Filter interviews by
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in Mar 2021. There was 1 interview round.
I applied via Walk-in and was interviewed before Jun 2021. There were 2 interview rounds.
Nagarjuna Construction Company interview questions for popular designations
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
Get interview-ready with Top Nagarjuna Construction Company Interview Questions
I applied via Recruitment Consultant and was interviewed before Dec 2020. There was 1 interview round.
I applied via Referral and was interviewed before Oct 2020. There were 6 interview rounds.
posted on 22 Feb 2021
To check vendors and subcontractors bills, review the invoices, verify the services provided, compare with contracts, ensure accuracy, and approve for payment.
Review the invoices received from vendors and subcontractors
Verify the services provided against the work orders or contracts
Compare the billed amounts with the agreed rates or pricing
Ensure accuracy of calculations, quantities, and descriptions
Check for any addi...
I applied via Naukri.com and was interviewed before Apr 2021. There were 2 interview rounds.
The installation process for a 100 KVA DTR involves site preparation, foundation construction, equipment placement, wiring, and testing.
Prepare the site by clearing the area and ensuring proper drainage
Construct a foundation that is level and able to support the weight of the DTR
Place the DTR on the foundation and secure it in place
Connect the wiring according to the manufacturer's instructions
Test the DTR to ensure it
Earthing procedure for a distributor transformer involves connecting the transformer to a grounding system.
The transformer should be connected to a grounding system using a grounding electrode.
The grounding electrode should be buried in the earth at a depth of at least 2.5 meters.
The grounding electrode should be made of copper or galvanized iron.
The grounding system should have a resistance of less than 1 ohm.
The eart...
Planning and executing a 1 KM 11KV transmission line requires careful consideration of various factors.
Conduct a site survey to determine the route and identify any obstacles
Design the transmission line based on the load requirements and voltage drop calculations
Obtain necessary permits and approvals from local authorities
Procure materials and equipment required for construction
Ensure safety measures are in place durin...
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
The question is incomplete and does not make sense.
The question is missing important information.
It is unclear what the question is asking for.
There is no context provided for the question.
Without more information, it is impossible to answer the question.
The M-5 to M-25 ratio is a measure used in civil engineering to determine the strength of concrete mixtures.
The M-5 to M-25 ratio refers to the ratio of cement, sand, and aggregate in a concrete mixture.
The ratio indicates the compressive strength of the concrete after 28 days of curing.
For example, an M-20 concrete mix has a ratio of 1:1.5:3, which means 1 part cement, 1.5 parts sand, and 3 parts aggregate by volume.
T...
Top trending discussions
Some of the top questions asked at the Nagarjuna Construction Company interview -
The duration of Nagarjuna Construction Company interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 414 interviews
Interview experience
based on 3.7k reviews
Rating in categories
Junior Engineer
896
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Assistant Engineer
626
salaries
| ₹3.2 L/yr - ₹9 L/yr |
Senior Engineer
434
salaries
| ₹4.3 L/yr - ₹11 L/yr |
Junior Engineer Civil
378
salaries
| ₹2 L/yr - ₹7.5 L/yr |
Assistant Engineer - Civil
290
salaries
| ₹3.3 L/yr - ₹8.9 L/yr |
Larsen & Toubro Limited
TCS
BHEL
Infosys