Upload Button Icon Add office photos

Arabtec Construction

Compare button icon Compare button icon Compare

Filter interviews by

Arabtec Construction Site Supervisor Interview Questions and Answers

Updated 8 Feb 2022

8 Interview questions

A Site Supervisor was asked
Q. What does a 1:30 scale mean?
Ans. 

Scale 1:30 refers to a ratio where 1 unit on the scale represents 30 units in real life.

  • Scale 1:30 is commonly used in architectural and engineering drawings.

  • It means that every measurement on the drawing is 30 times smaller than the actual size.

  • For example, if a wall is represented as 10 cm on the drawing, its actual size would be 300 cm (10 cm x 30).

A Site Supervisor was asked
Q. How will you verify the right angle of wall corners?
Ans. 

To check the right angle of walls corner, use a carpenter's square or a digital angle finder.

  • Use a carpenter's square by placing it against the corner of the wall and checking if the edges align perfectly.

  • Alternatively, use a digital angle finder to measure the angle between the two walls and ensure it is 90 degrees.

  • Ensure the walls are straight and plumb before checking the corner angle.

Site Supervisor Interview Questions Asked at Other Companies

asked in Lodha Group
Q1. What is the handover process to civil or facilities teams?
Q2. What is coping and why it is provide,what is lap length and joggl ... read more
Q3. What is your knowledge of basic computer skills?
Q4. Do you have a medical certificate and a Competency certificate?
Q5. How would you fix the joint between RCC walls and block walls?
A Site Supervisor was asked
Q. What preparations are necessary before starting block work?
Ans. 

Before starting block work, preparation involves site survey, layout marking, excavation, and foundation preparation.

  • Conduct a site survey to assess the ground conditions and identify any potential obstacles or hazards.

  • Mark the layout of the block work using strings, stakes, and levels to ensure accurate positioning.

  • Excavate the area where the block work will be installed, removing any existing debris or vegetatio...

A Site Supervisor was asked
Q. What is the weight of a 25mm diameter steel bar that is 4 meters long?
Ans. 

The weight of a 25mm diameter steel bar of 4 meters length.

  • To calculate the weight, we need to know the density of the steel.

  • The density of steel is typically around 7850 kg/m^3.

  • Using the formula weight = volume * density, we can calculate the weight of the steel bar.

  • The volume of a cylindrical bar can be calculated using the formula volume = π * (diameter/2)^2 * length.

  • Substituting the values, we can calculate th...

A Site Supervisor was asked
Q. What do you know about safety regulations?
Ans. 

Safety refers to the measures and precautions taken to prevent accidents, injuries, and hazards in the workplace.

  • Safety involves identifying and assessing potential risks and hazards in the workplace.

  • It includes implementing safety protocols, procedures, and guidelines to minimize or eliminate risks.

  • Safety also involves providing appropriate safety equipment and training to employees.

  • Regular inspections and audits...

A Site Supervisor was asked
Q. How much plaster can be done by one mason and one laborer?
Ans. 

The amount of plaster that can be done by 1 mason and 1 labor depends on various factors.

  • The skill and experience of the mason and labor

  • The size and complexity of the area to be plastered

  • The type of plaster being used

  • The tools and equipment available

  • The time allocated for the task

  • The working conditions and environment

  • The efficiency and coordination between the mason and labor

  • On average, a skilled mason and labor c...

A Site Supervisor was asked
Q. What is the size of the work area?
Ans. 

The size of a full play can vary depending on the specific production and script.

  • The size of a full play can range from small-scale productions with a few actors to large-scale productions with a large cast and elaborate sets.

  • Some plays may require a small ensemble cast, while others may have a large ensemble cast.

  • The size of a play can also be influenced by the number of scenes, locations, and set changes.

  • For exa...

Are these interview questions helpful?
A Site Supervisor was asked
Q. What checks need to be performed after plastering?
Ans. 

Before applying plaster, check surface preparation, moisture levels, and material compatibility for optimal adhesion and finish.

  • Surface Preparation: Ensure the surface is clean, free of dust, and properly roughened for better adhesion.

  • Moisture Levels: Check for moisture content in the substrate; excessive moisture can lead to plaster failure.

  • Material Compatibility: Verify that the plaster type is suitable for the ...

Arabtec Construction Site Supervisor Interview Experiences

1 interview found

Site Supervisor Interview Questions & Answers

user image Rahamat Ali Ansari

posted on 8 Feb 2022

I applied via Recruitment Consulltant and was interviewed before Feb 2021. There were 3 interview rounds.

Round 1 - Group Discussion 
Pro Tip by AmbitionBox:
Don’t treat group discussions as an argument. Group discussion is about reaching a meaningful conclusion.
View all tips
Round 2 - Aptitude Test 

Behavior

Round 3 - Technical 

(10 Questions)

  • Q1. Show drawings ànd asked questions where is the tìtal writen
  • Q2. Ofþer plaster what's we have to check
  • Ans. 

    Before applying plaster, check surface preparation, moisture levels, and material compatibility for optimal adhesion and finish.

    • Surface Preparation: Ensure the surface is clean, free of dust, and properly roughened for better adhesion.

    • Moisture Levels: Check for moisture content in the substrate; excessive moisture can lead to plaster failure.

    • Material Compatibility: Verify that the plaster type is suitable for the subst...

  • Answered by AI
  • Q3. What is the weightof 25 mmdia steel bar of 4 mts
  • Ans. 

    The weight of a 25mm diameter steel bar of 4 meters length.

    • To calculate the weight, we need to know the density of the steel.

    • The density of steel is typically around 7850 kg/m^3.

    • Using the formula weight = volume * density, we can calculate the weight of the steel bar.

    • The volume of a cylindrical bar can be calculated using the formula volume = π * (diameter/2)^2 * length.

    • Substituting the values, we can calculate the wei...

  • Answered by AI
  • Q4. How will you check the right angle of walls corner
  • Ans. 

    To check the right angle of walls corner, use a carpenter's square or a digital angle finder.

    • Use a carpenter's square by placing it against the corner of the wall and checking if the edges align perfectly.

    • Alternatively, use a digital angle finder to measure the angle between the two walls and ensure it is 90 degrees.

    • Ensure the walls are straight and plumb before checking the corner angle.

  • Answered by AI
  • Q5. What's the size of ful play
  • Ans. 

    The size of a full play can vary depending on the specific production and script.

    • The size of a full play can range from small-scale productions with a few actors to large-scale productions with a large cast and elaborate sets.

    • Some plays may require a small ensemble cast, while others may have a large ensemble cast.

    • The size of a play can also be influenced by the number of scenes, locations, and set changes.

    • For example,...

  • Answered by AI
  • Q6. What' do you know about Safety
  • Ans. 

    Safety refers to the measures and precautions taken to prevent accidents, injuries, and hazards in the workplace.

    • Safety involves identifying and assessing potential risks and hazards in the workplace.

    • It includes implementing safety protocols, procedures, and guidelines to minimize or eliminate risks.

    • Safety also involves providing appropriate safety equipment and training to employees.

    • Regular inspections and audits are ...

  • Answered by AI
  • Q7. What is meaning scale 1;30
  • Ans. 

    Scale 1:30 refers to a ratio where 1 unit on the scale represents 30 units in real life.

    • Scale 1:30 is commonly used in architectural and engineering drawings.

    • It means that every measurement on the drawing is 30 times smaller than the actual size.

    • For example, if a wall is represented as 10 cm on the drawing, its actual size would be 300 cm (10 cm x 30).

  • Answered by AI
  • Q8. What will you fix at the iointof rcc walls and blocks walls
  • Ans. 

    In order to fix the joints of RCC walls and block walls, various methods can be used such as grouting, sealing, and reinforcement.

    • Grouting is the process of filling the joints with a cementitious material to provide strength and stability.

    • Sealing the joints with appropriate sealants helps in preventing water leakage and enhancing the durability of the walls.

    • Reinforcing the joints with steel bars or mesh can improve the...

  • Answered by AI
  • Q9. How much plaster can be don by 1 mason 1 Labour
  • Ans. 

    The amount of plaster that can be done by 1 mason and 1 labor depends on various factors.

    • The skill and experience of the mason and labor

    • The size and complexity of the area to be plastered

    • The type of plaster being used

    • The tools and equipment available

    • The time allocated for the task

    • The working conditions and environment

    • The efficiency and coordination between the mason and labor

    • On average, a skilled mason and labor can pl...

  • Answered by AI
  • Q10. Before starting block work what tipe of preparation we have to do
  • Ans. 

    Before starting block work, preparation involves site survey, layout marking, excavation, and foundation preparation.

    • Conduct a site survey to assess the ground conditions and identify any potential obstacles or hazards.

    • Mark the layout of the block work using strings, stakes, and levels to ensure accurate positioning.

    • Excavate the area where the block work will be installed, removing any existing debris or vegetation.

    • Pre...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Arabtec Construction Site Supervisor interview:
  • Team Management
Interview preparation tips for other job seekers - All management would be honest and think about company groth

Top trending discussions

View All
Interview Tips & Stories
2w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about Arabtec Construction?
Ask anonymously on communities.

Interview questions from similar companies

Safety Officer Interview Questions & Answers

Eversendai user image sunil kumar pradhan

posted on 8 Sep 2020

Interview Questionnaire 

1 Question

  • Q1. How to provide fall arresting system in high rise storry
  • Ans. 

    Fall arresting system in high rise story can be provided through various means.

    • Use of safety nets

    • Installation of guardrails

    • Use of personal fall arrest systems

    • Proper training and education of workers

    • Regular inspection and maintenance of equipment

  • Answered by AI

Site Supervisor Interview Questions Asked at Other Companies

asked in Lodha Group
Q1. What is the handover process to civil or facilities teams?
Q2. What is coping and why it is provide,what is lap length and joggl ... read more
Q3. What is your knowledge of basic computer skills?
Q4. Do you have a medical certificate and a Competency certificate?
Q5. How would you fix the joint between RCC walls and block walls?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected
  • Q1. What is meant by a confined space?
  • Ans. 

    A confined space is an area not designed for continuous occupancy, with limited entry and exit, posing potential hazards.

    • Limited means of entry and exit, such as tanks, silos, or tunnels.

    • Potential for hazardous atmospheres, like low oxygen or toxic gases.

    • Risk of engulfment, such as in grain bins or water tanks.

    • Examples include manholes, storage tanks, and underground vaults.

  • Answered by AI
  • Q2. What does PTW stand for and what is its significance?
  • Ans. 

    PTW stands for Permit to Work, a crucial safety management tool for controlling hazardous work activities.

    • PTW ensures that all safety measures are in place before work begins.

    • It involves risk assessment and identification of hazards.

    • Examples include hot work permits for welding or confined space entry permits.

    • PTW helps in communication between workers and management regarding safety protocols.

    • It is often used in indust...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Safety related question work at height. Lifting Plan
  • Q2. Log out Tag out related question

Interview Preparation Tips

Interview preparation tips for other job seekers - i share my openion my interview question I advise my experience before interview to prepare and confidence.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(6 Questions)

  • Q1. What about yourJob ?
  • Q2. My job is everything provide safety
  • Q3. What's your self ?
  • Q4. This is my all job relationship details
  • Q5. Which hieght need work at height?
  • Ans. 

    Work at height is typically considered to be any task performed above ground level, such as on ladders, scaffolding, or roofs.

    • Work at height typically refers to tasks performed above ground level

    • Common examples include working on ladders, scaffolding, or roofs

    • Height requirements may vary depending on the specific job or industry

  • Answered by AI
  • Q6. Ground level to 1.8 mtr
  • Ans. 

    The question is likely referring to the height range for safety measures or regulations.

    • This height range is commonly used in safety regulations for fall protection.

    • Safety measures such as guardrails or safety harnesses may be required for working at this height.

    • Training on proper use of safety equipment is essential for workers at this height.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - My interview shairing totally Good experience
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2023. There were 2 interview rounds.

Round 1 - Assignment 

Objective types questions

Round 2 - One-on-one 

(2 Questions)

  • Q1. Safety management
  • Q2. Safety workplace

I applied via Recruitment Consulltant and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

H2s, confined space hazard and precaution, what's different b/w pre commissioning & commissioning, PSV, SWL, STEL, What's is ur pervious experience eg. Flare erection, tank erection, pre commissioning & commissioning, 11kv crude substation.

Interview Preparation Tips

Topics to prepare for Nasser S. Al Hajri Corporation Safety Officer interview:
  • Nebosh igc
Interview preparation tips for other job seekers - Be prepare don't think i know some accurate questions they will ask, don't over confident best of luck.
Are these interview questions helpful?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Oct 2024, where I was asked the following questions.

  • Q1. What are the safety measures in place?
  • Ans. 

    Safety measures ensure a secure work environment, minimizing risks and promoting employee well-being through various protocols.

    • Personal Protective Equipment (PPE): Employees are required to wear safety gear such as helmets, gloves, and goggles to protect against hazards.

    • Safety Training Programs: Regular training sessions are conducted to educate employees on safety protocols, emergency procedures, and equipment handlin...

  • Answered by AI
  • Q2. What are your responsibilities regarding safety?
  • Ans. 

    As a Safety Supervisor, I ensure compliance with safety regulations, conduct training, and promote a culture of safety in the workplace.

    • Conduct Safety Audits: Regularly inspect the workplace to identify hazards and ensure compliance with safety regulations, such as checking for proper use of PPE.

    • Develop Safety Training Programs: Create and implement training sessions for employees on safety protocols, like emergency ev...

  • Answered by AI
  • Q3. What measures can be implemented to enhance safety?
  • Ans. 

    Implementing safety measures is crucial for preventing accidents and ensuring a secure work environment for all employees.

    • Regular Safety Training: Conduct ongoing training sessions to educate employees about safety protocols and emergency procedures.

    • Personal Protective Equipment (PPE): Ensure that all employees have access to and are trained in the proper use of PPE, such as helmets, gloves, and goggles.

    • Safety Audits: ...

  • Answered by AI
  • Q4. What is the purpose of safety audit?
  • Ans. 

    A safety audit evaluates workplace safety practices to identify hazards and ensure compliance with regulations.

    • Hazard Identification: Safety audits help identify potential hazards in the workplace, such as unsafe machinery or hazardous materials.

    • Regulatory Compliance: They ensure that the organization complies with local, state, and federal safety regulations, reducing legal risks.

    • Risk Assessment: Audits assess the lev...

  • Answered by AI
  • Q5. What is scaffolding.
  • Ans. 

    Scaffolding is a temporary structure used to support workers and materials during construction or maintenance activities.

    • Support Structure: Scaffolding provides a stable platform for workers to perform tasks at height, such as painting or building.

    • Types of Scaffolding: Common types include frame scaffolding, tube and clamp scaffolding, and suspended scaffolding, each suited for different tasks.

    • Safety Features: Scaffold...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes, the company is excellent. Safety measures are strong, our quality is high, and both your work and the staff are well cared for.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Nov 2024, where I was asked the following questions.

  • Q1. Regarding PV systems operating smoothly
  • Q2. Regarding transformer testing, inverter breakdown, inverter PR analysis etc.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Fair and was interviewed before Jan 2022. There were 7 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Hard work,.road line..pipe line.. others
  • Q2. Hard work.. road line..pipe line..others
  • Q3. Hard work..road line
Round 2 - Assignment 

Hard work and pipeline roadlines work...

Round 3 - Civil foreman 

(4 Questions)

  • Q1. Hard work..road line pipe line
  • Ans. 

    All machine.(bom loader.jcb.oather) old pipe line area.. new pipe line coverage

  • Answered by Satanam Singh
  • Q2. Hard work..road line pipe line work
  • Q3. Hard work..road line pipe line work ...
  • Q4. Hard work pipe line work
Round 4 - Assignment 

Hard work and pipeline roadlines work..

Round 5 - Technical 

(15 Questions)

  • Q1. Hard work and pipeline roadlines
  • Q2. Hard work and pipeline ..roadlines
  • Q3. Hard work and pipeline roadlines work.
  • Q4. Hard work and pipeline roadlines work..
  • Q5. JCB work road line pipe..
  • Q6. Hard work and pipeline ..roadlines work..
  • Q7. Hard work.. pipe line work..
  • Q8. Hard work and pipeline roadlines ok
  • Q9. Civil foreman complete documents and..
  • Q10. Hard work and JCB work road line pipe line..
  • Q11. Road line pipe line.
  • Q12. Hard work pipe line pipe line
  • Q13. Hard work pipe line..
  • Q14. Hard work road line..
  • Q15. JCB work road line..
Round 6 - Coding Test 

Hard work and pipeline roadlines work..

Round 7 - Coding Test 

Hard work and pipeline roadlines

Interview Preparation Tips

Topics to prepare for Archirodon Civil Foreman interview:
  • Civil foreman
  • Graduate
Interview preparation tips for other job seekers - Civil foreman complete documents and please let me

Arabtec Construction Interview FAQs

How many rounds are there in Arabtec Construction Site Supervisor interview?
Arabtec Construction interview process usually has 3 rounds. The most common rounds in the Arabtec Construction interview process are Group Discussion, Aptitude Test and Technical.
What are the top questions asked in Arabtec Construction Site Supervisor interview?

Some of the top questions asked at the Arabtec Construction Site Supervisor interview -

  1. What will you fix at the iointof rcc walls and blocks wa...read more
  2. Before starting block work what tipe of preparation we have to...read more
  3. What is the weightof 25 mmdia steel bar of 4 ...read more

Tell us how to improve this page.

Arabtec Construction Site Supervisor Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

5.0

Skill development

3.0

Work-life balance

5.0

Salary

4.0

Job security

5.0

Company culture

2.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Time Keeper
9 salaries
unlock blur

₹2.7 L/yr - ₹3.6 L/yr

Planning Engineer
7 salaries
unlock blur

₹8.1 L/yr - ₹28.3 L/yr

MEP Manager
6 salaries
unlock blur

₹14.4 L/yr - ₹20 L/yr

Land Surveyor
5 salaries
unlock blur

₹0.7 L/yr - ₹6 L/yr

Safety Officer
5 salaries
unlock blur

₹1.4 L/yr - ₹5 L/yr

Explore more salaries
Compare Arabtec Construction with

Nasser S. Al Hajri Corporation

3.6
Compare

Saudi Binladin Group

4.1
Compare

Leighton Contractors

4.2
Compare

Amara Raja Infra

4.0
Compare
write
Share an Interview