Q1. Why do we take only 1 set of cube sample at a casting of concrete of 5 or less than 5 Meter cube.
Only 1 set of cube sample is taken at a casting of concrete of 5 or less than 5 Meter cube to save cost and time.
Taking multiple samples would increase the cost of testing.
The strength of concrete is usually consistent within a small volume.
ASTM C31 allows for only 1 set of samples for small volume concrete.
If the first set of samples fails, additional samples can be taken for verification.
Q2. How do we take slump for casting of concrete and what if when we go rise about 50 meter height ...is their any difference in slump value as we go rise or in high rise buildings
Slump for casting of concrete is measured using a cone. Slump value may decrease as height increases in high rise buildings.
Slump is measured using a cone and the difference between the height of the cone and the height of the concrete after it settles is the slump value.
As height increases in high rise buildings, the pressure on the concrete increases, which may cause the slump value to decrease.
To maintain the desired slump value, additives such as plasticizers or superplas...read more
Q3. What is the minimum thickness of grade slab
The minimum thickness of grade slab depends on the load it will bear and the soil conditions.
The thickness of the grade slab should be determined by a structural engineer.
It should be thick enough to support the weight of the structure and any additional loads.
The soil conditions should also be taken into consideration when determining the thickness.
For example, if the soil is soft or unstable, a thicker slab may be required.
The minimum thickness of the grade slab can vary fr...read more
Q4. What if we r doing a casting of concrete and in the meantime rain comes and continue for 2 days what would be the right bonding agent for recasting of concrete
The right bonding agent for recasting of concrete after rain would be a polymer-modified cementitious bonding agent.
The surface should be cleaned and dried before applying the bonding agent.
The bonding agent should be applied in a thin layer using a brush or roller.
The recasting of concrete should be done within the specified time frame mentioned by the bonding agent manufacturer.
Examples of polymer-modified cementitious bonding agents are SikaLatex R and Ardex P 82.
Q5. What is the unit weight of 1. 32mm dia steel 2. 25mm dia steel 3. 20mm dia steel 4. 16mm dia steel 5. 10mm dia steel 6. 08mm dia steel 7. 06mm dia steel?
Unit weight of different diameters of steel bars
Unit weight of steel = D^2/162.2 kg/m, where D is the diameter of the steel bar in mm
Calculate unit weight for each diameter provided in the question
32mm dia steel: 32^2/162.2 = 6.31 kg/m
25mm dia steel: 25^2/162.2 = 3.85 kg/m
20mm dia steel: 20^2/162.2 = 2.47 kg/m
16mm dia steel: 16^2/162.2 = 1.57 kg/m
10mm dia steel: 10^2/162.2 = 0.62 kg/m
08mm dia steel: 08^2/162.2 = 0.39 kg/m
06mm dia steel: 06^2/162.2 = 0.22 kg/m
Q6. 1.what is a civil engineer Ans. Civil engineers is a one of the most important parts of the engineering branch in which design the structure. Bridge. Dam road etc.
A civil engineer is a professional who designs, constructs, and maintains infrastructure such as buildings, roads, bridges, and water systems.
Designs and plans infrastructure projects
Ensures safety and functionality of structures
Manages construction projects
Collaborates with architects, contractors, and other professionals
Uses advanced technology and software for design and analysis
Specializes in areas such as transportation, geotechnical, or environmental engineering
Q7. How will you plan and execute a 1 KM 11KV Transmission Line?
Planning and executing a 1 KM 11KV transmission line requires careful consideration of various factors.
Conduct a site survey to determine the route and identify any obstacles
Design the transmission line based on the load requirements and voltage drop calculations
Obtain necessary permits and approvals from local authorities
Procure materials and equipment required for construction
Ensure safety measures are in place during construction
Test and commission the transmission line be...read more
Q8. How to Configure a Computer First Time, Installation, IP Configuration, Drivers, Lan Connections Etc
Configuring a computer for the first time involves installation, IP configuration, driver installation, and LAN connections.
Start by installing the operating system and necessary software
Configure the IP address and network settings
Install necessary drivers for hardware components
Connect to LAN network and configure settings
Ensure all updates and security patches are installed
Q9. 2. What is water cement ratio??
Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
It is an important factor in determining the strength and durability of concrete.
A lower water cement ratio results in stronger and more durable concrete.
The ideal water cement ratio varies depending on the type of concrete and its intended use.
For example, a water cement ratio of 0.45 is recommended for concrete used in bridges and other structures exposed to harsh weather c...read more
Q10. Deduction as per IS code for Connecte, Shuttering & Plaster
Deduction as per IS code for Connecte, Shuttering & Plaster
As per IS code, deduction for connected items is 2.5% of the total quantity
For shuttering, deduction is 10% of the total surface area
For plaster, deduction is 20% of the total surface area
These deductions are made to account for wastage and overlapping
Q11. What is the ratio of M 25 you have used in your project?
The ratio of M 25 used in the project is 1:1:2.
The ratio of M 25 concrete is 1 part cement, 1 part fine aggregates, and 2 parts coarse aggregates.
This ratio ensures the desired strength and durability of the concrete mix.
For example, if we need to prepare 1 cubic meter of M 25 concrete, we would use 350 kg of cement, 350 kg of fine aggregates, and 700 kg of coarse aggregates.
Q12. How can maintain store How can receive the material
To maintain a store, proper organization and inventory management are essential. Materials can be received through various methods such as purchase orders, deliveries, or transfers.
Implement a systematic inventory management system
Ensure proper organization and labeling of items
Regularly conduct stock checks and audits
Establish clear procedures for receiving materials
Verify the quantity and quality of received materials
Document all incoming materials and update inventory reco...read more
Q13. What is the size of playwood board used in centring?
The size of plywood board used in centring varies depending on the specific project requirements.
The size of plywood board used in centring can range from 4 feet by 8 feet to 4 feet by 10 feet.
Thicker plywood boards are typically used for heavier loads or taller structures.
Plywood boards are commonly used in construction for formwork and temporary support structures.
The size of plywood board used in centring is determined by the size and weight of the concrete structure being...read more
Q14. What is the condition of work location and how to handle the location what is your total experience how many projects will be handle
The work location is in good condition and I have experience handling various projects.
The work location is well-maintained with proper safety measures in place.
I have experience handling multiple projects simultaneously, ensuring compliance with HSE regulations.
I prioritize regular inspections and audits to maintain a safe work environment.
I have successfully managed X number of projects in the past, ensuring HSE standards were met.
Examples: Implementing safety training prog...read more
Q15. 2.what is a factor of safety of steel and concrete Ans. Factor of safety of steel is 1.15 nad concrete is 1.5
Factor of safety of steel is 1.15 and concrete is 1.5 in civil engineering.
Factor of safety is the ratio of the maximum load a structure can withstand to the actual load it carries.
A factor of safety of 1.5 for concrete means that the structure can withstand 1.5 times the maximum expected load.
A factor of safety of 1.15 for steel means that the structure can withstand 1.15 times the maximum expected load.
Factors of safety are used to ensure that structures are safe and reliab...read more
Q16. What is Shear Slump in Concrete And Resons?
Shear slump is a type of concrete slump that measures the consistency of concrete under shear stress.
Shear slump is a measure of the ability of concrete to resist deformation under shear forces.
It is determined by measuring the difference in height between the center of the concrete cone and the average of the four sides.
Shear slump is important in applications where concrete is subjected to shear forces, such as in beams and columns.
A low shear slump indicates a stiffer and ...read more
Q17. How to place bottom and top steel in staircase. How to check reinforcement and shuttering in slab & column. Density of raw material Testing of steel, soil, raw material. Concrete design mix, Etc
Placing bottom and top steel in staircase involves proper measurement and positioning. Checking reinforcement and shuttering in slab & column requires attention to detail. Density of raw material can be determined through testing. Testing of steel, soil, and raw material is crucial for quality assurance. Concrete design mix should be carefully calculated.
Measure and position bottom and top steel in staircase accurately
Pay attention to detail when checking reinforcement and sh...read more
Q18. 3.whta is a modulus of elasticity of stell and concrete Ans. Modulus of elasticity of stell is 2×10*5 Nper mm*2 and concrete is 5000 route under charectric compressive strength
Modulus of elasticity of steel is 2×10*5 N/mm² and concrete is 5000√f'c N/mm².
Modulus of elasticity is a measure of a material's stiffness.
Steel has a higher modulus of elasticity than concrete.
Modulus of elasticity is important in determining the deflection of a structure.
Concrete's modulus of elasticity is dependent on its compressive strength.
The higher the compressive strength of concrete, the higher its modulus of elasticity.
Q19. How to check reinforcement as per drawing u have got any problem in slab steel how to solve.
To check reinforcement as per drawing, use measuring tape and compare with the drawing. If there is a problem in slab steel, check for any missing bars or incorrect placement.
Use measuring tape to check the length and diameter of reinforcement bars
Compare the measurements with the drawing to ensure they match
Check for any missing bars or incorrect placement
If there is a problem, consult the structural engineer for a solution
Q20. What is meaning wcr ?
WCR stands for Working Capital Ratio.
Working Capital Ratio is a financial metric used to measure a company's liquidity and ability to pay off its short-term debts.
It is calculated by dividing a company's current assets by its current liabilities.
A WCR of 1 or higher indicates that a company has enough current assets to cover its current liabilities.
A WCR below 1 may indicate that a company may have difficulty paying off its short-term debts.
For example, if a company has $100,...read more
Q21. 1. PH value of weather???
PH value is not applicable to weather as it is a measure of acidity or alkalinity of a solution.
PH value is a measure of the concentration of hydrogen ions in a solution.
It is used to determine the acidity or alkalinity of a solution on a scale of 0 to 14.
Weather does not have a PH value as it is not a solution.
However, PH value can be affected by weather conditions such as acid rain.
Q22. ERP Software Configuration, How to Install Application in Windows, Linux, Ubuntu etc.
ERP software configuration and installation on Windows, Linux, and Ubuntu.
Ensure system requirements are met before installation.
Download the appropriate software package for the operating system.
Run the installation wizard and follow the prompts.
Configure the software settings according to business needs.
Test the software to ensure proper functionality.
Provide training to users on how to use the software.
Regularly update and maintain the software to ensure optimal performanc...read more
Q23. How to check brick and plaster and tiles work?
Brick, plaster, and tile work can be checked by inspecting for proper alignment, levelness, and uniformity.
Check for proper alignment of bricks and tiles using a straight edge or level.
Inspect for levelness of plaster using a spirit level.
Check for uniformity of color and texture in tiles.
Ensure that the joints between bricks or tiles are consistent in size and shape.
Look for any cracks or gaps in the plaster or grout between tiles.
Check that the corners of the walls are squa...read more
Q24. What is mode of measurement
Mode of measurement refers to the standard method used to measure quantities in construction projects.
It is important to establish a clear mode of measurement to ensure consistency and accuracy in cost estimation.
Common modes of measurement include SMM7, CESMM, and NRM.
SMM7 (Standard Method of Measurement) is widely used in the UK for building works.
CESMM (Civil Engineering Standard Method of Measurement) is used for civil engineering works.
NRM (New Rules of Measurement) is a...read more
Q25. What is the length of the props used in staging?
The length of props used in staging varies depending on the specific requirements of the production.
The length of props can range from a few inches to several feet, depending on the size of the stage and the needs of the performance.
Props used in staging can include furniture, small handheld items, and larger set pieces.
The length of props is determined by the director and set designer during the planning stages of the production.
Q26. What is the HSE, what is the HIRA, what is the HSC SOP,
HSE stands for Health, Safety, and Environment. HIRA is Hazard Identification and Risk Assessment. HSC SOP is Health and Safety Committee Standard Operating Procedure.
HSE focuses on ensuring the health, safety, and environmental protection of employees in the workplace.
HIRA involves identifying potential hazards in the workplace and assessing the risks associated with them.
HSC SOP outlines the procedures and guidelines for the Health and Safety Committee to follow in order to...read more
Q27. What is density of sand , water and aggregate.
The density of sand, water, and aggregate varies depending on their composition and temperature.
The density of sand ranges from 1300 to 1700 kg/m³.
The density of water is 1000 kg/m³ at 4°C.
The density of aggregate varies depending on its size and composition.
The density of fine aggregate ranges from 1600 to 1800 kg/m³.
The density of coarse aggregate ranges from 1200 to 1500 kg/m³.
Q28. What is SSH, Scp, Talnet, ifconfig, ifconfig, netstat, Tracert, ping commands Etc.
SSH, Scp, Telnet, ifconfig, netstat, Tracert, ping are all networking commands used for various purposes.
SSH is used for secure remote access to a server
Scp is used for secure file transfer between servers
Telnet is used for remote access to a server (less secure than SSH)
ifconfig is used to view and configure network interfaces
netstat is used to view network connections and statistics
Tracert is used to trace the route taken by packets across an IP network
ping is used to test ...read more
Q29. What is density of cement?
The density of cement varies depending on the type of cement used.
The density of ordinary Portland cement is around 1440 kg/m³.
The density of white cement is around 1300 kg/m³.
The density of rapid hardening cement is around 1250 kg/m³.
The density of low heat cement is around 1200 kg/m³.
The density of high alumina cement is around 1400 kg/m³.
Q30. What type of DI pipes k7 and k9 means
K7 and K9 are types of ductile iron pipes with different pressure ratings.
K7 pipes have a pressure rating of 7 bar, while K9 pipes have a pressure rating of 9 bar.
The pressure rating determines the maximum pressure the pipe can withstand without bursting.
K9 pipes are thicker and stronger than K7 pipes, making them suitable for high-pressure applications.
DI pipes are commonly used in water supply, sewage, and irrigation systems.
The letters 'K' in K7 and K9 stand for 'class', w...read more
Q31. How many dumpers needed for 15 km how many excavators required
The number of dumpers and excavators needed for a 15 km project depends on various factors such as the type of material being transported and the size of the excavation area.
The number of dumpers needed for a 15 km project will depend on the volume and weight of material to be transported, as well as the capacity of each dumper.
The number of excavators required will depend on the size of the excavation area, the type of soil or material to be excavated, and the depth of excav...read more
Q32. Shear force and bending moment description and calculation..
Shear force is the force perpendicular to the beam and bending moment is the torque that causes bending of the beam.
Shear force is calculated by finding the algebraic sum of all the forces acting on one side of the beam.
Bending moment is calculated by finding the algebraic sum of all the moments acting on one side of the beam.
Shear force and bending moment diagrams are used to visualize the distribution of these forces along the length of the beam.
These calculations are impor...read more
Q33. Describe the installation process for a 100 KVA DTR.
The installation process for a 100 KVA DTR involves site preparation, foundation construction, equipment placement, wiring, and testing.
Prepare the site by clearing the area and ensuring proper drainage
Construct a foundation that is level and able to support the weight of the DTR
Place the DTR on the foundation and secure it in place
Connect the wiring according to the manufacturer's instructions
Test the DTR to ensure it is functioning properly
Q34. How to Assemble New PC, What is Required Hardware Components.
To assemble a new PC, you need a motherboard, CPU, RAM, storage, power supply, and a case.
Choose a compatible motherboard and CPU
Install RAM in the correct slots
Choose storage options such as SSD or HDD
Select a power supply with enough wattage for your components
Choose a case that fits your motherboard and has enough room for your components
Q35. What is grade of concrete?
The grade of concrete refers to its strength and durability.
Grade of concrete is denoted by a number followed by 'M' which stands for mix.
The number represents the compressive strength of the concrete in megapascals (MPa).
For example, M20 grade concrete means the compressive strength is 20 MPa.
Different grades of concrete are used for different purposes, such as M10 for non-structural purposes and M40 for heavy-duty structures.
Q36. 1- Grade of concrete, 2-Rate analysis, 3-unit weight of different items, 4- what is Price Escalation, 5- what is non schedule items and to decide the rates of NS items, 6- what is the per unit weight of a squar...
read moreThe interview questions cover topics such as concrete grades, rate analysis, unit weight of items, price escalation, non-schedule items, and per unit weight of a square bar.
Concrete grades determine the strength and durability of the concrete mix.
Rate analysis involves breaking down the cost of various items in a construction project.
Unit weight refers to the weight of a specific quantity of a material.
Price escalation is the adjustment of prices over time to account for infl...read more
Q37. 3. Unit weight of 1m³ steel??
Unit weight of 1m³ steel?
The unit weight of steel varies depending on its type and grade
The density of mild steel is around 7850 kg/m³
The density of stainless steel is around 7480 kg/m³
The density of high carbon steel is around 7850 kg/m³
The density of low carbon steel is around 7700 kg/m³
Q38. Why we are use lap in centre of column or Zone B?
Lap is used in the center of a column or Zone B for structural stability and reinforcement.
Lap joints provide additional strength and stability to the column.
They help in distributing the load evenly across the column.
Lap joints prevent the column from cracking or failing under heavy loads.
Zone B is a critical area where the maximum bending moment occurs, and lap joints help in reinforcing this zone.
By using lap in the center of the column or Zone B, the overall structural in...read more
Q39. Frequency tests of construction material as per cpwd?
Frequency tests of construction material as per CPWD
Frequency tests of construction material are conducted as per the guidelines provided by CPWD (Central Public Works Department).
The frequency of tests depends on the type of material and its intended use in the construction project.
CPWD provides specific guidelines for different materials such as cement, aggregates, concrete, steel, etc.
The tests may include compressive strength tests, water absorption tests, sieve analysis,...read more
Q40. Consumption for mortar 1:3 and 1:6 ratio
The consumption for mortar 1:3 and 1:6 ratio depends on the area to be covered and thickness of the layer.
The consumption of mortar is calculated in terms of volume.
For 1:3 ratio, the mix proportion is 1 part cement and 3 parts sand.
For 1:6 ratio, the mix proportion is 1 part cement and 6 parts sand.
The thickness of the layer also affects the consumption of mortar.
The area to be covered is calculated by multiplying the length and width of the surface.
The consumption can be ca...read more
Q41. What is the reason behind switching company frequently.
Frequent company switches can be due to various reasons such as seeking growth opportunities, better compensation, or dissatisfaction with the work environment.
Seeking growth opportunities
Better compensation
Dissatisfaction with work environment
Q42. Take the cement in hand and Throw cement into bucket fill with water, if the cement flot on water it means it's good for the work...
The cement should sink and not float on water to be good for work.
If the cement floats on water, it means it has a high amount of gypsum or lime and is not suitable for construction.
Good quality cement should sink and settle at the bottom of the bucket.
The test is called the float test and is used to check the quality of cement before use.
The test should be done with clean water and the cement should be added slowly to avoid lumps.
The test is not foolproof and other tests lik...read more
Q43. What size aggregates are used in PCC?
Generally, aggregates ranging from 3/8 inch to 1.5 inches are used in PCC.
Aggregates used in PCC typically range from 3/8 inch to 1.5 inches in size.
The size of aggregates used in PCC depends on the specific requirements of the project.
Smaller aggregates are usually preferred for smoother finishes, while larger aggregates may be used for increased strength.
For example, a common aggregate size used in PCC is 3/4 inch.
Q44. What is unit weight of 20mm aggregate?
Unit weight of 20mm aggregate is typically around 1550 kg/m^3.
Unit weight of 20mm aggregate is usually around 1550 kg/m^3.
It can vary slightly depending on the specific gravity of the aggregate material.
Unit weight is important in determining the amount of material needed for a project.
For example, if the specific gravity of the aggregate is 2.7, then the unit weight would be 1620 kg/m^3.
Q45. What is unit weight 10mm aggregate?
Unit weight of 10mm aggregate is typically around 1600 kg/m^3.
Unit weight of 10mm aggregate is usually around 1600 kg/m^3.
It can vary slightly depending on the specific gravity of the aggregate material.
Unit weight is important in determining the quantity of aggregate needed for a project.
Q46. What is safety?, What is Hazard, whats is responsibilities of safety officer, what is work permit system?
Q47. Describe the earthing procedure for a distributor transformer.
Earthing procedure for a distributor transformer involves connecting the transformer to a grounding system.
The transformer should be connected to a grounding system using a grounding electrode.
The grounding electrode should be buried in the earth at a depth of at least 2.5 meters.
The grounding electrode should be made of copper or galvanized iron.
The grounding system should have a resistance of less than 1 ohm.
The earthing procedure should be carried out by a qualified electr...read more
Q48. How to find yield strength of 8mm dia steel of 550 grade?
The yield strength of 8mm dia steel of 550 grade can be found using standard testing methods.
Yield strength is the maximum stress a material can withstand without permanent deformation
Standard testing methods like tensile testing can be used to determine the yield strength
The 550 grade refers to the minimum yield strength of the steel
Consulting the material's specification or conducting tests can provide the exact yield strength
Q49. Different types of Formwork???
Formwork is a temporary structure used to support and shape concrete during construction.
Timber formwork: made of wood and commonly used for small to medium-sized projects.
Steel formwork: made of steel plates and used for large-scale projects.
Aluminum formwork: lightweight and easy to handle, suitable for repetitive use.
Plastic formwork: made of plastic panels or sheets, used for simple structures and low-cost projects.
Engineered formwork systems: customized formwork solution...read more
Q50. What is different b/w OPC and ppc
OPC is Ordinary Portland Cement while PPC is Portland Pozzolana Cement.
OPC is made from raw materials like limestone and clay while PPC is made from a mixture of pozzolanic material and OPC.
PPC has higher durability and strength compared to OPC.
PPC is more eco-friendly as it uses industrial waste as a raw material.
OPC is commonly used for construction of buildings and bridges while PPC is used for marine structures, hydraulic structures, and mass concreting.
PPC has a slower r...read more
Q51. Do you have engineering drawing understanding .
Yes, I have a good understanding of engineering drawings.
I am familiar with different types of engineering drawings such as mechanical, electrical, and architectural drawings.
I can interpret and analyze engineering drawings to understand the design and specifications of a product or structure.
I am proficient in reading and interpreting symbols, dimensions, and annotations on engineering drawings.
I have experience using CAD software to create and modify engineering drawings.
I ...read more
Q52. What is the Difference Between L2 SWITCH & Router.
L2 switches operate at the data link layer and forward packets based on MAC addresses, while routers operate at the network layer and forward packets based on IP addresses.
L2 switches are used to connect devices within a local network, while routers are used to connect different networks.
L2 switches are faster than routers as they only need to look at the MAC address to forward packets, while routers need to look at the IP address.
L2 switches do not perform any network addres...read more
Q53. Where are construction joint is provide in simply supported slab?
Construction joints are provided at mid-span of simply supported slabs.
Construction joints are provided to allow for differential movement between adjacent sections of the slab.
They are typically located at mid-span of the slab, where the bending moment is zero.
The joint should be designed to transfer shear and moment between the two sections of the slab.
Proper reinforcement detailing is necessary to ensure the joint functions properly.
Construction joints can be formed using ...read more
Q54. What do you mean by slump test?
Slump test is a concrete testing method to measure the consistency and workability of fresh concrete.
Slump test is performed by filling a mold with fresh concrete, then removing the mold and measuring how much the concrete slumps or settles.
The result of the slump test indicates the workability of the concrete mix - a higher slump value indicates higher workability.
The slump test is commonly used in construction to ensure the concrete mix meets the desired consistency for pro...read more
Q55. What is the process of brick work?
The process of brick work involves laying bricks in a specific pattern using mortar to create walls or structures.
Prepare the surface by cleaning and dampening it
Lay a bed of mortar on the surface
Place the bricks in the desired pattern, ensuring they are level and aligned
Use a trowel to add more mortar between the bricks to secure them in place
Repeat the process for each layer of bricks until the desired height is reached
Finish by filling any gaps with mortar and smoothing th...read more
Q56. 1.What is HVDS Scheme. 2.How much time you will take to complete 1 km site drawing using AutoCad.
HVDS Scheme is a High Voltage Distribution System used for efficient power distribution. Time to complete 1 km site drawing varies based on complexity.
HVDS Scheme is a system for distributing electricity at higher voltages to reduce losses.
Time to complete 1 km site drawing in AutoCad depends on complexity, experience, and tools used.
For example, a simple site drawing may take a few hours, while a complex one may take days.
Q57. How to do you check window
To check a window, inspect its frame, glass, and hardware for any damage or wear.
Check the frame for cracks or warping
Inspect the glass for chips, cracks, or fogging
Test the hardware to ensure it opens and closes smoothly
Check for any gaps or drafts around the window
Look for signs of water damage or mold
Consider the age and condition of the window
Consult a professional if unsure about any issues
Q58. What is the construction Joint?
A construction joint is a planned break or gap in construction to allow for expansion, contraction, or movement of materials.
Construction joints are used in various types of structures, such as buildings, bridges, and roads.
They are typically created by leaving a gap between two sections of construction, which is later filled with a joint filler or sealant.
Construction joints help to prevent cracks and damage caused by the movement of materials due to temperature changes or s...read more
Q59. What is the ratio of pole grouting?
The ratio of pole grouting refers to the proportion of grout material used in relation to the size of the pole being grouted.
The ratio of pole grouting is typically expressed as a mix ratio of cement, sand, and water.
Common ratios for pole grouting include 1:2:3 (cement:sand:water) or 1:3 (cement:water).
The ratio may vary depending on the type of pole, soil conditions, and structural requirements.
Proper mixing and application of grout is essential for the stability and longev...read more
Q60. Measurment of sand aggregate, Steel, MS plate, Wood materials Battan, Ply, quality test for bulk material
Methods for measuring and testing various construction materials
Sand aggregate can be measured by weight or volume
Steel can be measured by weight or length
MS plate can be measured by thickness and size
Wood materials can be measured by length, width, and thickness
Quality tests for bulk materials can include strength, durability, and moisture content
Q61. What is Slump and It's Type?
Slump is a measure of consistency of concrete. It refers to the flowability of concrete.
Slump is determined by conducting a slump test on freshly mixed concrete.
It is measured in millimeters and indicates the workability of concrete.
Different types of slumps include true slump, shear slump, and collapse slump.
True slump occurs when concrete maintains a uniform shape after the slump test.
Shear slump indicates a lack of cohesion in the concrete mix.
Collapse slump occurs when th...read more
Q62. How do you interpret contract document and elobrate in the perspective of costing
Interpreting contract documents involves analyzing terms and conditions to determine cost implications.
Reviewing the scope of work outlined in the contract
Identifying all cost components such as materials, labor, equipment, and overhead
Analyzing payment terms and schedules to determine cash flow
Understanding any penalties or incentives related to project completion
Considering potential risks and contingencies that may impact costs
Using software tools like Excel or specialized...read more
Q63. Difference Between Online / Offline UPS. Network Connectivity.
Online UPS provides continuous power supply while Offline UPS switches to battery backup during power outage. Network connectivity allows remote monitoring and management.
Online UPS provides power supply through the battery all the time while Offline UPS switches to battery backup only when there is a power outage.
Online UPS provides better protection against power surges and spikes compared to Offline UPS.
Network connectivity in UPS allows remote monitoring and management of...read more
Q64. 2.what basic Register require for store handling?
The basic registers required for store handling include cash register, inventory register, and sales register.
Cash register is used to record all cash transactions in the store.
Inventory register is used to keep track of the stock levels and manage inventory.
Sales register is used to record all sales transactions and track sales performance.
Other registers may include return register, purchase register, and expense register.
Q65. 5. Unit weight of 1m³ cement?
Unit weight of 1m³ cement?
Unit weight of cement varies from 1440 to 1840 kg/m³ depending on the type of cement used.
The most commonly used cement, Portland cement, has a unit weight of 1506 kg/m³.
Unit weight is important in determining the amount of cement required for a project.
Q66. What is formwork deshuttering time?
Formwork deshuttering time refers to the duration required for removing the formwork or shuttering from a concrete structure.
Formwork deshuttering time is the period after which the formwork can be safely removed without affecting the structural integrity of the concrete.
It depends on various factors such as the type of concrete, ambient temperature, humidity, and the strength development of the concrete.
The deshuttering time is typically specified in the project specificatio...read more
Q67. What is minimum cement used for M30 grade of concrete. Answer is 320 kg
Minimum cement required for M30 grade of concrete is 320 kg.
M30 grade of concrete requires a minimum cement content of 320 kg/m3
The cement content may vary based on factors such as water-cement ratio, aggregate type, and quality of cement used
Q68. Which wire is used in 11 KV
11 KV wires typically use aluminum or copper conductors.
Aluminum and copper are commonly used conductors for 11 KV wires.
Aluminum conductors are lighter and cheaper, but have lower conductivity compared to copper.
Copper conductors have higher conductivity and are more durable, but are heavier and more expensive.
The choice between aluminum and copper conductors depends on factors like cost, weight, and conductivity requirements.
Q69. What software do you have experience with while doing estimation?
I have experience with various software such as Bluebeam, PlanSwift, and Excel.
Proficient in Bluebeam for takeoff and markup
Experienced in PlanSwift for digitizing and estimating
Skilled in Excel for creating detailed spreadsheets and formulas
Q70. whats is the difference between online ups and off line ups
Online UPS provides continuous power supply without any interruption while offline UPS provides power supply only when the main power source fails.
Online UPS is more expensive than offline UPS
Online UPS has a higher efficiency rate than offline UPS
Offline UPS has a faster response time than online UPS
Online UPS is used for critical applications like data centers, hospitals, and laboratories
Offline UPS is used for non-critical applications like personal computers and home appl...read more
Q71. What steps would you take to ensure environmental compliance on a construction site?
To ensure environmental compliance on a construction site, I would take several steps including conducting regular inspections, implementing erosion control measures, and properly disposing of hazardous materials.
Conduct regular inspections to ensure compliance with environmental regulations
Implement erosion control measures such as silt fences and sediment basins
Properly dispose of hazardous materials to prevent contamination of soil and water sources
Educate and train constr...read more
Q72. What should be done to improve security and safety of the assets?
To improve security and safety of assets, a comprehensive risk assessment should be conducted followed by implementation of appropriate security measures.
Conduct a comprehensive risk assessment to identify potential threats and vulnerabilities
Implement appropriate security measures such as access control, CCTV surveillance, and alarm systems
Train employees on security protocols and procedures
Regularly review and update security measures to adapt to changing threats
Establish a...read more
Q73. How deep is a pole erection
The depth of a pole erection varies depending on the type of pole and the soil conditions.
The depth of a pole erection is typically determined by the height of the pole and the type of soil it is being installed in.
In general, a pole should be buried at least one-third of its total length for stability.
For example, a 12-foot pole should be buried at least 4 feet deep.
In rocky or sandy soil, poles may need to be buried deeper for added stability.
Consult local building codes an...read more
Q74. What are the daily captivitys of putty manufacturing in your plant
The daily activities of putty manufacturing in our plant include mixing raw materials, testing the quality of the product, packaging, and labeling.
Mixing raw materials to create the putty
Testing the quality of the product to ensure it meets standards
Packaging the putty into containers
Labeling the containers with product information
Cleaning and maintaining equipment
Recording production data for quality control purposes
Q75. What's is the processing of concrete?
Processing of concrete involves mixing cement, water, and aggregates to create a strong and durable material.
Mixing cement, water, and aggregates in specific proportions
Pouring the mixture into molds or forms
Allowing the concrete to cure and harden over time
Finishing the surface of the concrete with tools or coatings
Testing the strength and durability of the finished product
Q76. What are the deductions considering while measuring plastering quantity?
Deductions considered while measuring plastering quantity
Deductions for openings such as doors and windows
Deductions for uneven surfaces or irregular shapes
Deductions for wastage during application
Deductions for overlaps in plastering layers
Deductions for thickness variations
Q77. 6. Volume a bag of cement??
Volume of a bag of cement?
A standard bag of cement weighs 50 kg
The volume of a bag of cement depends on its density
Assuming a density of 1440 kg/m³, the volume of a bag of cement is 0.0347 m³
Q78. How to track a project on daily basis in Primavera P6
To track a project in Primavera P6 on a daily basis, use the following steps.
Update progress for each activity daily
Review critical path activities regularly
Monitor resource allocation and availability
Compare planned vs. actual progress
Generate daily reports for stakeholders
Q79. How to calculate shuttering quantity.
Shuttering quantity can be calculated by determining the surface area of the formwork and multiplying it by the depth of the concrete.
Measure the length and width of the formwork
Calculate the surface area by multiplying the length and width
Multiply the surface area by the depth of the concrete to get the shuttering quantity
Account for any additional formwork needed for corners or edges
Q80. How much quantity will done 200 machine in hour
The quantity done by 200 machines in an hour depends on the efficiency and capacity of each machine.
The quantity done will depend on the output capacity of each machine
Factors such as machine speed, efficiency, and type of work being done will also impact the quantity produced
For example, if each machine can produce 10 units per hour, then 200 machines will produce 2000 units in an hour
Q81. How many 1 gallon
The question is incomplete and does not make sense.
The question is missing important information.
It is unclear what the question is asking for.
There is no context provided for the question.
Without more information, it is impossible to answer the question.
Q82. How do you know about overhead distribution system?
Overhead distribution system is a network of electrical lines and equipment used to distribute power from substations to consumers.
Overhead distribution systems consist of poles, wires, transformers, and insulators.
They are commonly used in rural areas and older urban areas.
Maintenance of overhead distribution systems includes regular inspections for damage and vegetation management.
Examples of overhead distribution systems include power lines running along streets and throug...read more
Q83. How you will plan out the resolve the security issues?
I will plan out the resolve the security issues by conducting a thorough risk assessment and implementing appropriate measures.
Conduct a risk assessment to identify potential security threats
Develop a security plan based on the identified risks
Implement appropriate security measures such as access control, surveillance, and training
Regularly review and update the security plan to ensure its effectiveness
Collaborate with other departments and stakeholders to ensure a comprehen...read more
Q84. What is micro planning of construction site?
Micro planning of construction site involves detailed planning and scheduling of activities to ensure efficient and timely completion of the project.
It involves breaking down the project into smaller tasks and assigning timelines for each task.
It includes identifying the resources required for each task and ensuring their availability.
Micro planning also involves monitoring the progress of each task and making necessary adjustments to ensure timely completion.
Examples of micr...read more
Q85. How to do carbon fibre rapping
Carbon fibre wrapping is a technique used to reinforce structures using carbon fibre sheets and epoxy resin.
Carbon fibre wrapping involves applying carbon fibre sheets to a surface using epoxy resin.
The surface to be wrapped should be cleaned and prepared before applying the carbon fibre sheets.
The carbon fibre sheets are cut to the desired size and shape, and then laid onto the surface.
Epoxy resin is applied to the carbon fibre sheets, saturating them and bonding them to the...read more
Q86. How can we receive Materials to store and what is the basic procedure
Materials can be received through purchase orders, deliveries, or transfers. The basic procedure involves receiving, inspecting, documenting, and storing the materials.
Materials can be received through purchase orders placed with suppliers.
Deliveries can be made directly to the storage location or to a designated receiving area.
Materials can also be received through transfers from other departments or locations.
The basic procedure involves receiving the materials, inspecting ...read more
Q87. What is the electrical material used before wall plastering?
Conduits and wiring are the electrical materials used before wall plastering.
Conduits are pipes or tubes used to protect and route electrical wiring before plastering.
Wiring refers to the electrical cables that will be hidden behind the plastered walls.
These materials are essential for safely and securely installing electrical systems in buildings.
Q88. Details for RCC road construction with specifications
RCC road construction involves using reinforced concrete for durability and strength.
RCC stands for Reinforced Cement Concrete
Specifications include using high-quality cement, aggregates, and steel reinforcement
Proper compaction and curing are essential for durability
Thickness of the RCC road depends on traffic load and subgrade conditions
Joint spacing should be as per design specifications
Q89. How to calculate steel quantity.
Steel quantity can be calculated by using the formula: (D^2/162) x Length of steel
Determine the diameter of the steel
Calculate the length of the steel required
Use the formula (D^2/162) x Length of steel to calculate the steel quantity
Consider wastage and additional steel required for overlaps and joints
Q90. Where is shear force and bending moment maximum.
Shear force is maximum at supports and Bending moment is maximum at mid-span.
Shear force is maximum at the supports where the load is applied.
Bending moment is maximum at mid-span where the beam is most likely to bend.
The location of maximum shear force and bending moment depends on the type of loading and support conditions.
For example, in a simply supported beam with a uniformly distributed load, the maximum bending moment occurs at mid-span and the maximum shear force occu...read more
Q91. How to Check Vendors bill and Subcontractors bills
To check vendors and subcontractors bills, review the invoices, verify the services provided, compare with contracts, ensure accuracy, and approve for payment.
Review the invoices received from vendors and subcontractors
Verify the services provided against the work orders or contracts
Compare the billed amounts with the agreed rates or pricing
Ensure accuracy of calculations, quantities, and descriptions
Check for any additional charges or discrepancies
Approve the bills for payme...read more
Q92. How Much Concrete Sampling?
Concrete sampling is the process of collecting representative samples of concrete for testing and quality control purposes.
Concrete sampling is essential to ensure the strength and durability of the concrete.
Samples are typically taken from different locations and depths within the concrete batch.
Sampling methods include using a scoop, a sampling tube, or a core drill.
The number of samples required depends on the project specifications and the size of the concrete batch.
Sampl...read more
Q93. What is unit of sand?
The unit of sand is typically measured in cubic meters or cubic feet.
The unit of sand is commonly measured in cubic meters (m³) or cubic feet (ft³).
Other units like kilograms (kg) or tons (metric or imperial) can also be used depending on the context.
For example, a construction project may require a certain amount of sand in cubic meters for concrete mixing.
Q94. What is Backup, How to Configure Backup.
Backup is the process of creating a copy of data to protect against loss. It can be configured using various methods.
Identify the data to be backed up
Choose a backup method (full, incremental, differential)
Select a backup location (external hard drive, cloud storage)
Schedule regular backups
Test backups to ensure data can be restored
Examples: Windows Backup and Restore, Time Machine for Mac, cloud backup services like Dropbox or Google Drive
Q95. What is the initial seting time
Initial setting time is the time taken by cement to harden to a certain degree.
Initial setting time is the time taken by cement to harden to a certain degree.
It is the time elapsed between the moment water is added to the cement and the time when the paste starts losing its plasticity.
The initial setting time of cement is generally around 30 minutes to 1 hour.
It is an important property of cement as it determines the time available for mixing, transporting, and placing the ce...read more
Q96. What are the different elements of a bridge?
A bridge consists of various components that work together to support the weight of the structure and the traffic it carries.
Foundation: supports the weight of the bridge and transfers it to the ground
Deck: the surface on which vehicles and pedestrians travel
Abutments: supports at the ends of the bridge that hold up the deck
Piers: supports in the middle of the bridge that hold up the deck
Girders: horizontal beams that support the deck
Cables: used in suspension bridges to supp...read more
Q97. What is the kwy skill of civil engineer ?
The key skill of a civil engineer is the ability to design and manage construction projects.
Designing and planning construction projects
Managing budgets and resources
Ensuring compliance with safety and building regulations
Problem-solving and decision-making
Communication and teamwork
Knowledge of engineering principles and materials
Ability to use computer-aided design (CAD) software
Project management skills
Attention to detail
Q98. Construction materials in details
Construction materials are substances used for building and construction purposes.
Construction materials include cement, concrete, bricks, steel, wood, and glass.
Cement is a binding agent used in the production of concrete.
Concrete is a mixture of cement, sand, gravel, and water, used for construction.
Bricks are rectangular blocks made of clay or concrete, used for building walls.
Steel is a strong and durable material used for structural purposes.
Wood is commonly used for fra...read more
Q99. What is function overloading and function overriding
Function overloading is having multiple functions with the same name but different parameters. Function overriding is redefining a base class function in a derived class.
Function overloading allows multiple functions with the same name but different parameters.
Function overriding involves redefining a base class function in a derived class with the same name and parameters.
Example of function overloading: void print(int x) and void print(double y)
Example of function overridin...read more
Q100. What is density of RCC.and pcc
Density of RCC is around 2500 kg/m3 and PCC is around 2400 kg/m3.
RCC stands for Reinforced Cement Concrete and PCC stands for Plain Cement Concrete.
Density of RCC depends on the mix design and the type of aggregates used.
Density of PCC is lower than RCC due to absence of reinforcement.
Density of concrete is an important factor in determining its strength and durability.