Upload Button Icon Add office photos

Filter interviews by

Nagarjuna Construction Company Interview Questions, Process, and Tips

Updated 3 Mar 2025

Top Nagarjuna Construction Company Interview Questions and Answers

View all 216 questions

Nagarjuna Construction Company Interview Experiences

Popular Designations

299 interviews found

Interview Questionnaire 

4 Questions

  • Q1. Approximately 34 to 38 questions were asked during the 1st round.
  • Q2. How to place bottom and top steel in staircase. How to check reinforcement and shuttering in slab & column. Density of raw material Testing of steel, soil, raw material. Concrete design mix, Etc
  • Ans. 

    Placing bottom and top steel in staircase involves proper measurement and positioning. Checking reinforcement and shuttering in slab & column requires attention to detail. Density of raw material can be determined through testing. Testing of steel, soil, and raw material is crucial for quality assurance. Concrete design mix should be carefully calculated.

    • Measure and position bottom and top steel in staircase accurately

    • ...

  • Answered by AI
  • Q3. How to do carbon fibre rapping
  • Ans. 

    Carbon fibre wrapping is a technique used to reinforce structures using carbon fibre sheets and epoxy resin.

    • Carbon fibre wrapping involves applying carbon fibre sheets to a surface using epoxy resin.

    • The surface to be wrapped should be cleaned and prepared before applying the carbon fibre sheets.

    • The carbon fibre sheets are cut to the desired size and shape, and then laid onto the surface.

    • Epoxy resin is applied to the ca...

  • Answered by AI
  • Q4. Salary negotiation

Senior Quality Engineer Interview Questions asked at other Companies

Q1. what is least count of vernier caliper ,micrometer, height gauge?
View answer (13)

Interview Questionnaire 

3 Questions

  • Q1. Basically questions related to power distribution field & some of college courses.
  • Q2. In this round questions basically related to management & technical composition.
  • Q3. He only asked your previous n current financial requirements as per your interview.

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (57)

Assistant Engineer Roads Interview Questions & Answers

user image Anonymous

posted on 3 May 2019

I applied via Company Website and was interviewed in Oct 2018. There were 3 interview rounds.

Interview Preparation Tips

Round: Resume Shortlist
Experience: Experience

General Tips: First of all just be yourself and answer point to point, no roaming around.
I have prepared myself according to code books applied on my projects I have worked. Least but not last you must answer as you have represented yourself in your resume.
That's all

Skills: Communication, Analytical Skills, Leadership
Duration: 1-4 weeks

Civil Foreman Interview Questions & Answers

user image Anonymous

posted on 15 Jul 2017

I was interviewed in May 2018.

Interview Questionnaire 

7 Questions

  • Q1. Only construction line
  • Q2. Only my job
  • Q3. What type of your job
  • Ans. 

    As a Civil Foreman, my job involves overseeing construction projects, managing workers, ensuring safety regulations are followed, and coordinating with other professionals.

    • Supervising construction projects from start to finish

    • Managing and coordinating construction workers

    • Ensuring safety regulations and protocols are followed

    • Collaborating with engineers, architects, and other professionals

    • Scheduling and organizing work ...

  • Answered by AI
  • Q4. How much mm in 1"
  • Ans. 

    There are 25.4 millimeters in 1 inch.

    • 1 inch is equal to 25.4 millimeters.

    • The conversion factor from inches to millimeters is 25.4.

    • To convert inches to millimeters, multiply the number of inches by 25.4.

    • For example, 2 inches is equal to 50.8 millimeters (2 x 25.4).

  • Answered by AI
  • Q5. How much mm in 1mtr
  • Ans. 

    There are 1000 millimeters in 1 meter.

    • 1 meter is equal to 1000 millimeters.

    • The conversion factor from meters to millimeters is 1000.

    • To convert meters to millimeters, multiply the length in meters by 1000.

  • Answered by AI
  • Q6. Construction line
  • Q7. Technical field

Interview Preparation Tips

Round: Resume Shortlist
Experience: Civil foreman

General Tips: Good
Duration: 1-4 weeks

Civil Foreman Interview Questions asked at other Companies

Q1. How do prepare bbs. Shuttering work prosses , RCC and pqc work, lay out, DPR, and quantity .
View answer (1)

Nagarjuna Construction Company interview questions for popular designations

 Junior Engineer

 (22)

 Civil Engineer

 (14)

 Senior Engineer

 (14)

 Assistant Engineer

 (12)

 Assistant Engineer - Civil

 (10)

 Junior Engineer Civil

 (10)

 Civil Site Engineer

 (9)

 Graduate Engineer Trainee (Get)

 (6)

QC Engineer Interview Questions & Answers

user image Anonymous

posted on 14 Oct 2018

Interview Questionnaire 

1 Question

  • Q1. WHAT YOU WILL DO , IF YOU GET BATTER OPPORTUNITY THAN OUR COMPANY AFTER JOINING OUR COMPANY.
  • Ans. 

    I am committed to my current role and will focus on delivering results for the company. However, if a better opportunity arises, I will evaluate it based on my career goals and make a decision.

    • I will assess the new opportunity based on factors such as career growth, learning opportunities, and work-life balance.

    • I will consider discussing the new opportunity with my current employer to see if there are possibilities for...

  • Answered by AI

QC Engineer Interview Questions asked at other Companies

Q1. What is heat exchanger? What is pressure vessel? Function of he/pv? Mechanical properties with codes and standards? Material grade and difference? ASME codes and standards? NDT test? WPS pqr wpq? P no. F no. A no? ITP stage?
View answer (1)

Get interview-ready with Top Nagarjuna Construction Company Interview Questions

Site Engineer Interview Questions & Answers

user image chandrasekhar minchala

posted on 6 Dec 2017

Interview Questionnaire 

3 Questions

  • Q1. Coke oven and blast furnace technical lining questions
  • Q2. Site management cost control
  • Q3. How to Time saving
  • Ans. 

