JSW Energy
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
Current is the flow of electric charge in a circuit.
Current is measured in Amperes (A).
It is the rate of flow of electric charge through a conductor.
Current flows from the positive terminal to the negative terminal in a circuit.
There are two types of current - direct current (DC) and alternating current (AC).
Conductors diameter can be calculated using the formula: diameter = sqrt((4 * area) / pi)
Calculate the area of the conductor (usually circular) using the formula: area = pi * (radius^2)
Determine the radius of the conductor
Use the formula: diameter = sqrt((4 * area) / pi) to calculate the diameter
I applied via Campus Placement and was interviewed before Nov 2022. There were 3 interview rounds.
Any topic such as bullet train, race, education, GSt etc
The ratio of cement, sand, and aggregate in M20 concrete is 1:1.5:3.
The ratio of cement to sand to aggregate is 1:1.5:3 in M20 concrete.
For every 1 part of cement, 1.5 parts of sand and 3 parts of aggregate are used.
This ratio ensures the desired strength and workability of the concrete mix.
I applied via campus placement at Dayalbagh Educational Institute, Agra and was interviewed before Feb 2023. There were 3 interview rounds.
Scope of Renewable energy in India
I applied via campus placement at MBM Engineering College, Jodhpur and was interviewed before Mar 2023. There were 3 interview rounds.
Basic physics and aptitude questions
Current affair topics group of 8 people
JSW Energy interview questions for designations
I was interviewed before Mar 2023.
I applied via campus placement at RV College Of Engineering (RVCE) and was interviewed before Mar 2022. There were 4 interview rounds.
Basic civil related apti was taken in the beginning
Today's current topic were given such as EV vehicle and religion were given
Top trending discussions
Cable type refers to the construction and materials used in a cable, while current rating indicates the maximum current that can safely flow through the cable.
Cable type can be categorized based on insulation material (e.g. PVC, XLPE), conductor material (e.g. copper, aluminum), and construction (e.g. single-core, multi-core)
Current rating is determined by factors such as conductor size, insulation material, and ambien...
The costs and technical parameters for my last project included client A, scope of work B, and a budget of $100,000.
Client: Company A
Scope of work: Development of new software system
Cost: $100,000
Technical parameters: Integration with existing systems, timeline of 6 months
Substations can be categorized into different types based on their functions and voltage levels. A bay within a substation is a specific area where equipment is located.
Types of substations include distribution substations, transmission substations, and switching substations.
Distribution substations typically step down voltage for local distribution to customers.
Transmission substations step up voltage for long-distanc...
Regarding how to manage a site accommodation
I handle work pressure by prioritizing tasks, staying organized, and taking breaks when needed.
Prioritize tasks based on deadlines and importance
Stay organized by creating to-do lists and setting realistic goals
Take breaks to recharge and prevent burnout
Communicate with team members and delegate tasks when necessary
I applied via Company Website and was interviewed in Apr 2024. There were 2 interview rounds.
Gear box replacement work
Belt clamping take-up pulley up and blumber block top cover open and slue Barring remove and new slue Barring checking and replace and bolts nut tightening sure and top cover fixed and bolts nut tightening sure and belt clamping and tackup pulley down and paper work cancelled and conveyer belt running ok
Old motor bolts nut open and new motor replace and bolts nut tightening sure and Dayal gauge eliminate process ok and paper work cancelled and conveyer belt running ok
Walked away clean and fresh and bolts nut open and old gear box remove and new gear box replace and bolts nut tightening sure and Dayal gauge eliminate process ok paper work cancelled and conveyer belt running ok
I applied via Job Portal and was interviewed in May 2024. There was 1 interview round.
based on 7 interviews
1 Interview rounds
based on 40 reviews
Rating in categories
Assistant Manager
238
salaries
| ₹5 L/yr - ₹14.2 L/yr |
Deputy Manager
226
salaries
| ₹7.6 L/yr - ₹20.6 L/yr |
Manager
126
salaries
| ₹10 L/yr - ₹25.5 L/yr |
Senior Manager
80
salaries
| ₹16.4 L/yr - ₹40 L/yr |
Junior Manager
79
salaries
| ₹5.3 L/yr - ₹13 L/yr |
Adani Green Energy
Tata Power
NTPC
Adani Power