Filter interviews by
Process about new development involves planning, designing, testing, and implementing innovative ideas or products.
Researching market trends and customer needs
Creating a detailed project plan
Collaborating with cross-functional teams
Testing prototypes and gathering feedback
Iterating on designs based on feedback
Launching the new product or service
MSA stands for Measurement System Analysis and Control Plan is a documented procedure to ensure quality control.
MSA is a method used to assess the measurement system variation to ensure data accuracy and reliability.
Control Plan is a detailed document outlining the steps to maintain quality control in production processes.
MSA includes tools like Gage R&R, Bias, Linearity, Stability, and Attribute Agreement Analysis.
Con...
7 QC Tools are a set of tools used for quality control and problem-solving in manufacturing and business processes.
Check Sheet: Used to collect and analyze data in an organized manner.
Histogram: Represents data distribution visually to identify patterns and trends.
Pareto Chart: Helps prioritize issues by showing the most significant factors affecting quality.
Cause and Effect Diagram (Fishbone Diagram): Identifies root ...
I applied via Naukri.com and was interviewed in May 2022. There were 2 interview rounds.
I applied via Referral and was interviewed in Feb 2021. There were 3 interview rounds.
I have 5 years of experience in retail management, overseeing teams and driving sales.
Managed a team of 15 sales associates and consistently exceeded sales targets
Implemented new training programs to improve customer service and product knowledge
Developed and executed marketing strategies to increase foot traffic and drive sales
Handled inventory management and ensured accurate stock levels
Resolved customer complaints a...
Waaree Energies interview questions for designations
Top trending discussions
I appeared for an interview in Sep 2020.
I applied via Campus Placement and was interviewed before Oct 2022. There were 4 interview rounds.
Numbers,LCM,HCF,Time speed Distance,Percentage
They randomly given any topic. Time limit is 5-10 minutes in a group of 10 members. Everyone has to speak about the topic.
Types of concrete include normal strength, high strength, and high-performance concrete, each with different mix proportions.
Normal strength concrete: typically used for general construction, with mix proportions of 1:2:4 (cement:sand:aggregate)
High strength concrete: used for structures requiring higher strength, with mix proportions of 1:1.5:3
High-performance concrete: designed for specific applications, with mix pro
Steps involved in concreting & curing include preparation of formwork, mixing of concrete, pouring, leveling, finishing, and curing.
Prepare formwork by setting up wooden or metal molds to contain the concrete.
Mix concrete ingredients such as cement, sand, aggregate, and water in the correct proportions.
Pour the concrete into the formwork, ensuring it reaches all corners and edges.
Level the concrete surface using a scre...
Retaining walls are structures designed to hold back soil and prevent erosion.
Prevent soil erosion
Support sloping terrain
Create usable space on a hillside
Enhance landscaping design
Bending moment & Shear force diagrams show the variation of internal forces along the length of a beam.
Bending moment diagram shows the variation of bending moment along the length of a beam.
Shear force diagram shows the variation of shear force along the length of a beam.
These diagrams are essential for analyzing the behavior of beams under different loading conditions.
The diagrams help in determining the maximum bend...
Quantity Surveyors manage costs and contracts for construction projects, both on-site and in the office.
Preparing cost estimates and budgets
Analyzing construction plans and specifications
Negotiating with contractors and suppliers
Managing contracts and variations
Conducting site visits and inspections
Preparing progress reports and final accounts
I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.
Regarding how to manage a site accommodation
I handle work pressure by prioritizing tasks, staying organized, and taking breaks when needed.
Prioritize tasks based on deadlines and importance
Stay organized by creating to-do lists and setting realistic goals
Take breaks to recharge and prevent burnout
Communicate with team members and delegate tasks when necessary
I appeared for an interview before Mar 2024, where I was asked the following questions.
Greenhouse gases trap heat in the atmosphere, contributing to global warming. Their Global Warming Potential (GWP) varies significantly.
Carbon Dioxide (CO2) - GWP of 1, the most prevalent greenhouse gas.
Methane (CH4) - GWP of 25, significantly more effective than CO2 over 100 years.
Nitrous Oxide (N2O) - GWP of 298, emitted from agricultural and industrial activities.
Fluorinated gases - GWP ranges from 1,000 to over 10,
EIA (Environmental Impact Assessment) evaluates the potential environmental effects of proposed projects.
1. Screening: Determine if a project requires EIA. Example: A new highway may need an EIA.
2. Scoping: Identify key issues and impacts to be assessed. Example: Assessing effects on local wildlife.
3. Impact Assessment: Analyze potential environmental impacts. Example: Evaluating air quality changes due to construction...
based on 7 interviews
1 Interview rounds
based on 48 reviews
Rating in categories
Assistant Manager
202
salaries
| ₹5 L/yr - ₹12 L/yr |
Quality Engineer
145
salaries
| ₹1.5 L/yr - ₹5 L/yr |
Senior Engineer
119
salaries
| ₹4 L/yr - ₹8.5 L/yr |
Production Engineer
105
salaries
| ₹1.6 L/yr - ₹4.9 L/yr |
Maintenance Engineer
72
salaries
| ₹1.6 L/yr - ₹4.8 L/yr |
Adani Power
ReNew
Adani Green Energy
Vestas