials used in a cable, while current rating indicates the maximum current that can safely flow through the cable.
Cable type can be categorized based on insulation material (e.g. PVC, XLPE), conductor material (e.g. copper, aluminum), and construction (e.g. single-core, multi-core)
Current rating is determined by factors such as conductor size, insulation material, and ambien...
The costs and technical parameters for my last project included client A, scope of work B, and a budget of $100,000.
Client: Company A
Scope of work: Development of new software system
Cost: $100,000
Technical parameters: Integration with existing systems, timeline of 6 months
Substations can be categorized into different types based on their functions and voltage levels. A bay within a substation is a specific area where equipment is located.
Types of substations include distribution substations, transmission substations, and switching substations.
Distribution substations typically step down voltage for local distribution to customers.
Transmission substations step up voltage for long-distanc...
Regarding how to manage a site accommodation
I handle work pressure by prioritizing tasks, staying organized, and taking breaks when needed.
Prioritize tasks based on deadlines and importance
Stay organized by creating to-do lists and setting realistic goals
Take breaks to recharge and prevent burnout
Communicate with team members and delegate tasks when necessary
I applied via Job Portal and was interviewed in May 2024. There was 1 interview round.
posted on 29 Jan 2025
I was interviewed in Jul 2024.
based on 7 interviews
1 Interview rounds
based on 44 reviews
Rating in categories
Assistant Manager
190
salaries
| ₹5 L/yr - ₹13.1 L/yr |
Quality Engineer
118
salaries
| ₹1.5 L/yr - ₹5.8 L/yr |
Senior Engineer
116
salaries
| ₹4.2 L/yr - ₹8.5 L/yr |
Production Engineer
107
salaries
| ₹1.4 L/yr - ₹4.9 L/yr |
Maintenance Engineer
70
salaries
| ₹1.6 L/yr - ₹4.8 L/yr |
Vikram Solar
Adani Green Energy
Azure Power
Hero Future Energies