  • Q1. What is safety?, What is Hazard, whats is responsibilities of safety officer, what is work permit system?
  • Q2. How many project are completed?
  • Q3. Job boundary in my area.
View all 8 questions

Nagarjuna Construction Company Interview Experiences

Popular Designations

312 interviews found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Coding Test 

It was easy sorting questions

Construction Engineer Interview Questions asked at other Companies

Q1. What's your biggest mistakes in your carrier?
View answer (4)

Assistant Engineer Interview Questions & Answers

user image Shailesh keshri

posted on 4 Dec 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. In which type of structures do you work currently?
  • Q2. What is the grade of concrete you use in your project or working Structures?
Round 2 - HR 

(2 Questions)

  • Q1. What is your total experience?
  • Q2. How much salary would you expect?

Top Nagarjuna Construction Company Assistant Engineer Interview Questions and Answers

Q1. Why do we take only 1 set of cube sample at a casting of concrete of 5 or less than 5 Meter cube.
View answer (9)

Assistant Engineer Interview Questions asked at other Companies

Q1. 1.Define the term capacitance & inductance 2.what is Rectifier 3. What is referred to the electron in the outer orbit 4.what kind of cable used in transmission line 5.Explain Rlc circuit 6.what happen if series current is double
View answer (4)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Group Discussion 

Group Dissection with telephone call

Senior Civil Engineer Interview Questions asked at other Companies

Q1. Why reinforcement is provided alternative in column?
View answer (5)

DEP Interview Questions & Answers

user image Anonymous

posted on 21 Mar 2025

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Sep 2024, where I was asked the following questions.

  • Q1. 1. Self introduction
  • Q2. 2. Work Experience
  • Ans. 

    Experienced in project management, focusing on planning and billing processes to ensure timely and budget-compliant project delivery.

    • Managed multiple projects simultaneously, ensuring adherence to timelines and budgets.

    • Implemented a new billing system that reduced discrepancies by 30%.

    • Collaborated with cross-functional teams to streamline planning processes.

    • Utilized project management software to track progress and all

  • Answered by AI

DEP Interview Questions asked at other Companies

Q1. Are you aware of software applications which are run for the capturing attendance and Payroll process.
View answer (1)

Nagarjuna Construction Company interview questions for popular designations

 Junior Engineer

 (26)

 Senior Engineer

 (15)

 Civil Engineer

 (15)

 Assistant Engineer

 (14)

 Assistant Engineer - Civil

 (10)

 Junior Engineer Civil

 (10)

 Civil Site Engineer

 (9)

 Graduate Engineer Trainee (Get)

 (6)

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Coding Test 

Data Structures,basics in java

Power BI Developer Interview Questions asked at other Companies

Q1. Types of joins in power Bi & SQL and how it works?
View answer (7)

Get interview-ready with Top Nagarjuna Construction Company Interview Questions

Project Engineer Interview Questions & Answers

user image ABHINANDAN KISHOR

posted on 10 Jun 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Billing Site work
  • Q2. Billing and Site work

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star Pattern Task Your task is to print a triangle pattern using stars (*) for a given integer N, which represents the number of rows. Input: Integer N (Total number of rows) Output: The triangle pattern printed over N lines Exampl... read more
View answer (12)

Jobs at Nagarjuna Construction Company

View all
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Which wire is used in 11 KV
  • Ans. 

    11 KV wires typically use aluminum or copper conductors.

    • Aluminum and copper are commonly used conductors for 11 KV wires.

    • Aluminum conductors are lighter and cheaper, but have lower conductivity compared to copper.

    • Copper conductors have higher conductivity and are more durable, but are heavier and more expensive.

    • The choice between aluminum and copper conductors depends on factors like cost, weight, and conductivity requ

  • Answered by AI
  • Q2. How deep is a pole erection
  • Ans. 

    The depth of a pole erection varies depending on the type of pole and the soil conditions.

    • The depth of a pole erection is typically determined by the height of the pole and the type of soil it is being installed in.

    • In general, a pole should be buried at least one-third of its total length for stability.

    • For example, a 12-foot pole should be buried at least 4 feet deep.

    • In rocky or sandy soil, poles may need to be buried ...

  • Answered by AI
  • Q3. And asked about the company behind
  • Q4. What is the ratio of pole grouting?
  • Ans. 

    The ratio of pole grouting refers to the proportion of grout material used in relation to the size of the pole being grouted.

    • The ratio of pole grouting is typically expressed as a mix ratio of cement, sand, and water.

    • Common ratios for pole grouting include 1:2:3 (cement:sand:water) or 1:3 (cement:water).

    • The ratio may vary depending on the type of pole, soil conditions, and structural requirements.

    • Proper mixing and appl...

  • Answered by AI
  • Q5. What is the ratio of pole grouting?
  • Ans. 

    The ratio of pole grouting refers to the proportion of grout material used in relation to the size of the pole being grouted.

    • The ratio of pole grouting is typically expressed as a mix ratio of grout material to water or other additives.

    • For example, a common ratio for pole grouting could be 1:3, meaning 1 part grout material to 3 parts water.

    • The specific ratio used will depend on factors such as the type of pole, soil c

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If possible please get me rejoining.

Top Nagarjuna Construction Company Junior Engineer Interview Questions and Answers

Q1. What is the unit weight of 1. 32mm dia steel 2. 25mm dia steel 3. 20mm dia steel 4. 16mm dia steel 5. 10mm dia steel 6. 08mm dia steel 7. 06mm dia steel?
View answer (3)

Junior Engineer Interview Questions asked at other Companies

Q1. What is the main role of Junior engineer in Electrical maintenance and How to provide the company facilities ?
View answer (25)

Assistant Engineer Interview Questions & Answers

user image Krishna Gore

posted on 17 Jul 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. About previous work experience
  • Q2. Difficulties in work

Top Nagarjuna Construction Company Assistant Engineer Interview Questions and Answers

Q1. Why do we take only 1 set of cube sample at a casting of concrete of 5 or less than 5 Meter cube.
View answer (9)

Assistant Engineer Interview Questions asked at other Companies

Q1. 1.Define the term capacitance & inductance 2.what is Rectifier 3. What is referred to the electron in the outer orbit 4.what kind of cable used in transmission line 5.Explain Rlc circuit 6.what happen if series current is double
View answer (4)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Experience of previous organisations

Interview Preparation Tips

Interview preparation tips for other job seekers - Provide All the Documents which you guys Mention at CV while Joining else Don’t Show if you Don’t have Documents. If you didn’t Submit Our Organisation will Not Give Appointment Letter & will keep you as a Sub/Temporary Staff & Proper Facilities will Not be Provided.

Safety Officer Interview Questions asked at other Companies

Q1. If you don't have any safety equipment and documents how to complete the work ?
View answer (18)
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. What is mean by shear key
  • Ans. 

    Shear key is a device used to transfer shear forces between two components in a structure.

    • Shear keys are typically used in construction joints to prevent sliding between adjacent components.

    • They are designed to resist horizontal forces and ensure stability.

    • Shear keys can be found in structures such as bridges, buildings, and dams.

    • Examples include shear keys in bridge expansion joints to prevent movement between bridge

  • Answered by AI
  • Q2. Different between columns and beams
  • Ans. 

    Columns are vertical structural members that support loads, while beams are horizontal members that transfer loads to columns or walls.

    • Columns are vertical and primarily support compressive loads.

    • Beams are horizontal and primarily support bending loads.

    • Columns are typically taller than they are wide, while beams are typically wider than they are tall.

    • Examples: In a building, columns support the weight of the floors abo...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Ss

Structural Engineer Interview Questions asked at other Companies

Q1. 1. Find weight and COG of an irrrgular shape. Unit weight of member was given. 2. Calculate force required for COG shift. W load was applied at center of rectangle and we had to calculate forces at all four corners to shift the cog. 3. SFD ... read more
View answer (2)

Nagarjuna Construction Company Interview FAQs

How many rounds are there in Nagarjuna Construction Company interview?
Nagarjuna Construction Company interview process usually has 2-3 rounds. The most common rounds in the Nagarjuna Construction Company interview process are Technical, HR and Resume Shortlist.
How to prepare for Nagarjuna Construction Company interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Nagarjuna Construction Company. The most common topics and skills that interviewers at Nagarjuna Construction Company expect are Quantity Surveying, Resource Planning, Rate Analysis, Primavera and QS.
What are the top questions asked in Nagarjuna Construction Company interview?

Some of the top questions asked at the Nagarjuna Construction Company interview -

  1. Why do we take only 1 set of cube sample at a casting of concrete of 5 or less ...read more
  2. How do we take slump for casting of concrete and what if when we go rise about ...read more
  3. What is the minimum thickness of grade s...read more
How long is the Nagarjuna Construction Company interview process?

The duration of Nagarjuna Construction Company interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Nagarjuna Construction Company Interview Process

based on 431 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 749 Interviews
Tata Projects Interview Questions
4.2
 • 440 Interviews
KEC International Interview Questions
4.0
 • 302 Interviews
Dilip Buildcon Interview Questions
4.0
 • 143 Interviews
G R Infraprojects Interview Questions
4.1
 • 134 Interviews
AtkinsRealis Interview Questions
3.9
 • 87 Interviews
GMR Group Interview Questions
4.0
 • 83 Interviews
View all

Nagarjuna Construction Company Reviews and Ratings

based on 3.8k reviews

4.1/5

Rating in categories

3.8

Skill development

3.8

Work-life balance

3.9

Salary

4.1

Job security

3.8

Company culture

3.6

Promotions

3.8

Work satisfaction

Explore 3.8k Reviews and Ratings
Junior Engineer
908 salaries
unlock blur

₹1.8 L/yr - ₹6 L/yr

Assistant Engineer
638 salaries
unlock blur

₹2.4 L/yr - ₹9 L/yr

Senior Engineer
398 salaries
unlock blur

₹4.3 L/yr - ₹11 L/yr

Junior Engineer Civil
367 salaries
unlock blur

₹2 L/yr - ₹6.5 L/yr

Assistant Engineer - Civil
292 salaries
unlock blur

₹3.3 L/yr - ₹8.9 L/yr

Explore more salaries
Compare Nagarjuna Construction Company with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview