i
Spark Minda
Filter interviews by
I applied via Walk-in and was interviewed in Oct 2022. There were 3 interview rounds.
Overall Equipment Effectiveness (OEE) is a measure of how effectively equipment is being utilized to produce quality products.
OEE is calculated by multiplying availability, performance, and quality rates.
Availability rate measures the percentage of time the equipment is available for production.
Performance rate measures the speed at which the equipment is producing products compared to its maximum capacity.
Quality rate...
Improved production efficiency by implementing new processes and reducing downtime.
Implemented a new scheduling system that reduced production downtime by 20%
Developed and implemented a preventive maintenance program that reduced equipment breakdowns by 15%
Led a team in optimizing production line layout, resulting in a 10% increase in overall efficiency
Streamlined inventory management processes, reducing waste and impr...
High pressure die casting is a metal casting process in which molten metal is injected into a mold cavity under high pressure.
Molten metal is injected into a mold cavity under high pressure
The mold is made of two halves and is designed to create a specific shape
The process is used to create complex shapes with high accuracy and surface finish
Commonly used for manufacturing automotive parts, aerospace components, and co
Cycle time is the time taken to complete a task while takt time is the time available to complete a task.
Cycle time is the total time taken to complete a process, including both processing and waiting time.
Takt time is the rate at which a product must be produced to meet customer demand.
Cycle time should be less than or equal to takt time to meet customer demand.
For example, if a company has a takt time of 60 seconds a...
My family background is diverse and has influenced my values and work ethic.
My parents are both engineers, which inspired my interest in the field.
I have two siblings, one of whom is a doctor, which has given me exposure to the medical field.
My grandparents were farmers, teaching me the importance of hard work and problem-solving.
My family has always encouraged education and supported my career aspirations.
I applied via Job Fair and was interviewed before Mar 2023. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Oct 2022. There were 2 interview rounds.
APQP stands for Advanced Product Quality Planning. It is a structured approach to product and process design that ensures customer satisfaction.
APQP is a process used in the automotive industry to ensure quality and reduce defects
It consists of five phases: Planning and Definition, Product Design and Development, Process Design and Development, Product and Process Validation, and Launch, Feedback, Assessment and Correc...
PPAP stands for Production Part Approval Process. It is a standardized process in the automotive industry to ensure quality and consistency.
PPAP is a set of documents that must be submitted by a supplier to an automotive manufacturer before production can begin.
The documents include items such as design records, engineering change documents, and control plans.
PPAP is used to ensure that the supplier's parts meet the cu...
A quality system is a set of procedures and processes designed to ensure that products or services meet specified requirements.
Quality system includes quality planning, quality control, quality assurance, and quality improvement
It helps to ensure consistency, reliability, and safety of products or services
Examples of quality systems include ISO 9001, Six Sigma, and Total Quality Management
Regular audits and inspections...
Quality tools are techniques or methods used to ensure the quality of a product or service.
Quality tools help in identifying and solving problems in a systematic way.
They can be used in various stages of a project, from planning to execution.
Examples of quality tools include flowcharts, Pareto charts, cause-and-effect diagrams, and statistical process control charts.
I applied via AmbitionBox and was interviewed in Sep 2022. There was 1 interview round.
The company achieves success by setting clear goals, implementing effective quality control measures, and continuously improving processes.
Setting clear goals: The company establishes specific, measurable, achievable, relevant, and time-bound (SMART) goals to guide its operations.
Implementing effective quality control measures: The company ensures that quality control processes are in place to monitor and evaluate the ...
Spark Minda interview questions for popular designations
Get interview-ready with Top Spark Minda Interview Questions
I applied via Recruitment Consulltant and was interviewed before Nov 2023. There was 1 interview round.
I was interviewed before Feb 2024.
I applied via Company Website and was interviewed in Jun 2022. There was 1 interview round.
To handle uncooperative staff, it is important to communicate effectively, address concerns, provide support, and establish clear expectations.
Open communication channels to understand the reasons for uncooperativeness
Address any concerns or issues raised by the staff
Provide necessary support, training, or resources to help staff perform their tasks effectively
Establish clear expectations and goals, ensuring everyone u...
To ensure quality, a production & quality engineer can implement various measures such as conducting inspections, implementing quality control processes, and using statistical analysis.
Conduct regular inspections to identify any defects or issues in the production process.
Implement quality control processes to ensure that products meet the required standards.
Use statistical analysis techniques to monitor and improve pr...
Implemented quality control procedures in a project for improving product reliability.
Identified critical components and their failure modes
Developed test plans and procedures to validate component reliability
Implemented statistical process control to monitor production process
Conducted root cause analysis and implemented corrective actions
Reduced product failure rate by 30% and improved customer satisfaction
I investigate production flaws by analyzing data, observing processes, and conducting tests.
Collect and analyze data on the production process
Observe the production process to identify potential flaws
Conduct tests to confirm the cause of the flaw
Collaborate with production team to develop solutions
Implement solutions and monitor results
Document findings and share with relevant stakeholders
A project quality plan is important to ensure that the project meets the required quality standards and customer expectations.
Helps to identify quality objectives and requirements
Defines quality control and assurance activities
Ensures compliance with industry standards and regulations
Reduces the risk of defects and rework
Improves customer satisfaction and trust
Provides a framework for continuous improvement
Helps to man
I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.
In my last job as a Project Engineer, I had the responsibility of overseeing project planning, execution, and monitoring to ensure successful completion.
Managed project timelines, budgets, and resources
Coordinated with cross-functional teams to ensure smooth project execution
Monitored project progress and identified and resolved any issues or risks
Communicated project updates to stakeholders and clients
Ensured complian...
Top trending discussions
The duration of Spark Minda interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 115 interviews
Interview experience
based on 1.6k reviews
Rating in categories
Assistant Manager
357
salaries
| ₹4.5 L/yr - ₹14.4 L/yr |
Senior Engineer
253
salaries
| ₹2.2 L/yr - ₹10.1 L/yr |
Quality Engineer
250
salaries
| ₹1.2 L/yr - ₹5.7 L/yr |
Deputy Manager
236
salaries
| ₹6.8 L/yr - ₹23.5 L/yr |
Engineer
169
salaries
| ₹2.2 L/yr - ₹7.1 L/yr |
Bharat Forge
Samvardhana Motherson Group
Endurance Technologies
Rane Group