    Time saving can be achieved by optimizing processes, using technology, delegating tasks, and setting priorities.

    • Optimize processes to eliminate inefficiencies and reduce wasted time

    • Utilize technology tools to automate repetitive tasks and streamline workflows

    • Delegate tasks to team members to distribute workload and free up time for higher priority tasks

    • Set clear priorities and focus on important tasks to avoid wasting

  • Answered by AI

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (4)

Jobs at Nagarjuna Construction Company

View all

Assistant Store Manager Interview Questions & Answers

user image Prasad Molakalapalli

posted on 6 Jul 2017

Interview Preparation Tips

Round: Resume Shortlist
Experience: Job Profile Related Question asked what am mention in resume

Assistant Store Manager Interview Questions asked at other Companies

Q1. 2. What about kpi' importance in retail
View answer (37)

Interview Preparation Tips

Round: Test
Experience: There was an aptitude and technical test after which the company shortlisted 17 students.

Round: Other Interview
Experience: 7 were made offers after the interview.
Tips: Stay calm.

General Tips: It was interesting and fun. And definitely rewarding too.
Skill Tips: Pay at least a minimum amount of attention in all your classes. You never know when any of it might come up. Patience and good language skills also help.
College Name: NIT SURATHKAL

Graduate Engineer Trainee (Get) Interview Questions asked at other Companies

Q1. Q: 1 What is IC engine? What is the types of IC engine? Q:2 Difference between Otto cycle and Diesel cycle? What is the process of both cycle and what is the effeciency of both cycle ? Which one is good in effeciency? Q:3 Difference between... read more
View answer (2)

Interview Preparation Tips

Round: Test
Experience: 2 exams, one is aptitude+general knowledge and other is fully concentrated on Civil Core.

Round: Test
Tips: For web source, join ASCE group on LinkedIn.

General Tips: Keep calm and believe in yourself and your preparation. If you don’t know the answer say you don’t remember or don’t know. Be prepared for HR questions in advance like why do you want to join our company. Prepare yourself in advance for the questions like these. Visit company website and wiki page at least a day before and have a look at the projects they have completed.
Skill Tips: I read newspaper daily which I think was sufficient for the general knowledge and for core, follow any standard Gate preparation book (Arihant Publication) or class notes. The experience is a mixed filling as Some questions asked in the exam and in the interview are very general and basic.
College Name: NIT SURATHKAL

Graduate Engineer Trainee (Get) Interview Questions asked at other Companies

Q1. Q: 1 What is IC engine? What is the types of IC engine? Q:2 Difference between Otto cycle and Diesel cycle? What is the process of both cycle and what is the effeciency of both cycle ? Which one is good in effeciency? Q:3 Difference between... read more
View answer (2)

Nagarjuna Construction Company Interview FAQs

How many rounds are there in Nagarjuna Construction Company interview?
Nagarjuna Construction Company interview process usually has 2-3 rounds. The most common rounds in the Nagarjuna Construction Company interview process are Technical, HR and Resume Shortlist.
How to prepare for Nagarjuna Construction Company interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Nagarjuna Construction Company. The most common topics and skills that interviewers at Nagarjuna Construction Company expect are Quantity Surveying, Resource Planning, Rate Analysis, Primavera and QS.
What are the top questions asked in Nagarjuna Construction Company interview?

Some of the top questions asked at the Nagarjuna Construction Company interview -

  1. Why do we take only 1 set of cube sample at a casting of concrete of 5 or less ...read more
  2. How do we take slump for casting of concrete and what if when we go rise about ...read more
  3. What is the minimum thickness of grade s...read more
How long is the Nagarjuna Construction Company interview process?

The duration of Nagarjuna Construction Company interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Nagarjuna Construction Company Interview Process

based on 414 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.5k Interviews
Infosys Interview Questions
3.6
 • 7.6k Interviews
Wipro Interview Questions
3.7
 • 5.7k Interviews
Tech Mahindra Interview Questions
3.5
 • 3.9k Interviews
HCLTech Interview Questions
3.5
 • 3.8k Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
View all

Nagarjuna Construction Company Reviews and Ratings

based on 3.7k reviews

4.1/5

Rating in categories

3.8

Skill development

3.8

Work-life balance

3.9

Salary

4.1

Job security

3.8

Company culture

3.6

Promotions

3.8

Work satisfaction

Explore 3.7k Reviews and Ratings
Quantity Surveyor / Billing Engineer

Pune,

Mumbai

3-8 Yrs

Not Disclosed

Job Opening For ELV Design Engineer @ Hyderabad

Hyderabad / Secunderabad

6-11 Yrs

Not Disclosed

Explore more jobs
Junior Engineer
896 salaries
unlock blur

₹1.8 L/yr - ₹6 L/yr

Assistant Engineer
626 salaries
unlock blur

₹3.2 L/yr - ₹9 L/yr

Junior Engineer Civil
491 salaries
unlock blur

₹2 L/yr - ₹7.5 L/yr

Senior Engineer
434 salaries
unlock blur

₹4.3 L/yr - ₹11 L/yr

Assistant Engineer - Civil
290 salaries
unlock blur

₹3.3 L/yr - ₹8.9 L/yr

Explore more salaries
Compare Nagarjuna Construction Company with

Larsen & Toubro Limited

4.0
Compare

TCS

3.7
Compare

BHEL

4.1
Compare

Infosys

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview