I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Most questions are about the practical knowledge and some basics of construction engineering

Interview Preparation Tips

Interview preparation tips for other job seekers - Study some basics and sharpen your knowledge of practical skills in the field you are working on , have confidence and positivity .

Top Nagarjuna Construction Company Junior Engineer Civil Interview Questions and Answers

Q1. 2. What is water cement ratio??
View answer (4)

Junior Engineer Civil Interview Questions asked at other Companies

Q1. What is your name Where are you from Ratio of M 20 grade concrete. How to find the weight of steel bar used in reinforcement ? How to measurements the concrete volume? Standard size of brick. What is volume of cement bag 50 kg? How to calcu... read more
View answer (2)

Surveyor Interview Questions & Answers

user image Anonymous

posted on 20 Apr 2022

I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - I am wrok to NCC limited Arokkonam site to wrok

Surveyor Interview Questions asked at other Companies

Q1. How much bench marks important your total station for centre line marking.
View answer (3)

I applied via Recruitment Consultant and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview is good thans naukari. Com

QA/QC Civil Engineer Interview Questions asked at other Companies

Q1. What to do when any building material come at site, and their testing.
View answer (1)

I applied via Walk-in and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Project work details and construction management planning
  • Q2. Quantity surveying & building materials

Interview Preparation Tips

Interview preparation tips for other job seekers - Be yourself and confident explain in detail

Top Nagarjuna Construction Company Civil Engineer Interview Questions and Answers

Q1. 1.what is a civil engineer Ans. Civil engineers is a one of the most important parts of the engineering branch in which design the structure. Bridge. Dam road etc.
View answer (3)

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (20)

Nagarjuna Construction Company interview questions for popular designations

 Junior Engineer

 (22)

 Civil Engineer

 (14)

 Senior Engineer

 (14)

 Assistant Engineer

 (12)

 Assistant Engineer - Civil

 (10)

 Junior Engineer Civil

 (10)

 Civil Site Engineer

 (9)

 Graduate Engineer Trainee (Get)

 (6)

Junior Engineer Interview Questions & Answers

user image MANOJ KUMAR BARIK

posted on 19 Jun 2022

I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Pipeline related laying, jointing, Hydrotest, House connection
  • Q2. Wtp, Esr, cwr, intake related technical

Interview Preparation Tips

Interview preparation tips for other job seekers - Salery discussion and location related

Top Nagarjuna Construction Company Junior Engineer Interview Questions and Answers

Q1. What is the unit weight of 1. 32mm dia steel 2. 25mm dia steel 3. 20mm dia steel 4. 16mm dia steel 5. 10mm dia steel 6. 08mm dia steel 7. 06mm dia steel?
View answer (3)

Junior Engineer Interview Questions asked at other Companies

Q1. What is the main role of Junior engineer in Electrical maintenance and How to provide the company facilities ?
View answer (25)

Get interview-ready with Top Nagarjuna Construction Company Interview Questions

I applied via Recruitment Consultant and was interviewed before Dec 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Quantity Surveying, Rate Analysis, Labour Rate, Reconciliation, BBS

Interview Preparation Tips

Interview preparation tips for other job seekers - I interview was good.
Good technical question I have faced.
Normal question was there and if anyone have general knowledge of Quantity survey, he can crack the interview.

Quantity Surveyor Interview Questions asked at other Companies

Q1. What will you do if the site qty differ from Drawing qty
View answer (8)

Jobs at Nagarjuna Construction Company

View all

I applied via Referral and was interviewed before Oct 2020. There were 6 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. The interview is going to based on, what u r mentioned in u r resume.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Prepared. The interview is not difficult when we r confident about out job profile.

Senior Accounts Assistant Interview Questions asked at other Companies

Q1. what do you know about 194Q TDS?
View answer (2)

Interview Questionnaire 

2 Questions

  • Q1. GST ?
  • Q2. How to Check Vendors bill and Subcontractors bills
  • Ans. 

    To check vendors and subcontractors bills, review the invoices, verify the services provided, compare with contracts, ensure accuracy, and approve for payment.

    • Review the invoices received from vendors and subcontractors

    • Verify the services provided against the work orders or contracts

    • Compare the billed amounts with the agreed rates or pricing

    • Ensure accuracy of calculations, quantities, and descriptions

    • Check for any addi...

  • Answered by AI

Manager/Sr Manager - Facility Management Interview Questions asked at other Companies

Q1. What is best strategy to ensure you are spending within your allocated budget.
View answer (3)

I applied via Naukri.com and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Describe the installation process for a 100 KVA DTR.
  • Ans. 

    The installation process for a 100 KVA DTR involves site preparation, foundation construction, equipment placement, wiring, and testing.

    • Prepare the site by clearing the area and ensuring proper drainage

    • Construct a foundation that is level and able to support the weight of the DTR

    • Place the DTR on the foundation and secure it in place

    • Connect the wiring according to the manufacturer's instructions

    • Test the DTR to ensure it

  • Answered by AI
  • Q2. Describe the earthing procedure for a distributor transformer.
  • Ans. 

    Earthing procedure for a distributor transformer involves connecting the transformer to a grounding system.

    • The transformer should be connected to a grounding system using a grounding electrode.

    • The grounding electrode should be buried in the earth at a depth of at least 2.5 meters.

    • The grounding electrode should be made of copper or galvanized iron.

    • The grounding system should have a resistance of less than 1 ohm.

    • The eart...

  • Answered by AI
  • Q3. How will you plan and execute a 1 KM 11KV Transmission Line?
  • Ans. 

    Planning and executing a 1 KM 11KV transmission line requires careful consideration of various factors.

    • Conduct a site survey to determine the route and identify any obstacles

    • Design the transmission line based on the load requirements and voltage drop calculations

    • Obtain necessary permits and approvals from local authorities

    • Procure materials and equipment required for construction

    • Ensure safety measures are in place durin...

  • Answered by AI
Round 2 - HR 

(4 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Why should we hire you?
  • Q4. Tell me about yourself.

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Assistant Electrical Engineer interview:
  • Distribution Network
  • Aerial Bunched Cable
  • Distribution Transformers
  • Earthing Calculation
Interview preparation tips for other job seekers - Need to have sound technical knowledge and interviews are tough.

Assistant Electrical Engineer Interview Questions asked at other Companies

Q1. How will you plan and execute a 1 KM 11KV Transmission Line?
View answer (1)

I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. How many 1 gallon
  • Ans. 

    The question is incomplete and does not make sense.

    • The question is missing important information.

    • It is unclear what the question is asking for.

    • There is no context provided for the question.

    • Without more information, it is impossible to answer the question.

  • Answered by AI
  • Q2. M-5 to M-25 ratio
  • Ans. 

    The M-5 to M-25 ratio is a measure used in civil engineering to determine the strength of concrete mixtures.

    • The M-5 to M-25 ratio refers to the ratio of cement, sand, and aggregate in a concrete mixture.

    • The ratio indicates the compressive strength of the concrete after 28 days of curing.

    • For example, an M-20 concrete mix has a ratio of 1:1.5:3, which means 1 part cement, 1.5 parts sand, and 3 parts aggregate by volume.

    • T...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It was very good, my interview was such that I would be

Top Nagarjuna Construction Company Civil Engineer Interview Questions and Answers

Q1. 1.what is a civil engineer Ans. Civil engineers is a one of the most important parts of the engineering branch in which design the structure. Bridge. Dam road etc.
View answer (3)

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (20)

Nagarjuna Construction Company Interview FAQs

How many rounds are there in Nagarjuna Construction Company interview?
Nagarjuna Construction Company interview process usually has 2-3 rounds. The most common rounds in the Nagarjuna Construction Company interview process are Technical, HR and Resume Shortlist.
How to prepare for Nagarjuna Construction Company interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Nagarjuna Construction Company. The most common topics and skills that interviewers at Nagarjuna Construction Company expect are Quantity Surveying, Resource Planning, Rate Analysis, Primavera and QS.
What are the top questions asked in Nagarjuna Construction Company interview?

Some of the top questions asked at the Nagarjuna Construction Company interview -

  1. Why do we take only 1 set of cube sample at a casting of concrete of 5 or less ...read more
  2. How do we take slump for casting of concrete and what if when we go rise about ...read more
  3. What is the minimum thickness of grade s...read more
How long is the Nagarjuna Construction Company interview process?

The duration of Nagarjuna Construction Company interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Nagarjuna Construction Company Interview Process

based on 414 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.5k Interviews
Infosys Interview Questions
3.6
 • 7.6k Interviews
Wipro Interview Questions
3.7
 • 5.7k Interviews
Tech Mahindra Interview Questions
3.5
 • 3.9k Interviews
HCLTech Interview Questions
3.5
 • 3.8k Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
View all

Nagarjuna Construction Company Reviews and Ratings

based on 3.7k reviews

4.1/5

Rating in categories

3.8

Skill development

3.8

Work-life balance

3.9

Salary

4.1

Job security

3.8

Company culture

3.6

Promotions

3.8

Work satisfaction

Explore 3.7k Reviews and Ratings
Quantity Surveyor / Billing Engineer

Pune,

Mumbai

3-8 Yrs

Not Disclosed

Job Opening For ELV Design Engineer @ Hyderabad

Hyderabad / Secunderabad

6-11 Yrs

Not Disclosed

Explore more jobs
Junior Engineer
896 salaries
unlock blur

₹1.8 L/yr - ₹6 L/yr

Assistant Engineer
626 salaries
unlock blur

₹3.2 L/yr - ₹9 L/yr

Senior Engineer
434 salaries
unlock blur

₹4.3 L/yr - ₹11 L/yr

Junior Engineer Civil
378 salaries
unlock blur

₹2 L/yr - ₹7.5 L/yr

Assistant Engineer - Civil
290 salaries
unlock blur

₹3.3 L/yr - ₹8.9 L/yr

Explore more salaries
Compare Nagarjuna Construction Company with

Larsen & Toubro Limited

4.0
Compare

TCS

3.7
Compare

BHEL

4.1
Compare

Infosys

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview