Filter interviews by
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
M20 Grade concrete ratio is 1:1.5:3 (cement:sand:aggregate)
M20 Grade concrete has a ratio of 1:1.5:3 for cement:sand:aggregate
This means for every 1 part of cement, 1.5 parts of sand and 3 parts of aggregate are used
The total proportion is 1:1.5:3 which is commonly used in construction projects
Plaster can be checked by examining its color, texture, hardness, and adhesion to the surface.
Check the color of the plaster for any discoloration or uneven patches.
Feel the texture of the plaster to ensure it is smooth and free of bumps or cracks.
Test the hardness of the plaster by gently tapping it with a tool or fingernail.
Check the adhesion of the plaster by trying to peel it off the surface.
To calculate the bar bending schedule (BBS) of a ring, you need to determine the diameter of the ring, the number of bars required, and the length of each bar.
Calculate the circumference of the ring using the formula 2 * π * r, where r is the radius of the ring.
Determine the spacing between the bars based on the design requirements and the diameter of the bars.
Calculate the total length of bars required by multiplying ...
I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before May 2018. There were 2 interview rounds.
I am currently earning $60,000 per year.
My current salary is $60,000 per year.
I am satisfied with my current salary.
I believe my salary reflects my experience and qualifications.
I was interviewed in Feb 2024.
Its very good, and nice
It's very good , some difficult question
I have a Bachelor's degree in Business Administration from XYZ University.
Bachelor's degree in Business Administration
Graduated from XYZ University
Specialized in management and leadership courses
I handle work pressure in civil line by prioritizing tasks, delegating when necessary, and maintaining open communication with my team.
Prioritize tasks based on deadlines and importance
Delegate tasks to team members to lighten workload
Maintain open communication with team to address any issues or concerns
Practice stress-relief techniques such as deep breathing or taking short breaks
Nagarjuna Construction Company interview questions for popular designations
I have 3 years of experience working as a civil engineer for a construction company.
Managed multiple construction projects simultaneously
Performed site inspections and ensured compliance with building codes
Collaborated with architects and contractors to resolve design issues
Get interview-ready with Top Nagarjuna Construction Company Interview Questions
I applied via Approached by Company
I have 10 years of experience in civil engineering.
10 years of experience in civil engineering
Worked on various projects including bridge construction and road design
Managed teams and coordinated with clients and stakeholders
Stay updated on industry trends and regulations
I have extensive experience working on railway projects, including design, construction, and maintenance.
Designed railway tracks to meet safety and operational standards
Managed construction of railway infrastructure such as bridges and tunnels
Performed regular inspections and maintenance to ensure smooth operation
Collaborated with stakeholders including government agencies and contractors
Implemented innovative solution
BBS full form is Bar Bending Schedule, which is a detailed list of reinforcement bars in a structure.
BBS stands for Bar Bending Schedule
It is a detailed list of reinforcement bars used in a structure
It includes information on bar sizes, shapes, quantities, and placement
BBS is essential for ensuring proper reinforcement in construction projects
I have worked at multiple engineering firms specializing in infrastructure projects.
Worked at XYZ Engineering firm for 5 years
Managed a team of engineers on various bridge construction projects
Collaborated with government agencies on road improvement initiatives
I was interviewed before Dec 2023.
The standard deduction as per IS 1200 is a fixed amount that can be deducted from the measured quantities of certain items in a construction project.
The standard deduction is typically used for items like scaffolding, formwork, and centering in construction projects.
It is a fixed percentage of the measured quantity, usually ranging from 2% to 5% depending on the item and project.
The purpose of the standard deduction is...
Material properties refer to the characteristics and behavior of materials used in construction projects.
Material properties include density, strength, durability, thermal conductivity, and elasticity.
Understanding material properties is crucial for selecting the right materials for a project.
Examples of material properties affecting construction include water absorption in concrete and thermal expansion in metals.
I applied via LinkedIn and was interviewed in Jan 2024. There were 2 interview rounds.
Implementing diversity training programs, creating affinity groups, promoting inclusive hiring practices, and fostering a culture of respect and acceptance.
Implement diversity training programs for all employees
Create affinity groups for underrepresented employees to connect and support each other
Promote inclusive hiring practices to attract diverse candidates
Foster a culture of respect and acceptance through communica
Power cuts can disrupt welding process, leading to incomplete or faulty welds. Proper precautions and backup power sources are essential.
Ensure backup power sources are available in case of power cuts
Implement surge protectors to prevent damage to welding equipment
Regularly maintain and inspect welding equipment to prevent issues
Train welders on proper procedures for handling power cuts during welding
Consider investing
I applied via AmbitionBox and was interviewed in May 2024. There was 1 interview round.
Top trending discussions
Some of the top questions asked at the Nagarjuna Construction Company interview -
The duration of Nagarjuna Construction Company interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 412 interviews
Interview experience
based on 3.7k reviews
Rating in categories
Junior Engineer
899
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Assistant Engineer
627
salaries
| ₹3.2 L/yr - ₹9 L/yr |
Senior Engineer
436
salaries
| ₹4.3 L/yr - ₹11 L/yr |
Junior Engineer Civil
378
salaries
| ₹2 L/yr - ₹7.5 L/yr |
Assistant Engineer - Civil
290
salaries
| ₹3.3 L/yr - ₹8.9 L/yr |
Larsen & Toubro Limited
TCS
BHEL
Infosys